MUNICIPAL CORPORATION OF GREATER MUMBAI
Hydraulic Engineer’s Department Rate Analysis Format
Important Points
1) The intending tenderer shall consider the various tender conditions
included in the tender regarding the site difficulties while calculating their rates. 2)
The intending tenderer should note that the rate analysis given herewith is for typical size of valves, water mains, cross connections etc. The contractor shall carry out the rate analysis in the given format separately for each size of valves, pipes, cross connections etc. taking into account tender Bill of Quantities.
MUNICIPAL CORPORATION OF GREATER MUMBAI
Hydraulic Engineer’s Department Rate Analysis Format
Code
RW 2.08
Descrip Descrip tion
Unit
Quantity
Rate Rate Rs
Providing & laying laying sub base 20 cm compacted(K.T.R.)thick made of metal obtained from rock having AIV of not more than 40% (metal varying in size from 90 mm to 45mm) and compacting the same to the satisfaction of the Engineer laid complete in to two layers the required level and camber, rolling with 10/12 tonnes roller interstices being filled with stone dust, watering, rolling and making each layer waterbound. As per new Road Specifications Clause no.220. Unit = sqm
Cost fo r 1 Sq. M. Consolid ated thickness = 10 cm. a)
b)
Labour Labour for spreding Metal
day
Forman
day
Material Aggregate 1 0Sq. M. = 0.14 Cu.M. Cu.M.
cum
stone chips/ screening material to fill Vioids Binding material stone grit
cum
c) Rolling Charges for 1 Layers 1.00 1.00 Sq. M. One layer=
sqm
cum
Two layer= Profit & overhead charges Rate per sqm =
say
Cost Rs
RW 2.13
Supplying & spreading 60mm metal compacting the same to 10cm. To the satisfaction of the Engineer by a roller weighing not less than 10 tonnes to the required grade,level & camber including binding with grit,sand stone du st, watering rolling etc. complete & making the layer waterbound.As per new Road Specifications Clause no.220. Unit = sqm
Cost fo r 1 Sq. M. Compacted thic kness = 10 cm. a)
b)
Labour Labour for spreding Metal
day
Forman
day
Material Material = 60 mm. Aggregate
cum
stone chips/ screening material to fill Vioids Binding material stone grit
cum
c) Rolling Charges for 1 Layers 1.00 1.00 Sq. M. Profit & overhead charges
sqm
cum
Rate per sqm =
say
RW 2.20
Providing & laying, spreading & compacting graded crushed stone stone agreegate to to wet mix macadam satisfaction including premixing the material with water to OMC in mechanical mix (pug mill) carriage of mix material by tipper to site laying in uniform layer of 75mm to100mm(compacted thickness each)with sensor paver finisher on prepared subbase & compacting with vibratory roller (10 tonne) to achieve desired density including lighing, guarding barricating & maintenance of diversion etc. as directed by the Engineer, ( Rebate for not using sensor paver should be taken,(metal gradation from 53mm to 75mm micron as per MCGM MCGM Road Road Specifications clause no.240). Unit = Cu.M
Rate analysis for wet mix macadam for Qty. 1 M3 Loose Volume = 1 M3 x 1.40 = 1.40 M3 i.e 1.40 x 0.71 = 1.00 M3
Ar ea = 1 / 0.75 mm . Thick) a) Labour
= 13.33 M2
( f or 75
Male Mazdoor b)
day
Material Metal No. I+II+III
cum
Stone grit
cum
Water (10% by weight including losses) c)
Lit
Machinery Plant charges ( In plant )
MT
Spreading Sensor Paver
sqm
Rolling by vibratory roller
sqm
Transportation to site or mixed o n site any where in MCGM limits Profit & overhead charges
MT
Rate per Cu.M =
say
RW 2.21
Providing & laying, spreading & compacting specified crushed stone in granular subbase course including premixing the material in mechanical mixer (pug mill or approved type), spreading of mixed material in uniform layer of 100mm to 75mm (compacted thickness each) with motor grader or paver on prepared murum surface & compacting with 10 tonne vibratory roller to achieve desired density including all material, labour, machinery, lighing barricating to all lifts & lead maintenance of diversion etc. complete (metal gradation from 75mm to 75mm micron as per MCGM Road Specifications clause no.210). Unit = Cu.M
Rate Analysi s for granul ar subbase for Qty. 1 M3 Loose Volume = 1 M3 x 1.40 = 1.40 M3 i.e 1.40 x 0.71 = 1.00 M3 Ar ea = 1 / 0.100 mm . Thick) a) Labour
= 10 M2
( f or 100
Male Mazdoor b)
day
Material Metal No. I+II+III
cum
Stone grit
cum
Water (10% by weight including losses)
Lit
c)
Machinery: For mixing 1 m3
MECHANICAL MIXER/ PUG MILL ( In plant ) Spreading Motor grader/ ordinary Paver Rolling by vibratory roller Transportation to site or mixed o n site any where in MCGM limits Profit & overhead charges
MT sqm sqm MT
Rate per Cu.M =
say
Code
RW 3.11
Description
Unit
Quantity
Rate Rs
Providing & fixing 80 mm thick interlocking unishape concrete pavers ( monolithicsingle layer precast concrete blocks) of gray cement coloured in the carriageway having average crushing strength 50N/sq.m.m. as per technical specification, placed on average compacted thickness of 25 mm, uniformly graded river sand cushioning with proper compacting with mechanical compactor with the proper level, grade and camber etc. complete as specified and as directed by the Engineer. Unit = sqm
Cost for 1 sq mtr a)
b)
Labour Pavior / Tiler
day
Labour
day
Material
80 mm thick interlocking unishape concrete pavers Bedding Sand (screened -for 25 mm thk & jointing) c) Machinery Vibrator
sqm cum
day
Profit & overhead charges Rate per sqm =
say
Cost Rs
RW 3.17
Providing & fixing in the footpath, 60 mm thick Lacquer coated (Reflective) interlocking gray cement concrete pavers in red (Terra Cotta) Black, Brown, Lemon Yellow or any colour with vermeticular or any antiskid texture on top surface of approved pattern/ shape and colour having average crusting strength 40 N/mm² manufactured in double layer precast concrete blocks. The top layer of paver block should be 12 to 15 mm thick and consist cubical shape stone aggregate 8 mm size sieve 100% passing and retain on 4.75 mm size sieve , silica sand and with pure iron oxide ultra voilete stabilized pigment @ 5% by weight of cement and should be coated with lacquer having hard, high abrasive resistance and water repellent. The bottom layer should be 45 to 48 mm thick having 12 mm size sieve 100% passing aggregate as per technical specification placed on uniformly graded river sand cushioning of average compacted thickness 25 mm properly compacted with mechanical compactor with required level, grade and camber etc. complete as specified and as directed by the Engineer. Unit = sqm
Cost for 1 sq mtr a)
b)
Labour Pavior / Tiler
day
Labour
day
Material
60 mm thick Lacquer coated ( Reflective) interlocking gray cement concrete pavers Bedding Sand (screened -for 25 mm thk & jointing) c) Machinery Vibrator
sqm
cum
day
Profit & overhead charges Rate per sqm =
say
RW 3.20
Providing & Fixing in the carriageway interlocking 100 mm thick gray cement concrete unishape pavers in Red ( Terra Cotta), Black, Brown or any colour unishape (monolithic-single layer precast concrete blocks) with pigment @ 3% by weight of cement having average crushing strength of 50N/sq.m.m., placed on uniformly graded river sand cushioning of average compacted thickness 25 mm with proper compacting with mechanical compactor with the proper level, grade and camber etc. complete as specified and as directed by the Engineer. Unit = sqm
Cost for 1 sq mtr a)
b)
Labour Pavior / Tiler
day
Labour
day
Material
100 mm thick gray cement concrete unishape pavers (Terra Cotta) Bedding Sand (screened -for 25 mm thk & jointing) c) Machinery Vibrator
sqm cum
day
Profit & overhead charges Rate per sqm =
say
Code
RW 4-01
Descrip tion
Unit
Providing & Fixing kerb stones 30 cm.to 40 cm. long., 15 cm. wide, 38 cm. deep medium dressed in all exposed surfaces, set in cement mortar 1:2 on a 15 cm. thick and 25 cm. wide RMC M-10 C.C. bed including filling the joints with 1:2 C.M. pointing, curing etc. complete. Unit = Rmt
Cost for 1 RM b)
Material kerb stone M-10
No. cum
Quantity
Rate Rs
Cost Rs
Excavation and removal of material
cum
For fixing 50m a)
Labour Mason
day
Male Labour
day
C.M. 1:2
cum for 1m
Profit & overhead charges Rate per Rm=
Code
RW 7-45
Description
Unit
Providing and fiixing the barigating in double row with G.I. Sheets of 22 guage manufactured by TATA Co. and JINDAL Co. fixed on 3 inch dia. (75mm.) woden bullies which will be buried in existing road sufficeintly. Embossing of TATA/JINDAL TATA/JINDAL Brand on G.I. Sheet shall be ensured before painting with yellow and black bands of Synthetic enamel paint as per the traffic norms and as directed by the Engineer. Unit = RM
Basic rates Ballis 3" Ø G.I.. cor ru gated s heet of 2.4 G.I 2.44*0 4*0.75 .75 m.
sheet
Synth. Enamel paint
sqm
An alys al ys is fo r 500m 500 m leng le ng th No. of Bal lis =500 =500 m. /2.00m. /2.00m.
500 Nos. =
No.of G.I. (500/2.440)*2
corrugated
sheets
=
Nos. = a)
i.e. 500 i.e.
Cost of angle post per runn ing m. Cost of ballis
b) Cost of G.I. G.I. corr ugated sheet running m. 2.44*0.75 m. sheet
mt. per
Considering min. 4 times use of material reduced cost per m.=
mt.
Quantity
Rate Rs
Cost Rs
Total (a+b) = Synth. Enamel paint
mt.
