No
Item Work
U n it
I SITAC
1 Site Hunting & Appraisal 2 Sosialisasi Ijin Warga Compensation to community Bantuan Fasilitas Umum (FASUM) Bantuan Fasilitas Sosial (FASOS) Lain-lain Lain-lain Lain-lain Lain-lain 3 IMB (RKT, HO, SITU, IP, AMDAL) Rekomendasi Ketinggian Tower (KKOP & DINAS Perhubungan) Rekomendasi Kecamatan HO (Ijin Gangguan) Surat Ijin Tempat Usaha (SITU) Analisis Dampak Lingkungan (AMDAL) Ijin Prinsip (IP) 4 Mobilization & Coordination 5 Documentation (3 hard copy + 1 soft copy on CD) 6 Soil oil Te Test (2 poin pointt pe penetr netrat atio ionn tes testt & 1 poi point nt hand hand bori boring ng)) & Rep Report ort 2 point Dutch cone penetration Test (300 kg/cm2) 1 point hand boring (min 6 m) for Laboratory test : - Consolidation - Triaxial test UU CU - Water Content - Particle size distribution or sieve - Direct Shear - Density of Soil - Water Content - Hydrometer analysis - Specific gravity - Atterberg limits Sub Total Land leas/buy (include Notaris + BPN) Sub Total Total Sitac
Ls Ls
Ls
Ls Ls Ls
Vol Est.
Tower 52 m Unit Price (IDR) Total (IDR)
1 1
6,900,000.00 24,725,000.00
6,900,000.00 24,725,000.00
1
34,500,000.00
34,500,000.00
1 1 1
11,500,000.00 2,875,000.00 5,750,000.00
11,500,000.00 2,875,000.00 5,750,000.00
86,250,000.00 1
71,250,000.00
71,250,000.00 71,250,000.00 157,500,000.00
Vol Est.
Tower 72 m Unit Price (IDR) Total (IDR) 6,900,000.00 24,725,000.00
6,900,000.00 24,725,000.00
34,500,000.00
34,500,000.00
11,500,000.00 2,875,000.00 5,750,000.00
11,500,000.00 2,875,000.00 5,750,000.00
86,250,000.00 71,250,000.00
71,250,000.00 71,250,000.00 157,500,000.00