Perhitungan Tulangan Geser Balok Anak Dan Contoh SoalFull description
Deskripsi lengkap
http:\\www.alizaka.blogspot.com
Full description
CAP
untuk pekerjaan pondasi bawah
hitungan pondasi pada perencanaan rumah kayuFull description
contoh perhitungan sheetpileFull description
hitungan pondasi pada perencanaan rumah kayuDeskripsi lengkap
contoh perhitungan sheetpileDeskripsi lengkap
Perhitungan Tulangan Geser Balok Anak Dan Contoh SoalDeskripsi lengkap
J ob No
Company Name
Sheet No
1
Engineer
Date
Checked
Date
Approved
Date
Job Title
Client
Rev
F ile Detail Tulangan Tiang Dt/Tm 18-Apr-2018 21:03
Input Pile Property Data I t em Total Pile Length Pile Length Over EGL Diameter Pile Head Condition Modulus of Elasticity
Value
Unit
14 0.5 0.4 Fixed 24000
m m m MPa
Soil Property Data I t em
Value
Type of Soil Unconfined Co Compressive St Strength of of Cl Clayey so soil
Unit
PreLoaded Cl Greater th tha
Loads Data I t em
Value
Designed Max. Vert. Load Capacity Designed Lat. Load Capacity Allowable Deflection
800 100 0.03
Unit kN kN m
Constants I t em Grade of Concrete Grade of Steel
Value
Unit
M15 Fe 250
Reinforcement Details I t em Clear Cover Dia.of Main Reinforcement(mm) Minimum Steel % Maximum Steel % Dia.of Transverse Reinforcement Type of Transverse Reinf Minimum Spacing for Transverse Reinf Maximum Spacing for Transverse Reinf
Print Time/Date: 04/18/2018 21:16
Value 0.05 20 0.4 4 10 Circular 0.1 0.3
STAAD.etc Release 4.5
Unit m
m m
Page 1 of 5
J ob No
Company Name Job Title
Client
Sheet No
2
Engineer
Date
Checked
Date
Approved
Date
Rev
F ile Detail Tulangan Tiang Dt/Tm 18-Apr-2018 21:03
Dia. Dia. of Reinf einfor orce ceme ment nt (mm) (mm)
Spac Spacin ing. g. of Reinf einfor orce ceme ment nt (mm) (mm)
Circular
10
140.00
Print Time/Date: 04/18/2018 21:16
STAAD.etc Release 4.5
Page 2 of 5
J ob No
Company Name
Sheet No
3
Engineer
Date
Checked
Date
Approved
Date
Job Title
Client
Rev
F ile Detail Tulangan Tiang Dt/Tm 18-Apr-2018 21:03
Calculation
D esi sigg n of of P i le less : P ond nda asi B or P i le M ena narr a M asji sjid d DESIGN CALCULATIONS Calculation of Length of Fixity Total Length of Pile = 14.00 m Length of Pile Over Ground Level, L1 = 0.50 m Diameter of Pile= 400.00 mm Modulus of Elasticity of Concrete = 24000.00 N/mm2 Pile Head Condition = Fixed Type of Soil = Preloaded Clay Moment of Inertia = 1256637061.44 mm4 K2 = 195.50 Kg/cm2 R= 1114.47 mm L1/R = 0.45 Corresponding value of Lf/R = 1.83 , where Lf = Length of Fixity Length of Fixity, Lf = 2.04 m
Checking of Deflection Lateral Load Capacity of Pile, Q = 100.00 KN Actual Lateral Deflection = 4.53 mm Allowable Lateral Deflection = 30.00 mm Allowable Lateral Deflection > Actual Lateral Deflection, Hence O.K.
Final Loads and Moments Calculation Gross Vertical Load Capacity of Pile = 800.00 KN Maximum Moment Moment Due to Lateral Load, Q = Q(L1 + Lf)^3 / 12EI = 127.02 KNm Moment Reduction Factor = 0.81 Final Reduced Moment = 102.93 KNm
Calculation of Reinforcements Required Percentage of Steel = 3.69 Required Area of Steel = 4643.27 mm2
Print Time/Date: 04/18/2018 21:16
STAAD.etc Release 4.5
Page 3 of 5
J ob No
Company Name
Sheet No
4
Engineer
Date
Checked
Date
Approved
Date
Job Title
Client
Rev
F ile Detail Tulangan Tiang Dt/Tm 18-Apr-2018 21:03
Calculation, cont... Dia of Main Reinforcement = 20.00 mm Area of Main Reinforcement Reinforcement = 314.16 mm2 Total no. of Bars reqd. = 15.00 Total no. of Bars Provided. = 15.00 Area of Steel Provided. = 4712.39 mm2 Percentage of Steel Provided. = 3.75
Check For Shear Type of Stirrup. = Circular Dia of Stirrup. = 10.00 mm Area of Stirrup. = 78.54 mm2 Actual Shear Stress, Tau_V. = 1.10 n/mm2 Allowable Shear Stress, Tau_C. = 0.65 n/mm2 Actual Shear Stress, Tau_V > Allowable Shear Stress Tau_C Vus. = 41.02 KN Calculated Spacing of Stirrups = 141.61 mm Final Provided Spacing = 140.00 mm
Print Time/Date: 04/18/2018 21:16
STAAD.etc Release 4.5
Page 4 of 5
J ob No
Company Name Job Title
Client
Sheet No
5
Engineer
Date
Checked
Date
Approved
Date
Rev
F ile Detail Tulangan Tiang Dt/Tm 18-Apr-2018 21:03