Considering min. 2 times use of material reduced cost per m.= c) Labour (fixing (fixing & removing the barricating) 3 nos.carpenter for erect &dismental 50 m length 6 nos. of laboures, for erect & dismental 50 m. Toatal =
mt.
day day
Profit & overhead charges Rate per mt. =
Code
RW 1006
Description Providing & laying R.C.C. running beam in M-40 cement concrete including required formwork mixing, compacting & curing, etc. complete reinforced with 12mm dia.(Minimum 4 Nos.)M.S. main bars & 6mm Dia M.S. rings at 15cm/c/c 15 cm/c/c to be anchored in slipper slab properly with M.S. reinforcement as per drawing etc. complete as specified(Steel will not be paid separately).Contractor has to make his own arrangement for portable waterfor construction/curing with hessian cloth, etc. & will not be paid separately. Beam Size: b) 23cm. x 30cm. 30cm. Unit = RM
Unit
Cost for 1 RM Size of beam 23 cm x 30 cm. Cost of providing & laying M - 350 C.C Vol. of runner b eam / R.M. = 0.23 x 0.30 Cu.M. / Mt. = Rate for M:40 C.C. per Cu. M. a)
cum/mt Rs
Rebate Rebate for not using screed vibrators
day
Rebate for not using plate vibrators
day
Total Sundries 5 % Total Cost of owing machinary = (Say. Rs. ) = after 5 years @ 25 % salvage value
Quantity
Rate Rate Rs
Cost Rs
Minus the scrap / resale value Depriciated & Maintanance @ 25 % per annum Total 25 % per annum = Rebate for not using screed vibrators & plate vibrator Rebate /50bays*45*3*0.30
cum
After Deduction from rate of Item RW 10.01 Cost for beam of Size 23 cm x 30 cm = b)
Material Cost of reinforcement steel Wt. of reinforcement 4 Nos. 12mm dia. M. S. = 4 x 0.89 = 6/ M.S. Rings @ 15 cm. C/C Length of each ring = 2 x 19 + 2 x 26
kg
cm
+ 12 Wt./ ring = 1.02 x 0.22 = Wt. of reinforcement / mt. = 3.56 +1.57 = wastage 5 % 0.25 0.25 kg = 5.28 kg. say 5.3 kg. Say Cost of reinforcement c) Labour Labour for tieing & fixing labour for bending Profit & overhead charges
kg
kg MT MT day day
Rate per RM =
say
RW 10.17
Providing & fixing in position M.S. dowel bars of 32mm dia 55cm long & 30cm C/C whenever directed including handling, fixing, etc. complete(no extra payment will be made for applying bitumen & grease to dowel bars) Unit = sqm a)
b)
Labour Fitter
day
Labour
day
Labour for Cutting by machine
day
Material 32mm. Steel , including wastage
Nos.
Profit & overhead charges Rate per sqm =
say
RW 10.27
P/L R.M.C. M-10 C.C. having avg. compressive strength 13.5 Mpa grade in foundation/encasement/pavement with or without chequered design including formwork, mixing in batching plant, p lacing vibrating with plate or needle curing etc. complete as directed by the Engineer. C/s. has to make his own arrangement for water for curing with Hessian cloth etc. & will not be paid separately.(MINIMUM CEMNT CONTENT 220 Kg/m³.) Unit = cum a)
Labour (for 20 cum) mukadam
day
Mason
day
Mechanic
day
Unskilled Labour(M)
day
Unskilled Labour (female)
day
Bhisti
day Total for 20 cum = Cost per cum =
b)
Material Cement
bags
Metal I & II
cum
Sand Water for mixing & curing
cum lit
Hassan cloth =6.67 M² FOR 7 REPETITIONS= Cost fo r 20 CUM (c+d)
sqm
c)
Machinary
Needle Vibrator Plate Vibrator d) Formwork Approx. 20 M3@ 206.64/M² Formwork Cost / M3 = e) Cost of transpor tation. f) Fixed cost of the batck mix plant Total = Profit & overhead charges
day day
sqm
Rate per cum =
say
RW 10.33
Providing & laying M-40 C.C.avg. compressive strength 45 MPa and avg.flextural strength of 5.0 MPa (As per IRC 15-2002.N.1.6) procured from M.C.G.M.approved R.M.C. plant including use of approved make plasticizer / retarder & Contractors water with ice flakes and transported by transit mixer and placing at work site. Compacting finishing, initial curing by approved curing compound & Contractors water and tarring the sides of slab with hot bitumen as specified and directed (w/c ratio o.4 maximum)(vata for curring will be paid separately.) (MINIMUM CEMENT CONTENT 350 kg/m³) Unit = cum a)
Labo ur (for 40.5 cum ) mukadam
day
Mason
day
Mechanic
day
Unskilled Labour(M)
day
Unskilled Labour (female)
day
Bhisti
day
Mistry
day Total for 40.5 cum = Cost per cum =
b)
Material Cement
bags
Metal I & II
cum
Sand Ice flakes Water for mixing & curing
cum kg lit
Admixtures
lit
Curing compound
lit
Bitumen
LS
Cost for 40.5 CUM (c+d) c)
Machinary
Needle Vibrator Screed Vibrator Plate Vibrator d) Formwork Approx. 40.5 M3 Formwork
day day day
sqm Cost / M3 =
e) f)
Cost of transpor tation. Fixed cost of the batck mix plant Total = Profit & overhead charges Rate per cum =
say
RW 10.39
Extra & over for providing and using special admitures/ plasticizers to achieve required crushing & Average flexural strength 5.0 Mpa of M40 grade concrete in 7 days. NOTE :1)THIS ITEM SHOULD BE OPRATED ONLY AFTER SPECIFIC SANCTION OF DIR(E.S.& P.). NOTE: 2)FOR SPECIAL ADMIXUERES ITEMS SUCH AS ELKEM MICROSILICA, POLYPROPELYNE FIBER, BSF GLANIUM SKY,EARLY STRENGTH SUPER PLASTYSIZER, STEEL FIBER REINFORCEMENT ETC. ORIGINAL CHALAN SHOULD BE PRODUCED , FAILING WHICH NO PAYMENT TO BE MADE. Unit = cum a)
b)
Labo ur (for 40.5 cum ) Mukadam
day
Mason
day
Mechanic
day
Unskilled Labour(M)
day
Unskilled Labour (female)
day
MISTRY
day
Machinary Screed Vibrator Plate Vibrator Needle Vibrator
day day day Total for 40.5 cum = Cost per cum =
c)
Material Cement
bags
Metal I & II
cum
Sand Ice flakes
cum kg
Special Admixtures =ELECIUM-51 Special Admixtures = GLANIUMSKY784
lit lit
Water for mixing & curing
lit
Curing compound
lit
Bitumen d)
LS
Formwork Approx.40.5 M3 Formwork
sqm Cost / M3 =
e) f)
Cost of transpor tation. Fixed cost of the batck mix plant Total = Profit & overhead charges Rate per cum = Cost as per RW 10.33 = Extra & over cost =
say
Item Code: CS-EW-1 Excavation in ordinary soil upto depth 1.5M Sr. No.
Description
Unit
Quantity
Rate
Details of Cost for : 10.00 Cum 1
2
HIRE CHARGES: Hydraulic Excavator (3D) with driver and fuel (JCB) Hire and running charges of loader. Vibro Roller for compaction 5 HP pump for dewatering LABOUR : Coolie Mate/ Female coolie
A
Total Hire Charge & Labour c ost
B C
Overhead & Proffit % on A Total (A+B)
D
Per unit cost
Day Day Day Day Day Day
Say Rs.
Amount
Item Cod e: CS-EW-2-a Add for each additional lift from 1.5m to 3m Sr. No.
A
Description Details of Cost for : 10.00 Cum LABOUR : Mate/ Female coolie Semi Skilled Labour (Beldar) Total Labour
B C D E
Total (A) Overhead & Proffit % on B Total (B+C) Per unit cost
1
Unit
Quantity
Rate
Amount
Day Day
Say Rs.
Item Code: CS-EW-2-b Add for each additional lift from 3m to 4.5m Sr. No.
1
Description Details of Cost for : 10.00 Cum LABOUR : Mate/ Female coolie Semi Skilled Labour (Beldar)
A
Total Labour
B C D
Total (A) Overhead & Proffit % on B Total (B+C)
E
Per unit cost
Unit
Quantity
Rate
Day Day
Say Rs.
Amount
Item Code: CS-EW-2-c Add for each additional lift from 4.5m to 6m Sr. No.
1
Description Details of Cost for : 10.00 Cum
Unit
LABOUR : Mate/ Female coolie Semi Skilled Labour (Beldar)
A
Total Labour
B C D
Total (A) Overhead & Proffit % on B Total (B+C)
E
Per unit cost
Quantity
Rate
Amount
Day Day
Say Rs.
Item Code: CS-CW-1
Description A
B
C
Details of Cost for : 1.00 Cum Unit
MATERIALS : Stone aggregate 20mm
cum
Coarse sand
cum
Cement
tonne
LABOUR: Needle Vibrator operator
Day
Beldar
Day
Bhishti
Day
Mixer
Day
Vibrator
Day
Centering & shuttering
Sqm
Overhead & Proffit % o n A Total (A+B+C)
Quantity
Rate
Amount
Item Cod e: CS-MW-1-a
Description MATERIALS : Common burnt clay F.P.S (non modular) Bricks of class designation 7.5 Cement mortar 1:3 (1 cement : 3 coarse sand). LABOUR: Mason 1st Class Mason IInd Class Coolie Bhishti
Details of Cost for : 1.00 Cum Unit
Quantity
Rate
Amount
Rate
Amount
1000
Day Day Day Day Add C.P & OH @ % on Rate per One Cum:
Item Code: CS-MW-1-b
Description MATERIALS : Common burnt clay F.P.S (non modular) Bricks of class designation 7.5 Cement mortar 1:4 (1 cement : 4 coarse sand). LABOUR: Mason 1st Class Mason Ilnd Class Coolie Bhishti
Details of Cost for : 1.00 Cum Unit
Quantity
1000
Day Day Day Day Add C.P & OH @ % on Cost for 1.00 Cum Rate per One Cum:
Item Code : HE-2-12
Melting time reqd. per ele. in minute
Time per R.M. weld in minutes
Total Time
Length of weld per day(8hrs) in R.M.
