INGENIERIA DE MANIOBRAS DE MONTAJE
Descripción completa
INGENIERIA DE MANIOBRAS DE MONTAJE
Rigging Procedure
INGENIERIA DE MANIOBRAS DE MONTAJE
SAFE RIGGING PROCEDURES - A HIGHLY INFOMATIVE HANDBOOK FOR CONSTRUCTION ENGINEERSDescripción completa
R
20 00 0
RIGGING PLAN LIFTING FOR POWER CONTROL CENTERS CRANE LAY OUT MOVING OBJECT FROM A TO B A
B
RIGGING DEPARTMENT ANALYZE AND PLANED ACTIVITY FOR LIFTING AND ERECTION WORK START
No
05. RIGGING TOOLS No Equipment 01 Sling dia. 1.5" x 13 M 02 Chain Block 03 Shackle SWL 04 Manila Rope 7/8"x10M
Qty 4 pcs 2 pcs 10 pcs 2 pcs
Capacities 17 ton 10 ton 10 ton
06. SAFETY REQUIREMENTS No Equipment 01 Safety Barricade Red White 02 Safety Cone
Qty 77 mtr 7 pcs
07. SAFETY FACTOR CALCULATION No Equipment 01 Weight of material 02 Crane Block 03 Wire Sling 04 Spreader Beam 05 Shackle 06 Total Weight 07 Crane Capacity
Qty 22.00 T 1.33 T 0.15 T 0.60 T 0.15 T 24.23 T 26.62 T
48
80 ton
Remark New New New
ME TER
Capacities 150 ton
TAILING DESIGN
MONO CRANE
Risk
Qty 1 unit 1 unit 1 unit
OM
Yes
04. EQUIPMENT No Equipment 01 Crawler Crane 02 Boom Length 48 meter 03 Trailer
BO
REFERENCE 1. RIGGING BOOK 2. EQUIPMENT MANUAL 3. ASME B30.5-2004 Mobil & Locomotive cranes 4. ASME B30.6-2003 Derrick 5. ASME B30.10-1999 Hook 6. ASME B30.21-2005 manually lever operated hoist ASME B30.24-2003 Safety standard for cranes,derrick, hoist, jacks, and Sling 8. ASME B30.26-2004 Rigging Hardware 9. BS EN 5973 Scaffolding 10. Australian Standard, AS 3569--1989, Wire ropes 11. Australian Standard, AS 2759--1985, Wire ropes
NEED DUO CRANE
02. SCOPE OF APPLICATION Rigging study is describe the guidelines and operating step of Lifting Power Control Centers. 03. REFERENCE 1. HaGun Engineering RIGGING DEPARTMENT REFERENCE
DATA MATERIAL 1. DIMENSION 2. WEIGHT
7.
01. OBJECTIVE Rigging Study of Lifting Power Control Centers.
JOB SAFETY ANALISYS
RIGGING PLAN
3 METER SLING 1
Safe
ACTION
08
1.1
26.62 SF = 24.23 = 1.1
CONTROL
Final Inspection by HaGun Engineering
Safety Factor
No
Steel plates 1.5m x 6m x 20 mm thk for track
Yes Prepare Final Report for ApprovaL Handover FINISH