Tabulated method of finding rates for itemsFull description
Rate Analysis for Hume Pipes
I have worked for Painting Rate analysis need few inputs & valuable suggestion for improving the same. The suggestion can be forwarded on email id [email protected] description
pppFull description
explanatory for working out rate analysis for various civil work quantities.
Full description
rateFull description
Full description
Rate+Analysis+Format
Civil WorkFull description
Full description
Pile Foundation Rate AnalysisFull description
Civil Work Rate AnalysisFull description
Full description
Standard Data Book - Road Rate AnalysisFull description
63 LDPE sheet 250 mm micron 64 HDPE 100 mm dia pipe 6 kg/sq.cm 65 Silver Sand 66 P.V.C Sheet 150 GSM 67 Size Stone 250*150*150
sq.mt rmt Cum Sq.mt Cum
400 21 39 7 3 15 40 150 0
62 Fixit Groove filling sealent Material
kg
63 LDPE sheet 250 mm micron 64 HDPE 100 mm dia pipe 6 kg/sq.cm 65 Silver Sand 66 P.V.C Sheet 150 GSM 67 Size Stone 250*150*150
sq.mt rmt Cum Sq.mt Cum
400 21 39 7 3 15 40 150 0
Name of Project Item No. from BOQ Name of Item Item Description Size of Member Shuttering Shuttering for 1 M3 conc. For Qty. Dry Volume Proportion of Concrete Grade MM- 7.5 Sr.No.
MES Ojhar II
Labour Material Cement Sand Aggregate Admixture Shuttering
C D E
Water & Elect. Charges Tools & Plants Contractors Profit
1 M3 1.52 M3 Cement Sand 1 2 Qty.
Aggregate 4
Total 7
Rate
Amount
Unit
1 No 5.75 Bags 0.43 Cum 0.87 Cum 0.31 Kg 0.00 Sqm
325
325.00
230 909 465 0 125
1322.50 394.77 403.89 0.00 0.00 2446.15
A+B
% 0.00% 0.00%
0.00 0.00 Total
2446.15 97.85
Rate / sq.mtr for 40 mm thick
Name of Project Ojhar II Item No. from BOQ Name of Item Item Description Size of Member Shuttering required for the same concrete Shuttering for 1 M3 conc. For Qty. 1 M3 Dry Volume 1.52 M3 Proportion of Concrete Cement Sand Grade MM- 10 1 4 Sr.No. A B 1 2 3 4 5
Requirments Labour Material Cement Sand Aggregate Admixture Shuttering
Qty.
Water & Elect. Charges Tools & Plants Contractors Profit Labour & Ecsis
Rate Rate per per Sq. Sq.mt mtrr for for 100 100 mm mm thi thicc Rate per Sq.mtr for 40 mm thic
Cement Sand Aggregate Admixture
Aggregate 8
Total 13
Rate
Amount
Unit
1 No 3.20 Bags 0.47 Cum 0.94 Cum 0.00 Kg 1.00 Sqm A+B
Name of Project Ojhar II Item No. from BOQ Name of Item Item Description Size of Member Shuttering required for the same concrete Shuttering for 1 M3 conc. For Qty. 1 M3 Dry Volume 1.52 M3 Proportion of Concrete Cement Sand Grade M- 15 1 3 Sr.No. A B 1 2 3 4 5
Requirments Labour Material Cement Sand Aggregate Admixture Shuttering
Water & Elect. Charges Tools & Plants Contractors Profit Labour & Ecsis
0% 0% 0.00% 0.00% Total
Name of Project Mes ojhar II. Item No. from BOQ Name of Item Item Description Size of Member Shuttering required for the same concrete Shuttering for 1 M3 conc. For Qty. 1 M3 Dry Volume 1.52 M3 Cement Sand Aggregate Proportion of Concrete Grade M- 25 1 5 10 Sr.No.
Requirments
A B 1 2 3 4 5
Labour Material Cement Sand Aggregate Admixture Shuttering
C D E F
Water & Elect. Charges Tools & Plants Contractors Profit Labour & Ecsis
Qty.
Unit
Rate
1 No 2.50 Bags 0.48 Cum 0.95 Cum 0.13 Kg 1.00 Sqm A+B
0% 0% 0.00% 0.00% Total
Rtae / Sq.mtr for 50 mm thk rate for 100 mm thk rate for 150 mm thk rate for 100 mm thk
Name of Project MES Ojhar II Item No. from BOQ Name of Item Item Description Size of Member Shuttering required for the same concrete Shuttering for 1 M3 conc. For Qty. 1 M3 Dry Volume 1.52 M3 Proportion of Concrete Cement Sand Aggregate Grade M- 25 1 2 4 Sr.No. A B 1 2 3 4 5
Requirments Labour Material Cement Sand Aggregate Admixture Shuttering
Qty.