Thickne ss of Plate in mm
Dia. of Electrode used
No. of Electro des Used
4mm
6mm
6
3.2
19.2
19.2
25
5mm
9mm
9
3.2
28.8
28.8
16.67
6mm
7mm
7
3.2
22.4
12mm
12
3.4
40.8
63.2
7.59
Code No
Descrip tion Providing and fixing MS frame and cover with its complete assembly including supply and fixing of the same etc complete for sluice valve, butterfly valves and kinetic air valve chambers and as directed and specified by Engineer In charge. The MS plate used for the cover shall be 20 mm thick.The new MS cover shall have anit skid arrangement.The anti skid arrangement shall be provided by welding 4mm thick MS flats of 50 mm width and 300 mm center to center. The rate for this item is worked out on per Nos. basis, calcualtion are done considering the cover of size 900x1200 mm. Note : Tolerance of +/5% of mentioned standard weights acceptable.
HE-2-16
Rate of electrode per No.
Cost per R.M.
Unit
Material Charges Mild Steel Plate 20 mm Thick
Kg
Mild Steel Flats 50 mm wide and 4 mm thick
Kg
MS Frame 900x1200 mm
Kg
Cost of Fabrication/ Welding
Kg
Labour Charges
Total Cost
Qty
Contra ct-ors Profit and Overhe ad Charge s
Labo ur & Mac hinery Cost Per RM
Rate
Amount
Total Rate per R.M. in Rs.
Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male Labour)
Shift
Semi Skilled Labour (Beldar)
Shift
Fitter (grade 2) /Gas cutter
Shift
A
Total Of Material, Labour & Hire
B
Overhead Sundries Water Charges and Contractors profit of % on A
Total Cost (A+B)
Per Unit Cost Code No
HE-2-3
Description Supplying, transporting MS fabricated material on site, aligning, fixing in position, tack welding including marginal cutting, synthetic Rubber packings etc. a) Minor fixtures such s man hole frame & covers, pressure and non-pressure type blank flanges, loose flanges, rings, small pieces to form sadd le pieces, ladders, platforms, stiffner rings etc. b) Major fixtures such as tees, domes, bends, branches, flange ring assembling etc. Details of cost for 9000 Kgs of MS Fabricated Material is worked out.
Rs./ Kg Unit
Assu mpti on s Cost of MS plates, strips etc is inclusive of excise duty Calculation based on fabricating materal we ighing Material Charges MS Plate 10 mm Thick Fabrication Charges
Kg Rs/K g
Add 20% extra for complexity of fabrication and minor fitment at site Labour Charges for Loading & Unloading Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male abour)
Shift
Qty
Rate
Amount
Hire Charges Mobile crane - with boom length 30m (min output 300 cu.m per shift)
Shift
Lorry Hire Charges
Shift
A
Total Of Material, Labour & Hire
B
Overhead Sundries Water Charges and Contractors profit of 15% on A Total Cost (A+B) Rs/M .T
Per Unit Cost
Item code :- HE-3-16 Descrip tion Details of cost for butterfly valve with flange a dapter MATERIAL Butterfly Valve of Dia 1500 mm PN 1.0 Flange Adaptor of 1500 mm (PN 1.0) HIRE CHARGE LABOUR CHARGE Fitter (grade 1) / Drilling M/c Operator / Grinding Machine operator / Erector
Each Each Shift
Shift
Fitter (grade 2) /Gas cutter Semi Skilled Labour (Beldar) Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male Labour) Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male Labour) Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male Labour) Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male Labour) Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male Labour) Total Labour charge A B C
Unit
Total Material, Labour and Hire Charge Overhead and Contractors profit on A Cost of each Say
Shift Shift Shift Shift Shift Shift Shift
Qty
Rate
Amount
Code: HE-3-6 Descrip tion Details of cost for 1 sluice valve MATERIAL
Unit
Sluice Valve of dia ___mm PN 1.0 Tail Pieces HIRE CHARGE
Each Each
Welding Machine with Generator set
Qty
Rate
Amount
Qty
Rate
Amount
Shift Shift Shift
Total Hire charge LABOUR CHARGE Fitter (grade 2) /Gas cutter Welder Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male Labour)
Shift Shift Shift 0 Shift
Total Labour charge A B C
Code No
HE-4-1
Total Material, Labour and Hire Charge Overhead and Contractors profit on A Cost of each Say Description Making connection on live CI/DI main of various sizes including cutting of pipes with pipe cutting machine, providing & fixing, DI pipe upto 1 M. length of distance peice on live main , specials such as tee & collar,jointing the pipes with mechanical joint as per IS 13382 / 1992 sealing with rubber gasket of SBR, with cast iron follower gland and mild steel zinc coated nut bolts suitable for CI/DI pipe, pumping out body water, etc complete in all respect as directed by Engineer in Charge Note : (1) The required excavation, shoring, encasement in cement concrete, any pipe/specials/sluice valve provided beyond Tee will be paid separately under relevant items. Note : (2) Rebate for salvation cost of old pipe has been considered and old pipes shall be removed by the contractors as directed. One Cross Connection can be done in Half Day/Shift Material Charges _____ mm Dia. DI K9 Class Pipe
Unit
R.M
____mm x ___mm CI mechanical joint all socket tee with gasket / No. _____mm CI mechanical joint collar with gasket / No.
Nos. Nos.
Labour Charges Fitter (grade 1) / Drilling M/c Operator / Grinding Machine operator / Erector
Shift
Semi Skilled Labour (Beldar)
Shift
Operator of Pump Gunite M/C or Compressor
Shift
Hire Charges Pump for Dewatering 5 Hp Pipe Cutting Machine____ mm Dia A
Total Of Material Hire Charges & Labo ur
B
Overhead and Contractors profit of __% on A
C
Rebate for salvation cost of old p ipe Salvage Cost of pipe ___mm Dia( Length of Salvage pipe = Length of Tee+ 1 m pipe + length of collar)
Shift Shift
Kg
Total Cost (A+B-C)
Per Unit Cost
Code No
HE-4-3
Description Making connection on live CI/DI water main of ….. mm dia., including cutting of pipes with cutting machine, providing & fixing, DI pipe upto 1 M. length of branch pipe, specials such as saddles, bends, distance pieces, flanges, collars etc. (suitable for lead joint), jointing the pipes with lead joint and pumping out body water etc. complete in all respects. Note : (1) The required excavation, shoring, encasement in cement concrete & sluice valve will be paid separately under relevant items. One Cross Connection can be done in One Day/Shift
Rs/N os.
Unit
Material Charges ___ mm Dia. DI K9 Class Pipe
R.M
Cost of Saddle Piece ….. mm x ….. mm
Nos.
……mm CI joint collar
Kg.
Qty
Rate
Amount
CI 90 Deg. Bend …. mm
Kg.
Rubber Gasket ….mm
Nos.
Zinc coated 16 mm dia.100 mm long bolt with nut, washers etc.
Nos.
Fuel Wood
Kg.
Kerosene
Lts.
Pig Lead 6.10 x 4 joints
Kg.
Spun yarn 0.35 x 4 Joints
Kg.
Labour Charges Fitter (grade 1) / Drilling M/c Operator / Grinding Machine operator / Erector
Shift
Semi Skilled Labour (Beldar)
Shift
Operator of Pump Gunite M/C or Compressor
Shift
Hire Charges Centrifugal Pump 100 mm inclusive of cost of deisel A
Total Of Material Hire Charges & Labo ur
B
Overhead and Contractors profit of 15% on A
C
Total Cost (A+B)
D
Code No
HE-4-5
Per Unit Cost Description Making connection on live MS water main of various sizes, including cost of cutting, supplying, loading, transporting on site, unloading, lowering in trenches, assembling of required MS specials, MS pipe and jointing the pipes / specials etc. with butt and lap welding joint, removing body water etc complete in all respect as directed by Engineer in Charge. For following sizes. Note : (1) The required excavation, shoring, encasement in cement concrete & supply and fixing of sluice valve will be paid separately under relevant item. The Cross Connection can be done in two Day/Shift Material Charges Cost Of MS Specials : Flange, Branch Pipe, Stiffner Plate, Doubler etc. For _____mm x_____ mm connection Oxygen - Lumpsum
Shift
Rs/N os. Unit
Nos. L.S
Qty
Rate
Amount
Acytelene - Lumpsum
L.S
Welding rods
Nos.
Labour Charges Fitter (grade 1) / Drilling M/c Operator / Grinding Machine operator / Erector
Shift
Semi Skilled Labour (Beldar)
Shift
Operator of Pump Gunite M/C or Compressor
Shift
Welder
Shift
Hire Charges Centrifugal Pump 100 mm inclusive of cost of deisel Welding Machine with Generator Set Gas Cutter Set A
Total Of Material Hire Charges & Labo ur
B
Overhead and Contractors profit of 15% on A
C
Total Cost (A+B)
D
Code No
HE-6-1
Per Unit Cost
Description Providing and fixing CI Mechanical joint split collars suitable for repair of cracks/ leakages of CI/ DI pipes of 150 mm dia. as per MCGM specifications complete with sealing rubber gasket made of SBR and galvanized 'T' bolts and nuts. The whole assembly mechanically and Hydraulically tested to the provisions laid down in IS 1538/1993 or IS 13382/1992 whichever is applicable. This item includes dewatering of bodywater cleaning of pipe and arresting leakages etc complete as directed by Engineer in Charge. Details of cost for 4 Joints ( 4 joints of 150 mm can be done in one shift) Material -------- mm Dia. Mechanical Collar Split Joint Labour Charges
Shift Shift Shift
Rs/N os.
Unit
Nos.
Qty
Rate
Amount
Fitter (grade 1) / Drilling M/c Operator / Grinding Machine operator / Erector Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male abour) Operator of Pump Gunite M/C or Compressor
Shift Shift Shift
Hire Charges Shift
Deisel Generator
Shift
A
Total Of Material, Labour & Hire
B
Overhead Sundries Water Charges and Contractors profit of ---------% on A
C
Total Cost (A+B)
D
Code No
HE-6-4
Shift
Pump for Dewatering 5 HP 1 Nos Tipper truck with 5 cum capacity
Rs/N os.
Per Unit Cost
Description Providing and fixing CI Mechanical joint Double Socket with Flanged Tees with Branch Flanged Tees, (dimensionally described inTable - 19 of IS : 13382 / 1992) inclusive of Sealing Rubber Gasket of SBR (dimensionally described in IS :12820), Cast Iron Follower Gland and Mild Steel Nut Bolts zinc coated or otherwise protected from ru sting and suitable for CI/DI Pipes of 150 mm Dia etc complete as directed by Engineer in Charge Details of cost for 8 Joints ( 8 joints of ----- mm can be done in one shift)
Unit
Material …….mm Tees Labour Charges Fitter (grade 1) / Drilling M/c Operator / Grinding Machine operator / Erector Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male abour) A
Total Of Material, Labour & Hire
B
Overhead Sundries Water Charges and Contractors profit of ------% on A
C
Total Cost (A+B)
D
Per Unit Cost
Nos. Shift Shift
Rs/N os.
