PEKERJAAN PAGAR + TURAP PANCORAN MAS
1 1 M3 M3 Gali Galian an Tana Tanah h Bia Biasa sa Seda Sedala lam m 1M 0.4000
o rg
P e k e r ja
0.0400
o rg
Mandor
1.1000
m3
Batu Belah Pondasi
163.0000
Kg
Semen PC.
0.5200
m3
Pasir Pasang
1.5000
org
Pekerja
0.6000
org
Tukang Batu
0.0600
org
Kep.tukang ba batu
0.0750
org
Mandor
0.2800
m3
Kayu Te Terentang
4.0000
kg
Paku Biasa 2'' - 5"
50.0000
kg
Besi Beton polos
4.5000
kg
Kawat Beton
300.0000
kg
Semen PC
0.5200
m3
Pasir
0.7800
m3
Koral Beton/Split
2.5000
lbr
Plywood 9 mm
7.3000
o rg
P e k e r ja
0.3500
o rg
Tukang Kayu
3.3000
o rg
Tukang Besi
2.1000
o rg
Tukang Batu
0.5700
o rg
Kepala Tu Tukang
0.2500
o rg
Mandor
13.0000
bh
Batako
14.3700
kg
Semen PC
0.0400
m3
Pasir Pasang
0.2800
o rg
P e k e r ja
0.1000
o rg
Tukang Batu
0.0100
o rg
Kepala Tu Tukang
0.0100
o rg
Mandor
Tanaga :
2 1 M3 M3 Pasa Pasang ngan an Pond Pondas asii Bat Batu u 1 Pc : 4 Ps Bahan :
Tanaga :
M3 Membuat Membuat Sloof / Kolom Praktis Praktis (besi + bekistin bekisting) g) 3 1 M3 Bahan :
Tanaga :
4 1 M2 M2 Pasan Pasanga gan n Bata Batako ko 1/2 1/2 Bat Bata a 1 Pc Pc : 4 Ps Bahan :
Tenaga :
No.
URAIAN PEKERJAAN
VOLUME
SAT
HARGA SATUAN BAHAN
( Rp.) 1
2
3
4
5 -
I. PEKERJAAN
1 Pekerjaan Galian Tanah
31.40
m3
2 Pekerjaan Pondasi Batu 1:4
26.88 0.62
m3
9,741,312.00
m3
873,921.00
0.50
m3
704,775.00
73.80
m2
3,065,947.20
TOTAL
14,385,955.20
3 Pekerjaan Sloof 15/15 4 Pekerjaan Kolom Praktis 15/15 (13 titik) 5 Pekerjaan Pagar Dinding Batako 1:4
50,000.00
20,000.00
75,000.00
3,000.00
Jumlah
23,000.00
102,000.00
112,200.00
1,200.00
195,600.00
105,000.00
54,600.00
Jumlah I
362,400.00 50,000.00
75,000.00
55,000.00
33,000.00
60,000.00
3,600.00
75,000.00
5,625.00
Jumlah II
117,225.00
Jumlah I + II
479,625.00
1,350,500.00
378,140.00
6,500.00
26,000.00
5,600.00
280,000.00
6,000.00
27,000.00
1,200.00
360,000.00
108,000.00
56,160.00
100,000.00
78,000.00
81,700.00
204,250.00
Jumlah I
1,409,550.00 50,000.00
365,000.00
55,000.00
19,250.00
55,000.00
181,500.00
55,000.00
115,500.00
60,000.00
34,200.00
75,000.00
18,750.00
Jumlah II
734,200.00
Jumlah I + II
2,143,750.00
1,500.00
19,500.00
1,200.00
17,244.00
120,000.00
4,800.00
Jumlah I
41,544.00 50,000.00
14,000.00
55,000.00
5,500.00
60,000.00
600.00
75,000.00
750.00
Jumlah II Jumlah I + II
HARGA SATUAN UPAH
20,850.00 62,394.00
JUMLAH HARGA
( Rp.)
( Rp.)
5
6 722,200.00
722,200.00
3,151,008.00
12,892,320.00
455,204.00
1,329,125.00
367,100.00
1,071,875.00
1,538,730.00
4,604,677.20
6,234,242.00
20,620,197.20