MS for Underground Piping
Descrição: some serial numbers could be used
Civil Activities
SOP for US universities
Ms Excel FormulasFull description
Makalah Seminar Kasus RHD MSFull description
Full description
Full description
designFull description
SX1722
COMPANY COMMENTS
A
A B C D
APPROVED WITHOUT COMMENT - WORK MAY PROCEED APPROVED WITH MINOR COMMENTS– WORK MAY PROCEED -REVISE AND RESUBMIT REVISE AND RESUBMIT – WORK MAY PROCEED SUBJECT TO INCORPORATION OF COMMENTS INDICATED APPROVAL NOT REQUIRED. INFORMATION ONLY. WORK MAY PROCEED
F
AS-BUILT / ACCEPTED AS FINAL
R
REJECTED - REVISE AND RESUBMIT. WORK NOT TO PROCEED.
V
VOID (DOCUMENT HAS BEEN CANCELLED / DELETED)
W thout pre ud ce to Contractor's rght under the Sub-Contract,
Code 2 - Comments as noted. Re-submission required 40965 2
MT
Const 28-9-16
A B C D
APPROVED WITHOUT COMMENT - WORK MAY PROCEED APPROVED WITH MINOR COMMENTS– WORK MAY PROCEED -REVISE AND RESUBMIT REVISE AND RESUBMIT – WORK MAY PROCEED SUBJECT TO INCORPORATION OF COMMENTS INDICATED APPROVAL NOT REQUIRED. INFORMATION ONLY. WORK MAY PROCEED
40965
F
AS-BUILT / ACCEPTED AS FINAL
R
REJECTED - REVISE AND RESUBMIT. WORK NOT TO PROCEED.
V
VOID (DOCUMENT HAS BEEN CANCELLED / DELETED)
W thout pre ud ce to Contractor's rght under the Sub-Contract, Contractor's review of this document does not relieve SubContractor of the responsibility for correctness under the sub contract. Permission to proceed does not constitute acceptance of design, detail and calculations, test methods or material developed or selected by the Sub-Contractor and does not relieve the SubContractor from full compliance with its obligations under the SubContract. Name/Signature ______________________________________ For Petrofac-Samsung-CB&I Joint Venture
Code 2 - Comments as noted. Re-submission required
Date ______________
2
MT
Const 28-9-16
30.48.40.31 -TSA, PV 30.48.00.31- Gen. Protective coatings for onshore facilities, PV
Storage condition shall be as per Manfacture's Recommendation
Add: DEP PV 30484031-P6000FP-000-PV-Clause 2.5 "Items which have been exposed to a salty atmosphere during transit, storage or after erection shall be thoroughly washed with potable water containing less then 50 ppm chlorides and dried.
Attached all inspection check-list (Report format)
All equipment shall be KNPC safety certified and in good working condition. All involved personnel shuld have received the required safety induction and othe appropriate training.