Qty
Rate
Amount
Code HE-3-30
Descrip tion Details of cost for Kinetic air valve with sluice valve MATERIAL Kinetic Air Valve of Dia 80mm PN 1.0 Sluice Valve HIRE CHARGE LABOUR CHARGE Fitter (grade 1) / Drilling M/c Operator / Grinding Machine operator / Erector
A B C Code No
HE-4-7
Unit
Rate
Amount
Qty
Rate
Amount
Each Each
Shift
Fitter (grade 2) /Gas cutter Fitter (grade 2) /Gas cutter Welder Semi Skilled Labour (Beldar) Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male Labour) Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male Labour) Total Labour charge Total Material, Labour and Hire Charge Overhead and Contractors profit on A Cost of each Say
Shift Shift
Description Discarding the existing live CI/DI/MS water main of 150 mm Dia. by plugging the same including cost of pipes and specials, Supplying, loading, transporting on site, unloading, lowering in trenches, assembling the CI / MS pipes / specials of required diameter, etc. complete including cost of mechanical cap or and with spun yarn and molten lead including caucking etc complete in all respect as directed by Engineer in Charge & including cost of lead for following diameters. The cost of item is for plugging the water main on either side at one location. Note :(1) The required excavation, shoring, encasement in cement cement concrete & sluice valve will be paid separately under relevant items. Note :(2) Rebate for salvation cost of old pipe has been considered and old pipes shall be removed by the contractors as directed. Work can be done in one Day/Shift 1 M. pipe will be removed for capping the water main the exsisting water main will be plugged from both ends.
Unit
Material Charges CI Mechanical End Cap ---- mm Dia.
Qty
Nos.
Labour Charges Fitter (grade 1) / Drilling M/c Operator / Grinding Machine operator / Erector
Shift
Semi Skilled Labour (Beldar)
Shift
Operator of Pump Gunite M/C or Compressor
Shift
Hire Charges Pipe Cutting machine for ---- mm Pump for Dewatering 5 Hp A
Total Of Material Hire Charges & Labo ur
B
Overhead and Contractors profit of % on A
C
Rebate for salvation cost of old p ipe Salvage Cost of pipe ---- mm Dia ( 1 m x 32.18 kg )
D E Code No
HE-4-1
Shift Shift
Kg
Total Cost (A+B-C) Per Unit Cost Description Making connection on live CI/DI main of various sizes including cutting of pipes with pipe cutting machine, providing & fixing, DI pipe upto 1 M. length of distance peice on live main , specials such as tee & collar,jointing the pipes with mechanical joint as per IS 13382 / 1992 sealing with rubber gasket of SBR, with cast iron follower gland and mild steel zinc coated nut bolts suitable for CI/DI pipe, pumping out body water, etc complete in all respect as directed by Engineer in Charge Note : (1) The required excavation, shoring, encasement in cement concrete, any pipe/specials/sluice valve provided beyond Tee will be paid separately under relevant items. Note : (2) Rebate for salvation cost of old pipe has been considered and old pipes shall be removed by the contractors as directed. One Cross Connection can be done in Half Day/Shift Material Charges mm Dia. DI K9 Class Pipe
Rs/N os. Unit
R.M
mm x mm CI mechanical joint all socket tee with gasket / No.
Nos.
mm CI mechanical joint collar with gasket / no.
Nos.
Labour Charges Fitter (grade 1) / Drilling M/c Operator / Grinding Machine operator / Erector
Shift
Semi Skilled Labour (Beldar)
Shift
Operator of Pump Gunite M/C or Compressor
Shift
Hire Charges
Qty
Rate
Amount
Pump for Dewatering 5 Hp Pipe Cutting Machine 300 mm Dia A
Total Of Material Hire Charges & Labo ur
B
Overhead and Contractors profit of 15% on A
C
Rebate for salvation cost of old p ipe Salvage Cost of pipe 300 mm Dia( Length of Salvage pipe = Length of Tee+ 1 m pipe + length of collar)
D E Code No
HE-7-4
Shift Shift
Kg
Total Cost (A+B-C) Per Unit Cost Description The transfer of existing service connections include cutting the existing connections, plugging the holes, supplying & fixing new Gun metal ferrules, required GI fittings(heavy) supplying & fixing new 'C' class G.I.pipes up to 1 meter length and and making the hole with hand tools, including necessary excavation and backfilling etc complete in all respect as directed by Engineer in Charge . Note : (1) Rebate for salvation cost of old pipe has been considered and old pipes may be removed by the contractors as directed. (2) Only MCGM approved GI pipe brands shall be used, all pipe and pipe fittings shall be C class (heavy grade) having ISI marking.
Rs/N os. Unit
Work will be done in half Day/Shift Material 15 mm Dia Class C GI Pipe
RM
15 mm Gun metal ferrule
Nos.
15 MM GI bend
Nos.
15 mm GI union coupling
Nos.
15 mm GI elbow
Nos.
15 mm plug
Nos.
15 mm coupling
Nos.
15 mm double barrel nipple
Nos.
Spun Yarn
Kg
White Zinc
Kg
Labour Fitter (grade 1) / Drilling M/c Operator / Grinding Machine operator / Erector
Shift
Semi Skilled Labour (Beldar) Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male Labour)
Shift Shift
Qty
Rate
Amount
Hire Charges Hand Held Tools A
Total Of Material, Labour & Hire
B
Overhead Sundries Water Charges and Contractors profit of --------% on A
C
Rebate for Salvation o f Old Pipe
D E Code No
HE-7-2
LS
Rebate for old GI 15 mm Dia Pipe ( Weight of pipe = 1.503 Kg /RM)
Kg
Salvation Cost for old ferrule 15 mm dia
Kg
Total Cost (A+B-C) Per Unit Cost Description Supplying, providing laying and jointing GI pipes in trenches of following class and diameter by wrapping them by hessian cloth with tar coating and including any nominal pipe length required to be laid above ground level, conveyance from stores to site work, all labour, necessary excavation, backfilling, giving satisfactory hydraulic test, etc complete in all respect as directed by Engineer in Charge. Note : Only MCGM approved GI pipe brands shall be used, all pipe and pipe fittings shall be C class (heavy grade) having ISI marking.
Rs/N os. Unit
Pipe laying and jointing work for 50 M length can be done in one day/Shift Material ________ mm Dia Class C GI Pipes (2 % wastage considered) Cost of Hesian Cloth for Wrapping @ 5 % of the pipe cost
R.M L.S
Labour Fitter (grade 1) / Drilling M/c Operator / Grinding Machine operator / Erector
Shift
Semi Skilled Labour (Beldar)
Shift
Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male Labour)
Shift
A
Total Of Material, Labour & Hire
B
Overhead Sundries Water Charges and Contractors profit of ___% on A
C
Total Cost (A+B)
D
Per Unit Cost
Rs/R .M
Qty
Rate
Amount
Code No
HE-8-4
Description Providing and laying 200 mm thick hand sets dry rubble soling including filling the interestics with small chips, ramming etc. complete for foundations of pedestals, chairs, thrust blocks, etc. complete in all respect and as directed by Engineer In Charge. Work of 10 Sqm can be done in one day
Unit
Qty
Rate
Amount
Qty
Rate
Amount
Material Charges RUBBLE FOR SOLING 10SqmX0.2m = 2 Cum Rubble chips 2CumX0.2 Labour Charges Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male abour) Semi Skilled Labour (Beldar) Mason (brick layer) 1st class A
Total Of Material, Labour & Hire
B
Overhead Sundries Water Charges and Contractors profit of ___ % on A
C
Total Cost (A+B)
D
Code No
HE-8-5
Per Unit Cost Description Providing M-20 cement concrete encasement with sulphur resistance cement to pipes, in thrust blocks etc., mixing, laying, consolidating by mechanical vibrator, curing etc. complete in all respect and as directed by Engineer In Charge. (M.S. reinforcement if provided will be paid separately.)
Cum Cum
Shift Shift Shift
Rs/S qm Unit
Rate worked out for 1 brass or 2.83 CuM.of concrete Material Charges Sulphate Resisting Cement (SRC) 23 Bags = 23X50 = 1150 Kg Stone Aggregate (Metal II) : 20-32 mm nominal size Stone Aggregate (Metal I) : 6-12 mm nominal size Labour Charges Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male abour) Semi Skilled Labour (Beldar) Mason (brick layer) 1st class Supervisor/Mistry/Mukadam / Foreman Bhisti (Water Man)
M.T Cum Cum
Shift Shift Shift Shift Shift
Hire Charges A
Total Of Material, Labour & Hire
B
Overhead Sundries Water Charges and Contractors profit of ____ % on A
C
Total Cost (A+B)
D
Code No
HE-8-26
Per Unit Cost Description Supplying, transporting and fixing S .P. fire hydrants including mouth piece, duck foot bend, S.V. as per specifications & drawing, fixing flanged socket, supplying and laying C.I./ M.S. pipe upto 2 mtrs. length and jointing the same with spun yarn, molten lead, including caucking etc. complete as d irected & as specified in tender. (as per IS : 908) Note: Construction of valve chamber will be p aid separately Assu mpti on s Cost of fire hydrant including Valve including transport (Market rate)
Rs/C um Unit
Nos.
Weight of External hydrant Number of units
Kg Nos.
Material Charges Fire Hydrant Add 5% for gaskets Hardware etc,
Nos. L.S
Labour Charges for Loading, Handling Unloading & Erection Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male abour) Fitter (grade 1) / Drilling M/c Operator / Grinding Machine operator / Erector A
Total Of Material, Labour & Hire
B
Overhead Sundries Water Charges and Contractors profit of ….% on A
C
Total Cost (A+B)
D
Shift
Per Unit Cost
Shift Shift
Rs/N os.
