Method Statement: (The following will be done as per Consultants approved Document) a.) The Existing Potable water network valve chamber VB-DW-40-13 shall be inspected & new potable water supply line shall be provided without disturbing the existing system to install the water supply pipes for the above scope of work. b.) Water supply pipes shall be installed from the existing valve chamber VBDW-40-13 to water meter chamber for new training facility. IRRIGATION WATER SUPPLY TIE-IN POINT WORKS Method Statement: (The following will be done as per Consultants approved Document) a.) The Existing irrigation water network valve chamber (Dwg no: 08-CC-2150068) shall be inspected & new irrigation water supply line shall be provided without disturbing the existing system to install the water supply pipes for the above scope of work. b.) Water supply pipes shall be installed from the existing valve chamber as shown on Dwg No: 08-CC-215-0068 to the new irrigation water meter chamber for new training facility.
SEWERAGE NETWORK TIE-IN POINT WORKS Method Statement: (The following will be done as per Consultants approved Document) c.) The Existing sewerage network manhole MH-70-NY-28 shall be inspected & new sewerage line shall be provided without disturbing the existing system to install the uPVC drainage pipes for the above scope of work. d.) uPVC drainage pipes shall be installed from the existing manhole MH-70 NY-28 to the new manhole MH-200-NY-11 for new training facility.