Tabulated method of finding rates for itemsFull description
Rate Analysis for Hume Pipes
I have worked for Painting Rate analysis need few inputs & valuable suggestion for improving the same. The suggestion can be forwarded on email id [email protected] description
pppFull description
explanatory for working out rate analysis for various civil work quantities.
Full description
rateFull description
Full description
Rate+Analysis+Format
Civil WorkFull description
Full description
Pile Foundation Rate AnalysisFull description
Civil Work Rate AnalysisFull description
Full description
Standard Data Book - Road Rate AnalysisFull description
Full description
SUMMARY Sr.No. A
B
Description RCC. WORK 1 R.C.C for M-30 as per Mix Design 2 R. R.C.C for M-25 3 Providing,fabricating and fixing FE415 steel.for 1MT 4 Ra Rate Anly.for Supply ,fixing ,Removing Shuttering & Stagging 150 sqm BRICKWORK 1 9'' Brick work With Silpoz (1 :6) 2 8" thk. Siporex Blocks (1:4) with Sand 3 9" Thk.Brick Work 1:4 with Sand 4 230 mm Brick Work C:M 1:5 for 10 cum
PAINTS 2 3 Coat Ext. Paint with Asian Weather Shield for 100 Sqm 3 3 Coat Snowcem Cement Ext. Paint for 100 Sqm D PLASTER 1 12mm thk Internal Plaster with 5 mm thk Birla Putty CM 1:4 per 100 Sqm Material Only 2 12mm thk Internal Plaster with 8 mm thk thk (1st POP) CM 1:4 per 100 Sqm material only 3 12 12 mm thk Internal Plaster with Birla Putty CM 1:4 per 100 m2 4 12 12 mm thk Internal Plaster with POP (1st) CM 1:4 per 100 m2 5 Plaster (1:8) with Silpoz 15mm thk. Ex.Scaffolding 6 Plaster (1:4) with Sand 15mm thk.Ex.Scaffolding 7 12 mm thk Plaster C:M (1:3) for 100 Sqm 8 20 20 mm thk Ext.Plaster C:M (1:3) for 100 Sqm up to 3.00 m ht. E TILING 1 Marble Mosaic 2 Kota stone flooring 3 Glaze Ceramic 4Supp 4Supplly & Fixi Fixing ng PVC PVC Door wit with Baro aroda Gree Green n Marb arble fram frame e (2.1x 2.1x 0.75 0.75)) wi 5 Baroda Green Marble 6 Su Supply & Fixing PVC Door with Nazarana Marble frame (2.1x 0.75) 7 Tremix Paving of 150mm thk per m2(1:1:2) Tremix Paving of 75 mm thk per m2 using M25 grade concrete 8 Con. Block Paving of 140mm thk per m2 9 Vitrified Tiles 10 Wooden Tile Flooring 11 20mm thk Granite cutting & fixing with sand sand for 5 Sqm C:M 1:6 Curved S 1220m 220mm thk Granite cutting & fixing with sand for 5 Sqm CM 1:6 Flat Surfa 13 20mm thk Pebble fi fixing with sand for 100 Sqm Lab.only 14 Gr Granite Skirting cutting & fixing with sand of 4" for 50 Rmt CM 1:6 lab. o 15 IPS Flr. 30mm thk.for 100Sqm F DOOR & WINDOW 1 Supp Supply ly & Fixi Fixing ng Wood Wooden en Door Door with with Wood Wooden en fram frame e (2.1 (2.1x x 0.75 0.75)) with with fixi fixing ng 2 Su Supply & Fixing Wooden Door with Wooden frame (2.1x 0.75) 3 Jindal Windows Sections 3 track(1.83x1.2)
Date-070209 Unit Rate
Cum
4087.19
Cum
4261.95
M.T.