Qty
Rate
Amount
Code No
HE-6-3
Description Providing and fixing CI Mechanical joint Double Socket any degree bends, (dimensionally described in IS :13382 /1992) inclusive of Sealing Rubber Gasket of SBR (dimensionally described in IS : 12820), Cast Iron Follower Gland and Mild Steel Nut Bolts zinc coated or otherwise protected fro m rusting and suitable for CI/DI pipe of size 150 mm Dia etc complete as directed by Engineer in Charge. NOTE : The averge out rate for MJ double socket 90 45 22.5 and 11.25 has been considered for " All Degree Bend" the ratio taken is 1:1:3:5 taking into consideration the usage of the joint. Details of cost for 12 Joints ( 12 joints of …...mm can be done in one shift)
Unit
Qty
Rate
Amount
Qty
Rate
Amount
Material ….. mm dia. CI Mechanical joint Double S ocket any degree bend Labour Charges Fitter (grade 1) / Drilling M/c Operator / Grinding Machine operator / Erector Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male abour) A
Total Of Material, Labour & Hire
B
Overhead Sundries Water Charges and Contractors profit of …..% on A
C
Total Cost (A+B)
D Code No
HE-8-27-a
Per Unit Cost Description Cutting of exsisting cement concrete road upto350 mm depth by using Diamond Saw machine etc. complete in all respects and as directed by Engineer In Charge. Note : The charges for supplying water and electricity are exclusive of the ra te worked out. 20 m Cutting work can be done in one day/shift HireCharges for Generator Cost of Water Required for the job
A
Total Of Material, Labour & Hire
B
Overhead Sundries Water Charges and Contractors profit of …...% on A
C
Total Cost (A+B)
D
Per Unit Cost
Nos.
Shift Shift
Rs/N os. Unit
L.S L.S
Rs/N os.
Item CodeHE-2-9 Description A
C
D E F
Sr No. SWD-142
Unit
Rate (Rs)
Amount (Rs)
Material Pipe Inner Diameter Outer Diameter Dimensions of plate Length of plate Thickness of plate Weight of plate/RM (additional 5% fo r wastages, spiders) including taxes
B
Qty.
m m m m m MT
Labour Helper Welder Supervisor Total - Labour Cost (inclu ding 1% labour cess) Hire Charges Mobile crane charges Truck charges Welding set with generators Gas cutting machine Total - Hire charges
day day day
day day day day
Sub Total(B+C) Overheads and profit @ % Total/RM
Description water entrances clear size of chamber
Unit
Bed concrete (M15 CC) 1.18 x 1.28 x 0.15 CC Cap (M 20 CC) including shuttering 2x(0.75+0.85) x0.23 x0.10
Cu.M
0.5
Cu. M
Precast RC Runner Beam (M.200 CC)
R. M
B.M.in cement mortar 1:4
Cu. M
Qty
Rate 0.6
Amt
2x (0.75+0.85)x0.23x0.93 -(0.25*3.14x0.3x0.3x0.23) 12 mm thk plaster in C.M.1:2 ( 2 x(0.52 +0.62) x0.93 )- (0.25 x3.14 x0.3 x0.3 )
Sq.M.
Overheads and profit @ …..% Total cost Per unit cost
Code No HE-2-1
Description
Unit
Supplying mild steel pipes to site of work / any municipal store fabricated in any ISI/ ISO certified company, from mild steel plates of approved quality and thickness, confirming to IS 3589 . The M.S. plates shall bare corresponding ISI mark. The item includes marking, cutting, rolling bending, welding using automatic submerged arc type welding machine, factory testing of pipes, loading at fab rication yard/ factory transportation to site of work/ any municipal store using truck/ trailer, unloading and stacking nea r place of work etc complete as specified and as directed by Engineer in Charge. . Each pipe shall be about 5 to 7.5 mtr. long, fabricated as per IS:3589 and suitable for 10 kg/cm2 working pressure( spirally welded pipes fabricated from strips are not acceptable) Details of cost for MS pipe …. mm ….. mm thick Assumptions Pipe Dia (NB) Pipe thickness Pipe Length (each pipe piece) Number of pipes installed in one shift Total pipe Length Pipe weight
mm mm Mtr Nos. Mtr Kg
Material Charges MS Plate ... mm Thick Fabrication Charges
Kg Rs/K g
Labour Charges for Loading & Unloading Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male abour)
Shift
Qty
Rate
Amt
Hire Charges Mobile crane - with boom length 30m (min output 300 cu.m per shift) Lorry Hire Charges A
Total Of Material, Labour & Hire
B C
Overhead Sundries Water Charges and Contractors profit of % on A Total Cost (A+B)
D
Shift Shift
Rs/R. M
Per Unit Cost
Item Code- WSP-2-19 12.5 mm cement plaster of mix in CM1:1 (1 cement: 1 fine sand)
Code
Details of Cost for : 10.00 Sqm Description MATERIALS : Cement mortar 1:1 (1 cement : 1 fine sand) MACHINERY 40% of cost of material LABOUR : Nozzleman Helper Bhisthi
Unit
Qty
Rate
Cum
Day Day Day Total :
Add water charges @ % on Add C.P & OH @ % on Cost for 10.00 Sqm Rate per One Sqm:
Rs.
Amt
Code: FMR-7.57/2011 Structur al Steel Barricading. A.-Mater ial Requ ir emen t: -
Sr. No 1 2 3 4
Description Flats ISA 40 X 40 X 5 ISMB 250 X 125 2.5 M X 2 M X 1.25 mm thk M.S.Sheet
Length / area / volume 3.5 14.43 3.26
Unit Wt in Kg /m 1.57 3 37.3
5
9.8125
Unit R.mt R.Mt R.mt Sq.M .
Say Consider wastage @ 5%
Weight in Kgs
Rate
Amount
Rate
Amount
5.495 43.290 121.598 49.0625 219.446 219.500 10.975 230.475
Say-
B
Fabrication
Discription
231
219.500
Skilled Labour / Machine
Quantity Nos
Unit
For 8 boards fabrication requirement:Fitter Black Smith Welder Helper Supervisior Welding Machine DG set 33KVA DG Operator
2
Nos
2
6 2 6 1
Nos Nos Nos Nos
6 2 6 1
32
Hr
32
16
Hr
16
no
0.5
Add for sundries,welding roads etc @ 5 % Total=
Add 15 % overheads Total= Per Board Rate= Per Kg Rate= Say :-
C
Transportation ,Loading / unloading within lead of 10 Km up to site location 219.5
Discription For 14 nos of Barricades
Skilled Labour / Machine
Nos
Tipper Hydra Mazdoor
1 8 8
Unit
Quan tity
Rate
Amount
Day Hr Nos
CP & Overheads
Per Board Rate= Per Kg Rate= Say= D
Erection by Hydra Crane at site location (Including Cost of Drill bit ,Drilling Machine ,DG Set ,tools etc.) 219.5
Discription For 32 Barricading Boards
Skilled Labour / Machine Tata 407 Hydra Helper Driller Drill Bit Drill Machine Consumebles ,Sundries etc.
Nos 1 8 6 4 4 1.5
Unit Day Hour Nos Nos Nos 10 Hrs
L.S.
Quan tity
Rate
Amount
Add 15 % overheads Total= For one board= per kg rate Say= E
Painting
Discription
Skilled Labour / Machine
Nos
Unit
Quan tity
Rate
Amount
For two Barricades :(10Sq.M.) Painter Helper
1.5 2
Material Requirement Paint Synthetic enamal Primer Red Oxide Brush Sandpaper etc. Add 15 % overheads Total= Lettering with black Japan Paint Per Sq.M. of board=
Days Days
lit lit L.S.
no
1.63 0.8
60
say F
Less Scrap Value Discription
90% of total weight
Skilled Labour / Machine
Nos
Unit
Quan tity
Rate
207.9
Rate for 1 board 2.5 X 2 M size= Per running meter rate= Considering at least 8 repetetions = Say=
Amount
Code No.
Descrip tion
Unit
BW-2-21-a
Providing and placing in position controlled cement concrete of M-25 grade for foundation work with minimum cement 400 kg./cum. and water cement ratio not exceeding 0.4 for RCC raft foundation slab with V notches Sloped / flat / strlp footings, pile caps tie beams to required lines / levels including leveling, compacting by vibrators, curing including shuttering, centering as necessary and required etc. complete as specified and as directed but excluding reinforcement. Using Concrete Mixer Unit = cum Taking output = 15 cum a) Material Cement Coarse sand 20 mm Aggregate 10 mm Aggregate b) Labour Mate Mason Mazdoor c) Machinery Concrete mixer (cap. 0.40/0.28 cum) Generator 33 KVA Per Cum Basic Cost of Labour, Material & Machinery (a+b+c) d) Formwork @ % of a+b+c. e) Contractor's profit & Overhead charges @ ….% on (a+b+c+d) Cost for 15 cum = a+b+c+d+e Rate per cum = (a+b+c+d+e)/15
tonne cum cum cum
Quantity
Rate Rs
day day day hour hour
say
BW-5-8
Providing Fusion Bonded Epoxy Coating (FBEC) to reinfo rcin g steel bars as per IS 13620: 1993 specificatio ns fo r a coating thickness of 175 microns ( with permissible variation of 50 microns) including testing at plant etc. complete as per specification s. Unit - MT a) Material Fusion Bonded Epoxy Coating (FBEC) for 8 mm to 32 mm dia
MT
Cost Rs
Wastage in cut length @ % P.V.C coated G.I wires Repairs to cut ends and damages with special liquid epoxy & Carefull handling
MT kg cum
Transportation c) Contractor's profit & Overhead charges @......% on (a+b) Cost per sqm =
say
CS-CW-35-b
Reinfor cement fo r R.C.C. work all co mplete: - . Fe415 Details of Cost for : 100.00 Kg Description MATERIALS: Deformed twisted steel bars = 1.00 q Add % wastage = Total = 1.05 q Cover block LABOUR: For straightening, cutting, bending, binding and placing in positionBlaks smith I Class Beldar Sundries and binding wire L.S.
Unit
Quantity
Rate
Amount
quint L.S.
