Rate Analysis for centering & shuttering
Sl. No.
1
A
B
Rate Amount (in Rs.) (in Rs.) Centering & shuttering with plywood or steel sheets including strutting, propping, bracing bothways with wooden members and removal of formwork upto 4.50 mtr. Height above ground level, for suspended floors, roofs, landings, staircase, balconies, girders, cantilevers, bands, copings, bed plates, anchor blocks, sills chajjas, etc. Description
Unit
Unit = Sq.m. Taking output = 1 Sq.m Material Steel Plate 3.15 mm thick @ 2 4.73 kg/m2 (2.88x24.73) = 71.22 kg Supporting Angle (35x35x5) @ 2.6 kg/m kg (16.4x2.6) = 42.64 kg Total Weight = 113.86 kg (including welding, nuts & bolts ect.) Add for maintenance @ 10 % Cost of Supporting Material No Ballies 100 mm,75mm 3m long Total Less salvage value after full use of material @ 20 % on A Total - Part A Assuming shuttering of material will become unservicable after use of 40 times Once Cost for using once LS Carriage Labour Fitter Beldar Shuttering oil
Nos Nos LS
Qty.
113.86
60.00
6831.60
683.16 5
60.00
300.00 7814.76 -1562.95 6251.81
1/40
0.75 1.5
156.30 15.00
150.00 80.00
112.50 120.00 5.00 408.80 40.88 449.67 104.21
Say
104.00
Add Overhead & Contractor's Profit 10 % Total Cost per Sqm