ASIAN AUTOMOTIVE AUTOMOTIVE STEELS
12.08.10 Customer request Development
CONTRACT REVIEW
Marketing Development
Customer RFQ product documents delivery requirements (customer statement) Customer Credit Check
Credit Critera failed
Marketing Credit / Audit Report
Project risk assessment
Vendor information
RFQ vendor
SGM / GM authorization
outsource
Vendor RFQ
Vendor feedback No go
Request Customer Specific Requiremen
Preliminary RFQ analysis
Quotation reject, Counter proposal Development Manufacturing Purchasing Engineering
CSR
Statement of Deliverables (internal RFQ form) Preliminary process flow APQP checklist Draft APQP organization chart
Vendor preliminary proposals
Technical feasibility
Reject
APQP team counter proposal
Accept: Team Feasibility Commitment m/c cycle time Costing assumption
Preliminary planning
Development
Project Development Costing Manufacturing costing Preliminary project schedule Project FS
Accounts
FS documents
Document compilation Quotation analysis, Proposal Quotation letter
Marketing Change request
Management support
Marketing
GM, SGM Endorsement
Inform customer
Close project order
MD/COO approval
Change request Marketing
Signed quotation Project Authorization RFQ rejection memo
Document submission
Marketing
Customer quotation forms, packaging Delivery/Acceptance Delivery/Acceptance document Project close
No reject letter from customer
Customer accept?
Record in quotation file
LOI / LOA
Quotation file
Product Design & Development
File: Procedure APQP.vsd
Page 1
Marketing
Prepared: AG
ASIAN AUTOMOTIVE AUTOMOTIVE STEELS
12.08.10
CONTRACT AMMENDMENT & VA/VE
Engineering change proposal Customer ECN/ change product documents delivery requirements Technical concept study Technical feasibility evidence Preliminary Go/No Go
Counter Proposal
GM endorsement, customer endorsement Commercial Feasibility Feasibility not OK Team feasibility commitment not OK
Commercial feasibility study Commercial Feasibility study OK Team Feasibility commitment OK Start decision proceed
outsource
Not feasible
RFQ approved vendor Vendor RFQ Vendor feedback Vendor proposals
Preliminary Preliminary planning
Preliminary process analysis Project Development Costing Manufacturing costing Preliminary project schedule Project feasibility study
Change request
Document compilation
Analysis documents documents
Preliminary Preliminary quotation
Quotation Letter
Counter proposal
Change request
GM endorsement
Counter propose
Forward to MD MD/SGM endorsement
Counter proposal
Signed quotation Project Authorization Trasmit to customer
Confirmation of receipt Customer accept? LOI / LOA/ PPA ammendment product development File: Procedure APQP.vsd
Page 2
Prepared: AG
ASIAN AUTOMOTIVE AUTOMOTIVE STEELS
12.08.10
PRODUCT DESIGN & VALIDATION LOI / Customer authorization
Yes, resourcing / localization
Design document avail?
No, new design product validation req
Sample available?
no
Customer liaison
Correspondents, Correspondents, minutes Customer product specs, stds avail?
Customer needs analysis
yes No / incomplete
Customer requirements Reverse engineering Yes; drawing, spec, testing std
revise
Quality Requirement analysis
Product specification proposal
Bill of materials incoming material requrement process requirements Specification list
Product design / verification manual calculations FEA output product design drawing proto pfmea, control plan
testing list approval Customer-approved PIS, testing list
Prototype part, interfaces purchase / mfg
Product validation Test planning/design
Testing documentation requirement
Test eqpt, method requirement
Test document preparation
Testing arrangement equipment prep
product std
Sample purchase documents
Product analysis QFD / DFMEA
QFD, DFMEA form
(Specifications not compatible, emerging Requirements) Product Change Request
sample parts Fitting, performance analysis
Fitting trial checksheet Testing checksheets
Status reports inspection checksheet template
Prototype testing, analysis
Sample testing results
Spec review / DQCM
PRODUCT SPECIFICATIONS Product drawing (comp & assy) Testing specification, Part Inspection Standard Packaging specification Product document release
File: Procedure APQP.vsd
Page 3
Prepared: AG
ASIAN AUTOMOTIVE AUTOMOTIVE STEELS
12.08.10
PRODUCT DOCUMENT RELEASE Product specification specification product document draft / update/ correction draft drawing
document log update
update drawing log change request
customer EC approval req?
yes
EC Request no
(customer preliminary document review) approve for final submission
final document preparation
final document
document check check - approve approve
signed document
document submission
proof of delivery
contract ammendment req?