Day Day L.S. Total:
Add C.P & OH @ % on Cost for 1000.00 Kg Rate per One MT:
CS-CW-1-b
P/L CC inclu ding centering - All level: 1:2:4 - Coarse sand, 20mmstone aggregate. Details of Cost for : 1.00 Cum Description MATERIALS: Stone aggregate 20mm Coarse sand Cement LABOUR: Needle Vibrator operator Beldar Bhishti Mixer
Unit cum cum tonne Day Day Day Day
Quantity
Rate
Amount
Vibrator Centering & shuttering
Day Sqm Total:
Add C.P & OH @ % on Cost for 1.00 Cum Rate per One Cum: Providing & laying rough shahbad stone floor ing with 25mm thk. C.M. beding of CS-FL-04-a proportion 1:4 and pointing. Description Details of Cost for : 20.00 Sqm 1 MATERIAL: Rough shahbad Cost of cement mortar 1:4 Cement mortar 1:2 for pointing 2 LABOUR : Foreman Mason Beldar (M) Waterman A Total Material & Labour cost Total of A = B Overhead & Proffit % on A C Total (A+B) D
Unit
Quantity
Rate
Sqm Cum Cum Day Day Day Day
Per unit cost Say Rs.
HE-1-3
Supplying, lowering, laying and jointing in trenches C.I. Class 'LA' , S/S pipes conforming to IS:1536 with CI / MS specials of following diameter including chamfering cut edges of pipes for specials and fixing with Styrene Butadiene Rubber (SBR) gaskets conforming to IS:5382 & IS:12820 in proper position, grade and alignment etc complete in all respect and as directed by Engineer in Charge including conveyance of material from any municipal stores in Greater Mumbai to site of work, including cost of jointing materials and rubber rings labour, giving hydraulic testing upto 6 kg/sqm pressure etc complete as directed by Engineer in Charge ---- mm Dia Per Unit Cost of Pipe
Amount
Lowering Laying & Jointing Cost Total Cost for Supply Lowering Laying & Jointing
Rs/R.M
WATER PROOFING TREATMENT TO BASEMENT LIFT PITS
CS-WP-33
Description
Unit
Quantity
Rate
Amount
Rate
Amount
QUANTITY FOR CALCULATION : 1 SQM FOR FLOOR TREATMENT MATERIALS ROUGH SHAHABAD 20-25 mm
sqm
CEMENT
BAGS
SAND
CU.M.
WATER PROOFING COMPOUND
KG
LABOUR PAVIOR
DAY
MALE MAZDOOR
DAY
FEMALE MAZDOOR
DAY
FOR SIDE FACE MATERIALS CEMENT
BAGS
SAND
CU.M.
WATER PROOFING COMPOUND
KG
LABOUR PLASTERER
DAY
MALE MAZDOOR
DAY
FEMALE MAZDOOR
DAY Total
Add C.P & OH @15% on QUANTITY FOR 1 SQM Rate per One SQM :
CS-EW-10
Dewatering
Sr. No.
Description Details of Cost for 3HP pump for dewatering 1
Hire Charges
Unit
Quantity
Pump of 3 HP Capacity 2
Day
Labour Coolie for cleaning slush
A
Total Labour & eqipments
B
Add for tools, hire charges of pipe & i t's fixtures etc.
C
Total (A+B)
D
Overhead & Proffit 15% on C
E
Total (C+D)
F
Per unit cost (i. e. per Hr/HP)
Day
%
Say Rs.
RW 3.18
Providing & fixing in the footpath, 80 mm thick Lacquer coated (Reflective) interlocking gray cement concrete pavers in red (Terra Cotta) Black, Brown, Lemon Yellow or any colour with vermeticular or any antiskid texture on top surface of approved pattern/ shape and colour having average crusting strength 40 N/mm² manufactured in double layer precast concrete blocks. The top layer of paver block should be 12 to 15 mm thick and consist cubical shape stone aggregate 8 mm size sieve 100% passing and retain on 4.75 mm size sieve , silica sand and with pure iron oxide ultra voilete stabilized pigment @ 5% by weight of cement and should be coated with lacquer having hard, high abrasive resistance and water repellent. The bottom layer should be 45 to 48 mm thick having 12 mm size sieve 100% passing aggregate as per technical specification placed on uniformly graded river sand cushioning of average compacted thickness 25 mm properly compacted with mechanical compactor with required level, grade and camber etc. complete as specified and as directed by the Engineer. Unit = sqm
Cost for 1 sq mtr a) Labour
b)
Pavior / Tiler
day
Labour
day
Material
60 mm thick Lacquer coated ( Reflective) interlocking gray cement concrete pavers Bedding Sand (screened -for 25 mm thk & jointing) c) Machinery Vibrator
sqm
cum
day
Profit & overhead charges Rate per sqm =
say
RW 3.19
Providing & fixing in the carriageway interlocking , 100 mm thick grey cement concrete unishape pavers in red (Terra Cotta) Black, Brown, Lemon Yellow or any colour with vermeticular or any antiskid texture on top surface of approved pattern/ shape and colour having average crusting strength 50 N/mm² manufactured in double layer precast concrete blocks, as per technical specification placed on uniformly graded river sand cushioning of average compacted thickness 25 mm properly compacted with mechanical compactor with required level, grade and camber etc. complete as specified and as directed by the Engineer. Unit = sqm
Cost for 1 sq mtr a) Labour
b)
Pavior / Tiler
day
Labour
day
Material
60 mm thick Lacquer coated ( Reflective) interlocking gray cement concrete pavers Bedding Sand (screened -for 25 mm thk & jointing) c) Machinery Vibrator
sqm
cum
day
Profit & overhead charges Rate per sqm =
say
Item code :- HE-3-16-e Descrip tion HE-3-16 Details of cost for butterfly valve with flange a dapter MATERIAL Butterfly Valve of Dia ---- mm PN 1.0 Flange Adaptor of --- mm (PN 1.0) HIRE CHARGE LABOUR CHARGE Fitter (grade 1) / Drilling M/c Operator / Grinding Machine operator / Erector
Qty
Rate
Amount
Qty
Rate
Amount
Each Each Shift
Shift
Fitter (grade 2) /Gas cutter Semi Skilled Labour (Beldar) Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male Labour) Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male Labour) Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male Labour) Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male Labour) Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male Labour) Total Labour charge A B C
Unit
Shift Shift Shift Shift Shift Shift Shift
Total Material, Labour and Hire Charge Overhead and Contractors profit on A Cost of each Say
Item code :- HE-3-16-f Descrip tion HE-3-16 Details of cost for butterfly valve with flange a dapter MATERIAL Butterfly Valve of Dia --- mm PN 1.0 Flange Adaptor of ---- mm (PN 1.0) HIRE CHARGE LABOUR CHARGE Fitter (grade 1) / Drilling M/c Operator / Grinding Machine operator / Erector
Unit
Each Each Shift
Shift
Fitter (grade 2) /Gas cutter Semi Skilled Labour (Beldar) Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male Labour) Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male Labour) Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male Labour) Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male Labour) Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male Labour) Total Labour charge A B C
Shift Shift Shift Shift Shift Shift Shift
Total Material, Labour and Hire Charge Overhead and Contractors profit on A Cost of each Say
Code No
HE-7-3-ab-c-d &e
Description Removing and replacing existing GI pipes with new GI pipes in trenches of following class and diameter by wrapping them by hessian cloth with tar coating and including any nominal pipe length required to be laid above ground level, conveyance from stores to site work, all labour, necessary excavation, backfilling, giving satisfactory hydraulic test, etc complete in all respect as directed by Engineer in Charge. Note :1)Rebate for salvation cost of old pipe has been considered and old pipe may be removed as directed. 2) Only MCGM approved GI pipe brands shall be used, all pipe and pipe fittings shall be C class (heavy grade) having ISI marking.
Unit
Pipe laying and jointing work for 50 M length can be done in one day/Shift Material ________ mm Dia Class C GI Pipes (2 % wastage considered) Cost of Hesian Cloth for Wrapping @ 5 % of the pipe cost
R.M L.S
Labour
A
Fitter (grade 1) / Drilling M/c Operator / Grinding Machine operator / Erector
Shift
Semi Skilled Labour (Beldar)
Shift
Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male Labour)
Shift
Total Of Material, Labour & Hire
Qty
Rate
Amount
B
Overhead Sundries Water Charges and Contractors profit of ___% on A
C
Total Cost (A+B)
D
Per Unit Cost
CS-CW-1c
Rs/R.M
P/L CC includ ing centerin g - All level: 1:3:6 Coarse sand, 20mm stone Details of Cost for : 1.00 Cum Description MATERIALS: Stone aggregate 20mm Coarse sand Cement LABOUR: Needle Vibrator operator Beldar Bhishti Mixer Vibrator Centering & shuttering
Unit
Quantity
Rate
Amount
cum cum tonne Day Day Day Day Day Sqm Total:
Add C.P & OH @ % on Cost for 1.00 Cum Rate per One Cum:
Code No
Description
Unit
Qty
Rate
Amount
Code No
Description Taking access opening on C.I./ D.I.Water main by machine cut ( 2m / 3m length) and reinstating the same by using mechanical joint collar and SBR rings, including dewatering of body water and subsoil water, etc. complete in all respect and as directed by the Engineer In Charge for following diameters of CI/DI water mains: In case pipe is da maged, replacement pipe to be paid as per item rate
Unit
Qty
Rate
Amount
HE-10-1-a
For 150 mm Dia Pipe line Material Charges CI mechanical joint collar Rubber Gasket 150 mm Dia
Nos. Nos.
Labour Charges Fitter (grade 1) / Drilling M/c Operator / Grinding Machine operator / Erector
Shift
Semi Skilled Labour (Beldar)
Shift
Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male abour)
Shift
Hire Charges Dewatering Pump of 5HP 1 Pump for 2 shifts required Hire Charges for Pipe Cutting machine for 150 mm Dia. A
Total Of Material Hire Charges & Labo ur
B
Overhead and Contractors profit of 15% on A
C
Total Cost (A+B)
D
Per Unit Cost
Shift Shift
Rs/Nos.
Code No
HE-10-1-b
Description Taking access opening on C.I./ D.I.Water main by machine cut ( 2m / 3m length) and reinstating the same by using mechanical joint collar and SBR rings, including dewatering of body water and subsoil water, etc. complete in all respect and as directed by the Engineer In Charge for following diameters of CI/DI water mains: In case pipe is damaged, replacement pipe to be paid as per item rate For 250 mm Dia Pipe line
Unit
Qty
Rate
Amount
Qty
Rate
Amount
Material Charges CI mechanical joint collar Rubber Gasket 250 mm Dia
Nos. Nos.