39,253.50
Sqm
279.03
Sqm
791.88
Sqm
896.53
Sqm
568.13
Cum
3938.00
Sqm
133.5
Sqm
89.94
Sqm
104.94
Sqm
57.15
C
Sqm
330.57
Sqm
161.37
Sqm
302.64
Sqm
170.85
Sqm
195.02
Sqm
218.51
Sqm
809.31
Sqm
1190.45
Sqm
913.15
Sqm Sqm
2979 2979..84
Sqm
1252.99
Sqm
3627.04
Sqm
522.36
Sqm
798.19
Sqm
754.52
Sqm
653.13
Sqm
5057.29
Sqm
826.23
Sqm
747.60
Sqm
140.75
Rmt
82.62
Sqm
217.99
Sqm Sqm
5635 5635.4 .46 6
Sqm
3648.12
Sqm
4226.27
G
H
I J
K
L
4 Wooden Door (0.75X2.1)
Sqm
3392.04
5 FRP with Marble Frame Door (0.75X2.1)
Sqm
8647.42
6 MS DOOR (1.2X2.1) Fabricated
Sqm
2093.46
7 MS DOOR (1.2X2.1) Factory Made
Sqm
2432.66
8 Jindal Windows Sections 4 track(3.65x1.75)
Sqm
2912.16
9 Euro Windows Sections 4 track(3.65x1.75)
Sqm
2912.16
10 Windows Sections 4 track (3.65x1.75)
Sqm
2912.16
11 Windows Sections (3.65x1.75) with Insect Net
Sqm
2811.49
12 7' Wooden Door (1.2X2.1)
Sqm
5157.85
13 Wooden Door (1.2X2.4)
Sqm
5726.83
14 Aluminum Louvers (0.97x2.8)
Sqm
3793.36
15 Windows Sections 4 track (3.65x1.75)
Sqm
2912.16
16 Windows RCC Louvers (0.6 x 0.75)
Sqm
2500.14
Sqm
1,712.49
Sqm
909.57
Sqm
948.06
Rmt
76.78
Rmt
373.30
Rmt
170.26
Rmt
564.31
FALSE CEILING 1 Rate Anly for Acrylic False Ceiling 3.55sqmt. 2 Rate Anly for POP False Ceiling 3.55 sqmt. 3 Rate Anly for Gypsum False Ceiling 3.55 sqmt. PIPES & FITTING 1 UPVC Pipe for 100 Rmt. 2 G.I.Pipe for 100 Rmt. 3 HDPE Pipe for 100 Rmt. 4 PVC 110mm dia.of 6kgf/cm2 for 6 Rmt with Pocket in wall & Grouting 5 160 mm dia Supreme UPVC (6 kg pressure) Pipe line (6 Mtr Long) 6 160 mm dia Supreme Eco-Drain Pipe line (6 Mtr Long) SANITARY WARE 1 Wall Mounted W.C with 6.5 litres P.V.C Flush Tank FABRICATION 1 Fabricated M.S. Man- hole Cover 2 Ductile Iron Man-hole Cover VIDEO DOOR PHONE 1 B/W Video Door Phone 2 Color Video Door Phone WATERPROOFING 1 Inclined Surface Gradient Available 2 Flat Surface Gradiant Not Available 3 Inclined Surface Gradient Available (40mm thk.Screed plaster)
Note- for Detail's refer rate anly.
Rmt
1015.44
Rmt
749.21
Nos
7428.47
Sqm
8350.29
Sqm
22752.80
Nos
7000.00
Nos
13000.00
Sqm
398.28
Sqm
806.25
Sqm
605.95
05/17/2011
Filling of Siprox Block with 400 thk C:M 1:4 with top slurry of 12 Sr no A)
Item
Unit
Quantity
Rate (Rs.)
Materials: Siprox Block
Cum
4.32
3780.00
Sand
Cum
0.60
1590.00
Sub-Total of Material (M) B)
Labour: Mason Helper
Each
2.40
300.00
Each
15.00
200.00
Supervisor /Head Mason
Each
0.25
350.00
Sub-Total of Labour (L) Total (M+L) C)
Add for OH & C.P
15.00%
Total Amt. Cost Per 4.8 Cum ` Cost Per 1 Cum ` Cost per 1 Cft `
Est.Dept
05/17/2011
mm thk C:M 1:4 Amount. (Rs.) 16329.60 954.00
17283.60
720.00 3000.00 87.50
3807.50 21091.10 3163.67
24254.77 24254.77 5053.08 143.23
Est.Dept
230 mm Brick Work C:M 1:5 for 10 Sr. no A)
Item
Unit
Materials: Cement Sand
Cum
Brick
Nos
bag
Quantity 25.00 4.38 5000.00
Sub-Total of Material (M) B)
Labour: Mason
Each
8.50
Helper
Each
16.00
Sub-Total of Labour (L) C)
Total (M+L) Add for Sundries & Contingencies Add W.C & Electricity Add for OH & C.P & Taxs
Total Amt. Cost for 10 Cum (Rs.) Cost Per 1 Cum (Rs.) Cost per 1 Cft (Rs.)