Job Safety Analysis (JSA) VDU Revamp Project
COMPANY:
SENDAN/ RIYAN GULF
DATE:
JSA NO:
(SUB-CON’)
WORK: Removing of Concrete by using J ackhammer
EQUIPMENT/ TOOLS USED:. Air Compressor, Jackhammer
NAME
PREPARED BY: CONSTRUCTION
POSITION
Furqan Ahmad Nazir Ahmad
REVIEW BY: HSE
SIGNATURE
Project Engineer HSE Supervisor
Activity Order
Potential Hazards
Risk Rating
Hazard Control Proactive Measures
Risk Rating
List the steps required to perform the task in the sequence they are carried out.
Against each step list the potential hazards that could cause injury when the task is performed
L/M/H
For each hazard identified list the control measures required to eliminate or minimise the risk of injury.
L/M/H
Maintain equipment
Equipment damage or failure Personal injury
M
Set up Equipment
Equipment damage Slips, trips, falls
M
Complete Daily Equipment Checklist. Familiarize yourself with Operators Manual Familiarize yourself with instructions on compressor All personnel in this area must have on hearing protection Check overall condition of compressor and jackhammer Check oil and fuel levels. Check all fittings and hose connections, if hose is worn or connections and/or bands on hoses appear suspect-remove and replace immediately, when not in use store hoses off of the ground
L
L
Job Safety Analysis (JSA)
Running compressor
Equipment damage Fire hazard Slips, trips, falls Improper clothing Personnel burn while refuelling compressor Dust or organic vapours
M
Fuelling compressor
Fire hazard Spill Eye injury from splash
M
Choose level area to set up compressor, chock wheels. Ensure that hose whiplash arrestor are on both the compressor end and the jackhammer end, tighten loops to avoid slippage, use cotter pins or tie wire at Chicago fittings to positively lock connections Make sure hose is out of the walking/working area minimizing trip hazards. Inspect and barricade area with warning signage around compressor for any tools/objects that may pose a tripping hazard Check the fuel level in compressor Set compressor to appropriate pressure for use. Be aware of anything that may get hot or burn around compressor. Have proper size and type of fire extinguisher within 15 feet of work area with trained fire watchman. Remove any flammable items from work area. Allow compressor time to cool down before fuelling, at least 5 minutes When stopping, some compressors may need to go through cooling cycle. Read instructions on side of compressor to determine if it requires cooling cycle, release any stored air in compressor when done for the day and before disconnecting hoses, keep valve closed when connecting/disconnecting
L
L
Job Safety Analysis (JSA)
End of task
Slips, trips, falls Traffic hazards Pinch points
M
hoses Fire extinguisher within 15 feet of refuelling. Use spill rag to catch any overspill of diesel or kerosene. Maintain clear travel paths Pick up all tools, materials, and debris. Ensure work area is secure Return all tools to proper location. Dispose of all debris in proper container.
ADDITIONAL HAZARDS IDENTIFIED
CONTROL MEASURES
Workers unaware of job hazards No Proper supervision Working without Permit
SULZER CONSTRUCTION DEPARTMENT HSE. DEPARTMENT