Labour Charges Fitter (grade 1) / Drilling M/c Operator / Grinding Machine operator / Erector
Shift
Semi Skilled Labour (Beldar)
Shift
Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male abour)
Shift
Hire Charges Dewatering Pump of 5HP 1 Pumps for 2 shifts required Hire Charges for Pipe Cutting machine for 250 mm Dia. A
Total Of Material Hire Charges & Labo ur
B
Overhead and Contractors profit of 15% on A
C
Total Cost (A+B)
D
Per Unit Cost
Code No
HE-10-1-c
Description Taking access opening on C.I./ D.I.Water main by machine cut ( 2m / 3m length) and reinstating the same by using mechanical joint collar and SBR rings, including dewatering of body water and subsoil water, etc. complete in all respect and as directed by the Engineer In Charge for following diameters of CI/DI water mains: In case pipe is damaged, replacement pipe to be paid as per item rate
Shift Shift
Rs/Nos.
Unit
For 300 mm Dia Pipe line Material Charges CI mechanical joint collar Rubber Gasket 300 mm Dia.
Nos. Nos.
Labour Charges Fitter (grade 1) / Drilling M/c Operator / Grinding Machine operator / Erector
Shift
Semi Skilled Labour (Beldar)
Shift
Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male abour)
Shift
Hire Charges Dewatering Pump of 5HP 1 Pumps for 0.5 shifts required Hire Charges for Pipe Cutting machine for 300 mm Dia. A
Total Of Material Hire Charges & Labo ur
B
Overhead and Contractors profit of 15% on A
C
Total Cost (A+B)
D
Per Unit Cost
Code No
HE-10-1-e
Description Taking access opening on C.I./ D.I.Water main by machine cut ( 2m / 3m length) and reinstating the same by using mechanical joint collar and SBR rings, including dewatering of body water and subsoil water, etc. complete in all respect and as directed by the Engineer In Charge for following diameters of CI/DI water mains: In case pipe is damaged, replacement pipe to be paid as per item rate
Shift Shift
Rs/Nos.
Unit
For 600 mm Dia Pipe line Material Charges CI mechanical joint collar Rubber Gasket 600 mm Dia. Labour Charges
Nos. Nos.
Qty
Rate
Amount
Fitter (grade 1) / Drilling M/c Operator / Grinding Machine operator / Erector
Shift
Semi Skilled Labour (Beldar)
Shift
Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male abour)
Shift
Hire Charges Dewatering Pump of 5HP 1Pumps for 0.75 shifts required Hire Charges for Pipe Cutting machine for 600 mm Dia. Hire Charges for Chain Pulley Block and Jack
Shift Shift Shift
Total Of Material Hire Charges & Labo ur Overhead and Contractors profit of 15% on A Total Cost (A+B) Per Unit Cost
Code No
HE-10-1-g
Description Taking access opening on C.I./ D.I.Water main by machine cut ( 2m / 3m length) and reinstating the same by using mechanical joint collar and SBR rings, including dewatering of body water and subsoil water, etc. complete in all respect and as directed by the Engineer In Charge for following diameters of CI/DI water mains: In case pipe is damaged, replacement pipe to be paid as per item rate
Rs/Nos.
Unit
For 900 mm Dia Pipe line Material Charges CI mechanical joint collar Rubber Gasket 900 mm Dia.
Nos. Nos.
Labour Charges Fitter (grade 1) / Drilling M/c Operator / Grinding Machine operator / Erector
Shift
Semi Skilled Labour (Beldar)
Shift
Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male abour)
Shift
Hire Charges
Qty
Rate
Amount
Dewatering Pump of 5HP 1 Pumps for 0.75 shifts required Hire Charges for Pipe Cutting machine for 900 mm Dia. Painting Machine A
Total Of Material Hire Charges & Labo ur
B
Overhead and Contractors profit of 15% on A
C
Total Cost (A+B)
D
Per Unit Cost
Code No
HE-10-2-a
Description Scrapping and cleaning the internal surface of water main by mechanical scrapper including support machinary, manpower, fuel and tran sport of equipment etc complete in all respect and as directed by the Engineer In Charge and removing the scrapped material by plugging and preparing the pipe for lining for following diameters of C.I./D.I. pipes, including dewatering of body water and subsoil water, including removing scrap and debris.
Shift Shift Shift
Rs/Nos.
Unit
For 150 mm Dia Pipe line 60 M length of pipe line can be cleaned in one day
Material Charges Deisel for Tractor & other machinery
Lts
Engine Oil
Lts
Labour Charges Supervisor/Mistry/Mukadam / Foreman
Shift
Semi Skilled Labour (Beldar)
Shift
Operator of Pump Gunite M/C or Compressor
Shift
Hire Charges Pipe cleaning equipment set (set of scrapers and rubber pads , PVC rods, Steel cable etc) for 8 hours
Shift
Qty
Rate
Amount
Dewatering Pump of 5HP Tractor with trolley Water Tanker 5 to 6 KL capacity
Shift Shift Hr
Hire Charges for Jeep ( Inclusive of Cost of Fuel & Driver) Trolley mounted CC TV probe per shift of 8 hours
Shift
A
Total Of Material Hire Charges & Labo ur
B
Overhead and Contractors profit of 15% on A
C
Total Cost (A+B)
D
Per Unit Cost
Code No
HE-10-2-b
Description Scrapping and cleaning the internal surface of water main by mechanical scrapper including support machinary, manpower, fuel and tran sport of equipment etc complete in all respect and as directed by the Engineer In Charge and removing the scrapped material by plugging and preparing the pipe for lining for following diameters of C.I./D.I. pipes, including dewatering of body water and subsoil water, including removing scrap and debris.
Shift
Rs/RM
Unit
For 250 mm Dia Pipe line 65 M length of pipe line can be cleaned in one day
Material Charges Deisel for Tractor & other machinery
Lts
Engine Oil
Lts
Labour Charges Supervisor/Mistry/Mukadam / Foreman
Shift
Semi Skilled Labour (Beldar)
Shift
Operator of Pump Gunite M/C or Compressor
Shift
Hire Charges Pipe cleaning equipment set (set of scrapers and rubber pads , PVC rods, Steel cable etc) for 8 hours
Shift
Qty
Rate
Amount
Dewatering Pump of 5HP Tractor with trolley Water Tanker 5 to 6 KL capacity
Shift Shift Hr
Hire Charges for Jeep ( Inclusive of Cost of Fuel & Driver) Trolley mounted CC TV probe per shift of 8 hours
Shift Shift
Total Of Material Hire Charges & Labo ur Overhead and Contractors profit of 15% on A Total Cost (A+B) Per Unit Cost
Code No
HE-10-2-c
Description Scrapping and cleaning the internal surface of water main by mechanical scrapper including support machinary, manpower, fuel and tran sport of equipment etc complete in all respect and as directed by the Engineer In Charge and removing the scrapped material by plugging and preparing the pipe for lining for following diameters of C.I./D.I. pipes, including dewatering of body water and subsoil water, including removing scrap and debris.
Rs/RM
Unit
For 300 mm Dia Pipe line 70 M length of pipe line can be cleaned in one day
Material Charges Deisel for Tractor & other machinery
Lts
Engine Oil
Lts
Labour Charges Supervisor/Mistry/Mukadam / Foreman
Shift
Semi Skilled Labour (Beldar)
Shift
Operator of Pump Gunite M/C or Compressor
Shift
Hire Charges Pipe cleaning equipment set (set of scrapers and rubber pads , PVC rods, Steel cable etc) for 8 hours
Shift
Qty
Rate
Amount
Dewatering Pump of 5HP Tractor with trolley Water Tanker 5 to 6 KL capacity
Shift Shift Hr
Hire Charges for Jeep ( Inclusive of Cost of Fuel & Driver) Trolley mounted CC TV probe per shift of 8 hours
Shift
A
Total Of Material Hire Charges & Labo ur
B
Overhead and Contractors profit of 15% on A
C
Total Cost (A+B)
D
Per Unit Cost
Code No
HE-10-2-e
Description Scrapping and cleaning the internal surface of water main by mechanical scrapper including support machinary, manpower, fuel and tran sport of equipment etc complete in all respect and as directed by the Engineer In Charge and removing the scrapped material by plugging and preparing the pipe for lining for following diameters of C.I./D.I. pipes, including dewatering of body water and subsoil water, including removing scrap and debris.
Shift
Rs/RM
Unit
For 600 mm Dia Pipe line 60 M length of pipe line can be cleaned in one day
Material Charges Deisel for Tractor & other machinery
Lts
Engine Oil
Lts
Labour Charges
A
Supervisor/Mistry/Mukadam / Foreman
Shift
Semi Skilled Labour (Beldar)
Shift
Operator of Pump Gunite M/C or Compressor
Shift
Hire Charges Pipe cleaning equipment set (set of scrapers and rubber pads , PVC rods, Steel cable etc) for 8 hours
Shift
Qty
Rate
Amount
Dewatering Pump of 5HP Tractor with trolley Water Tanker 5 to 6 KL capacity
Shift Shift Hr
Hire Charges for Jeep ( Inclusive of Cost of Fuel & Driver) Trolley mounted CC TV probe per shift of 8 hours
Shift Shift
Total Of Material Hire Charges & Labo ur B
Overhead and Contractors profit of 15% on A
C
Total Cost (A+B)
D
Per Unit Cost
Code No
HE-10-2-g
Description Scrapping and cleaning the internal surface of water main by mechanical scrapper including support machinary, manpower, fuel and tran sport of equipment etc complete in all respect and as directed by the Engineer In Charge and removing the scrapped material by plugging and preparing the pipe for lining for following diameters of C.I./D.I. pipes, including dewatering of body water and subsoil water, including removing scrap and debris.