customer endorsement
yes
customer-approved customer-approved document
Document Control
Contract Ammendment no
Process development planning
File: Procedure APQP.vsd
Page 4
Prepared: AG
ASIAN AUTOMOTIVE AUTOMOTIVE STEELS
12.08.10
PROCESS DEVELOPMENT PLANNING LOI / LOA + Product Specifications Specifications Process requirement analysis Process flow diagram PFMEA Special Process characteristics characteristics
Sourcing plan
Production Process, inspection planning Production Control Plan Pre-launch Control Plan Factory layout, manpower plan Material, component sourcing
Engineering Development Analysis
DevelopmentInspection / test eqpt spec MSA plan
Development process flow Process validation plan Prelaunch control plan Equipment Specifications Specifications Development project planning
Testing inst development/acq analysis
Test eqpt requirement / devp plan
Production m/c requistion /eng development plan Development Project schedule, resource requirement, cost estimate
Final proposal preparation / revision Change request
Project Proposal Management review
change request
Authorization to proceed Confirmed project plan
Transmit final proposal to customer management approved proposal Customer review
Process Development & Validation
File: Procedure APQP.vsd
Page 5
Prepared: AG
ASIAN AUTOMOTIVE AUTOMOTIVE STEELS
12.08.10
PROCESS DEVELOPMENT & VALIDATION Authorization to proceed
PROCESS VA VALIDATION
ENGINEERING DE DEVELOPMENT
Inst purchase/ devp / mod / training
Eqpt purchase/devp/ mod
Vendor selection
A9 checking aids aids inspection jig
Purchasing records
Vendor LOI
checksheet confirmation
Equipment testing / checksheets
product characteristic ng
test equipment fail
VENDOR DEVELOPMENT
mc ng Agreement not possible
Equip testing checksheet
Part inspection standard devp Vendor drawing Draft PIS
Eqpt testing
Approved checksheets checksheets
arbitration
Equip / test reports
Hard tooling Product samples
Change terms Vendor Devp failed
Vendor inspection agreement development contract / LOA approved quality checksheets
Line trials
line operation status OK improvement areas
Vendor development
line improvement
Vendor progress reports
Product testing
Dimensional inspection report, AAR, testing report
Product evaluation
improvement needed
Vendor monitoring
Line trials
Child part ng
sample submission
Sample approval
Vendor evaluation sample
Child part testing preliminary PFMEA update
Module testing results Child part evaluation Child part approval pp appointment
satisfactory RPN
Vendor PP
Vendor pp summary Approval Record Record master parts
MASS PRODUCTION PREPARATION
Subsupplier PQCM sign-off
Vendor PQCM
signed vendor PSW minutes PQCM Vendor LOA, draft PPA draft LOA, PPA
contract nego
term agreement
Vendor PPA File: Procedure APQP.vsd
Page 6
Prepared: AG
ASIAN AUTOMOTIVE AUTOMOTIVE STEELS
12.08.10
MASS PRODUCTION PREPARATION process development review prelaunch control plan updated prelaunch, production control plan list equipment, instrument, work instruction, QC checksheets, manpower list material & child part ordering prelaunch preparation meeting prelaunch checksheet updata
QC checksheet preparation
prelaunch, production work instruction preparation
equipment servicing, instrument MSA
prelaunch production planning
prelaunch material order
preparation monitoring
not ready
prelaunch checksheet complete
prelaunch briefing small batch trial production product, process data minor issues
product audit process ok line production confirmation trial product, process data product audit
major issues
process ok Process Development
line run at rate
Quality Council Enquiry
Customer PQCM/PCPN Sign-off PQP Summary & Sign-off Production part documentation compilation correction request
File: Procedure APQP.vsd
APQP records records
Project Exit Review
PPAP, Pqcm report
minutes
PQCM
Quality document update
PSW Sign off
project file document update product quality standard update
Early production containment
Project APQP doc QMS update
Page 7
Prepared: AG
ASIAN AUTOMOTIVE AUTOMOTIVE STEELS
12.08.10
KAIZEN / PROCESS IMPROVEMENT
SCHEDULED PRODUCTION
Improvement needed?
Operational problem Production QC report
no Quality problems?
Quality problem
Improvement possible Problem analysis
Kaizen request for proposals
Improvement ideas Kaizen submission
Additional Testing Testing / data gathering
Kaizen Evaluation Proposal accepted
Test reports, data analysis Project planning
Kaizen proposal
Minutes project schedule
Modification
Tooling / mc redesign, fabrication
Problem description
Temp rigging, work inst
Temporary production rigging, work inst
Process ref update m/c maintenance log update Off-line testing
m/c maintenance log update Problem resolved? Target achieved Supervised production
Statistical data PFMEA updates process improvement activities update SPC data update
Acceptable?
improvement project close
File: Procedure APQP.vsd
Kaizen award presentation
Page 8
Prepared: AG
ASIAN AUTOMOTIVE AUTOMOTIVE STEELS
12.08.10
PROJECT GO/NO-GO DECISION
Volume commitment Material cost quotation
Dev cost estimate
Compute costs / pc, capital investment
Process cost estimate
Standard costing sheets
Marginal cost meet customer price?
No Yes
Management prerogative
No
Full costing meet customer price?
Yes Project Authorization Memo
TH
4 down & 20 GO FOR IT!
Quotation issue
Inform customer NG
File: Procedure APQP.vsd
Page 9
Prepared: AG