Rs/RM
Unit
For 900 mm Dia Pipe line 50 M length of pipe line can be cleaned in one day
Material Charges Deisel for Tractor & other machinery
Lts
Engine Oil
Lts
Labour Charges Supervisor/Mistry/Mukadam / Foreman
Shift
Semi Skilled Labour (Beldar)
Shift
Operator of Pump Gunite M/C or Compressor
Shift
Hire Charges
Qty
Rate
Amount
Pipe cleaning equipment set (set of scrapers and rubber pads , PVC rods, Steel cable etc) for 8 hours
Shift
Dewatering Pump of 5HP Tractor with trolley Water Tanker 5 to 6 KL capacity
Shift Shift Hr
Hire Charges for Jeep ( Inclusive of Cost of Fuel & Driver) Trolley mounted CC TV probe per shift of 8 hours
Shift
A
Total Of Material Hire Charges & Labo ur
B
Overhead and Contractors profit of 15% on A
C
Total Cost (A+B)
D
Per Unit Cost
Code No
HE-10-4
Description Providing in situ internal cement mortar lining as per AWWA C 602- 76 standards to distributory CI/DI water mains, with cement sand ratio 1:1 (Cement 43 grade : Godhra special sand) with the use of mortar lining machine including support machinary, manpower, fuel and tran sport of equipment, dewatering of body water and subsoil water etc complete in all respect and as directed by the Engineer In Charge , for following diameters and thickness of mortar lining.
Shift
Rs/RM
Unit
Qty
Rate
Amount
Dia
Thk
Length
Volume of Cement Mortar
150 250 300 450 600 750 900
4.65 4.65 4.65 7 7 7 7
60 65 70 60 60 55 50
0.13148 0.23739 0.30678 0.59376 0.79168 0.90713 0.98960
Assu mptio ns Made.
150 mm diameter with 4.65 mm lining thickness 250 mm diameter with 4.65 mm lining thickness 300 mm diameter with 7.0 mm lining thickness 450 mm diameter with 7.0 mm lining thickness 600 mm diameter with 7.0 mm lining thickness 750 mm diameter with 7.0 mm lining thickness 900 mm diameter with 7.0 mm lining thickness
Material Required f or Cement Mortar L ining For 1 cu.m lining cement = 1030 kg and Sand 0.7125 cum (Ref Nabhi Pub Vol 1 Page 577) For hose pipe 50 mm dia and 120 m L (considering Hopper) Cum of Cement
Code No
HE-10-4-a
0.23562 Total Vol. of Cement
Cement in Kg
No. of bags of Cement
Total Vol. of Sand
150 mm diameter with 4.65 mm lining thickness 250 mm diameter with 4.65 mm lining thickness 300 mm diameter with 7.0 mm lining thickness 450 mm diameter with 7.0 mm lining thickness 600 mm diameter with 7.0 mm lining thickness 750 mm diameter with 7.0 mm lining thickness 900 mm diameter with 7.0 mm lining thickness
0.36710 0.47301 0.54240 0.82938 1.02730 1.14275 1.22522
378.11 487.2 558.67 854.26 1058.1 1177 1262
7.5622 9.744 11.173 17.085 21.162 23.541 25.24
0.09 0.17 0.22 0.42 0.56 0.65 0.71
Description Providing in situ internal cement mortar lining as per AWWA C 602- 76 standards to distributory CI/DI water mains, with cement sand ratio 1:1 (Cement 43 grade : Godhra special sand) with the use of mortar lining machine including support machinary, manpower, fuel and tran sport of equipment, dewatering of body water and subsoil water etc complete in all respect and as directed by the Engineer In Charge , for following diameters and thickness of mortar lin ing.
Unit
Qty
Rate
Amount
For 150 mm Dia Pipe line 60 M length of mortar lining work can be done in one day Material Charges Cement for Mortar Lining Work Plaster Sand Deisel for Tractor & other machinery Engine Oil
Bag Cum Lts Lts
Labour Charges Semi Skilled Labour (Beldar)
Shift
Operator of Pump Gunite M/C or Compressor
Shift
Hire Charges Cement Mortar Lining machine
Shift
Tractor with trolley Water Tanker 5 to 6 KL capacity
Shift Hr
Hire Charges for Jeep ( Inclusive of Cost of Fuel & Driver) Trolley mounted CC TV probe per shift of 8 hours
Shift
Concrete Pump of 45 & 30 cum capacity Concrete Mixer - 1 cum
A
Total Of Material Hire Charges & Labo ur
B
Overhead and Contractors profit of 15% on A
C
Total Cost (A+B)
D
Per Unit Cost
Code No
HE-10-4-b
Description Providing in situ internal cement mortar lining as per AWWA C 602- 76 standards to distributory CI/DI water mains, with cement sand ratio 1:1 (Cement 43 grade : Godhra special sand) with the use of mortar lining machine including support machinary, manpower, fuel and tran sport of equipment, dewatering of body water and subsoil water etc complete in all respect and as directed by the Engineer In Charge , for following diameters and thickness of mortar lining. For 250 mm Dia Pipe line
Shift Shift Shift
Rs/RM
Unit
65 M length of mortar lining work can be done in one day Material Charges Cement for Mortar Lining Work Plaster Sand Deisel for Tractor & other machinery Engine Oil
Bag Cum Lts Lts
Labour Charges Semi Skilled Labour (Beldar)
Shift
Operator of Pump Gunite M/C or Compressor
Shift
Hire Charges
Qty
Rate
Amount
Cement Mortar Lining machine Tractor with trolley Water Tanker 5 to 6 KL capacity Hire Charges for Jeep ( Inclusive of Cost of Fuel & Driver) Trolley mounted CC TV probe per shift of 8 hours Concrete Pump of 45 & 30 cum capacity Concrete Mixer - 1 cum
A
Total Of Material Hire Charges & Labo ur
B
Overhead and Contractors profit of 15% on A
C
Total Cost (A+B)
D
Per Unit Cost
Code No
HE-10-4-c
Description Providing in situ internal cement mortar lining as per AWWA C 602- 76 standards to distributory CI/DI water mains, with cement sand ratio 1:1 (Cement 43 grade : Godhra special sand) with the use of mortar lining machine including support machinary, manpower, fuel and tran sport of equipment, dewatering of body water and subsoil water etc complete in all respect and as directed by the Engineer In Charge , for following diameters and thickness of mortar lining.
Shift Shift Hr Shift Shift Shift Shift
Rs/RM
Unit
For 300 mm Dia Pipe line 70 M length of mortar lining work can be done in one day Material Charges Cement for Mortar Lining Work Plaster Sand Deisel for Tractor & other machinery Engine Oil
Bag Cum Lts Lts
Labour Charges Semi Skilled Labour (Beldar)
Shift
Operator of Pump Gunite M/C or Compressor
Shift
Qty
Rate
Amount
Hire Charges Cement Mortar Lining machine Tractor with trolley Water Tanker 5 to 6 KL capacity Hire Charges for Jeep ( Inclusive of Cost of Fuel & Driver) Trolley mounted CC TV probe per shift of 8 hours Concrete Pump of 45 & 30 cum capacity Concrete Mixer - 1 cum
A
Total Of Material Hire Charges & Labo ur
B
Overhead and Contractors profit of 15% on A
C
Total Cost (A+B)
D
Per Unit Cost
Code No
HE-10-4-e
Description Providing in situ internal cement mortar lining as per AWWA C 602- 76 standards to distributory CI/DI water mains, with cement sand ratio 1:1 (Cement 43 grade : Godhra special sand) with the use of mortar lining machine including support machinary, manpower, fuel and tran sport of equipment, dewatering of body water and subsoil water etc complete in all respect and as directed by the Engineer In Charge , for following diameters and thickness of mortar lining.
Shift Shift Hr Shift Shift Shift Shift
Rs/RM
Unit
For 600 mm Dia Pipe line 60 M length of mortar lining work can be done in one day Material Charges Cement for Mortar Lining Work
Bag
Plaster Sand Deisel for Tractor & other machinery
Cum
Engine Oil Labour Charges
Lts Lts
Qty
Rate
Amount
Semi Skilled Labour (Beldar)
Shift
Operator of Pump Gunite M/C or Compressor
Shift
Hire Charges Cement Mortar Lining machine Tractor with trolley Water Tanker 5 to 6 KL capacity Hire Charges for Jeep ( Inclusive of Cost of Fuel & Driver) Trolley mounted CC TV probe per shift of 8 hours Concrete Pump of 45 & 30 cum capacity Concrete Mixer - 1 cum
A
Total Of Material Hire Charges & Labo ur
B
Overhead and Contractors profit of 15% on A
C
Total Cost (A+B)
D
Per Unit Cost
Code No
HE-10-4-g
Description Providing in situ internal cement mortar lining as per AWWA C 602- 76 standards to distributory CI/DI water mains, with cement sand ratio 1:1 (Cement 43 grade : Godhra special sand) with the use of mortar lining machine including support machinary, manpower, fuel and tran sport of equipment, dewatering of body water and subsoil water etc complete in all respect and as directed by the Engineer In Charge , for following diameters and thickness of mortar lining.
Shift Shift Hr Shift Shift Shift Shift
Rs/RM Unit
For 900 mm Dia Pipe line 50 M length of mortar lining work can be done in one day Material Charges Cement for Mortar Lining Work
Bag
Plaster Sand Deisel for Tractor & other machinery
Cum
Engine Oil Labour Charges
Lts Lts
Qty
Rate
Amount
Semi Skilled Labour (Beldar)
Shift
Operator of Pump Gunite M/C or Compressor
Shift
Hire Charges Cement Mortar Lining machine Tractor with trolley Water Tanker 5 to 6 KL capacity Hire Charges for Jeep ( Inclusive of Cost of Fuel & Driver) Trolley mounted CC TV probe per shift of 8 hours Concrete Pump of 45 & 30 cum capacity Concrete Mixer - 1 cum
A
Total Of Material Hire Charges & Labo ur
B
Overhead and Contractors profit of 15% on A
C
Total Cost (A+B)
D
Per Unit Cost
RW 5.10
Shift Shift Hr Shift Shift Shift Shift
Rs/RM
P/L hot mixed graded Bituminous macadam with 3.30% ( with tolderance of +0.3) of 60/70 pen. Bitumen by weight of mix to the required grade, level and camber, rolling with 10/12 tones power roller,vibratory roller & sensor paver etc. complete as specified and as directed, using grading of II 'MORTH" and adding anti stripping agent 1.00% of by weight of bitumen )do--do-to thickness of 50mm.(using new material).(As per New Road Specifications Clause No. 351) Unit = cum Cost for 1 MT a)
Labour
Labours For sprading & laying b) Material Fine Aggregate Grit/Stone dust Coarse Aggregate Metal Bitumen 60/70 {(3.30% of material (±3% tolerance)}
day cum cum kg