Unit
Rate
1 No 5.80 Bags 0.43 Cum 0.87 Cum 0.29 Kg 8.00
Water & Elect. Charges Tools & Plants Contractors Profit Labour & Ecsis
Name of Project MES Ojhar II Item No. from BOQ Name of Item Item Description Size of Member Shuttering required for the same concrete Shuttering for 1 M3 conc. For Qty. 1 M3 Dry Volume 1.52 M3 Proportion of Concrete Cement Sand Aggregate Grade M- 25 1 1 2 Requirments
A
Labour
B 1 2 3 4 5
Material Cement Sand Aggregate Admixture Shuttering
Qty.
Unit
Rate
1 No 7.50 Bags 0.38 Cum 0.76 Cum 0.75 Kg 0.00 Sqm A+B
C D E F
Water & Elect. Charges Tools & Plants Contractors Profit Labour & Ecsis
Name of Project Item No. from BOQ 2.3 Name of Item Item Description Size of Member Shuttering required for the same concrete Shuttering for 1 M3 conc. For Qty. 1 M3 Dry Volume 1.52 M3 Proportion of Concrete Cement Sand Grade M- 25 1 1.5 Sr.No. A B 1 2 3 4 5
Requirments Labour Material Cement Sand Aggregate Admixture Shuttering
Water & Elect. Charges Tools & Plants Contractors Profit Labour & Ecsis
0% 0% 0.00% 0.00% Total
Name of Project Item No. from BOQ 14 Name of Item Item Description Size of Member Shuttering required for the same concrete Shuttering for 1 M3 conc. For Qty. 1 M3 Dry Volume 1.52 M3 Proportion of Concrete Cement Sand Grade M- 25 1 2 Sr.No.
Requirments
A
Labour
B 1 2 3 4 5
Material Cement Sand Aggregate Admixture Shuttering
Qty.
Aggregate 4
Total 7
Rate
Amount
Unit
1 No 6.20 Bags 0.43 Cum 0.87 Cum 0.31 Kg 8.00 Sqm A+B
C D E F
Water & Elect. Charges Tools & Plants Contractors Profit Labour & Ecsis
0% 0% 10.00% 0.00% Total
Name of Project Item No. from BOQ Ojhar Name of Item Item Description Size of Member Shuttering required for the same concrete Shuttering for 1 M3 conc. For Qty. 1 M3 Dry Volume 1.52 M3
Name of Project Using 40 mm aggregate Item No. from BOQ Name of Item Item Description Size of Member Shuttering required for the same concrete Shuttering for 1 M3 conc. For Qty. 1 M3 Dry Volume 1.52 M3 Proportion of Concrete Cement Sand Aggregate Grade M- 15 1 3 6 Sr.No.
Requirments
A B 1 2 3 4 5
Labour Material Cement Sand Aggregate Admixture Shuttering
C D E F
Water & Elect. Charges Tools & Plants Contractors Profit Labour & Ecsis
Qty.
Unit
Rate
1 No 3.50 Bags 0.46 Cum 0.91 Cum 0.18 Kg 1.00 Sqm A+B
Water & Elect. Charges Tools & Plants Contractors Profit Labour & Ecsis
Total
Rate/Sq.mtr
Brick work 115 mm thick MES Ojhar II Name of Project Item No. from BOQ Name of Item Item Description For Qty. Qty of B/W Dry Volume Dry Volume for 10 sq.mt Proportion of Concrete Grade M- 15 Sr.No. A B 1 2 3 4 5 6
Cement Sand B/W
1 sq.mt 0.12 cum 0.4 cum 0.05 M3 Cement Sand 1 4
Requirments Labour Material Cement Sand Scaffolding Bricks R/F Concrete
Qty.
Unit
Total 5 Rate
1 sq.mt
50
50.00
0.20 Bags 0.04 Cum 1.00 sq.mt 57.00 Nos 0.50 kg 0.00 cum
Water & Elect. Charges Tools & Plants Contractors Profit Labour & Ecsis
Amount
0% 0% 0.00% 0.00% Total
Block work 200 mm thick
Rate for 1 sq.mt
Name of Project Item No. from BOQ Name of Item Item Description For Qty. Qty of B/W Dry Volume Dry Volume for 10 sq.mt Proportion of Concrete Grade M- 15 Sr.No.
Cement Sand
200*200*450 mm B/W
1 sq.mt 0.2 cum 0.4 cum 0.08 M3 Cement Sand 1 4
Requirments
A B 1 2 3 4 5 6
Labour Material Cement Sand Scaffolding Concrete Block R/F Concrete
C D E F
Water & Elect. Charges Tools & Plants Contractors Profit Labour & Ecsis
Qty.
Total 5
Unit
Rate
Amount
1 sq.mt
80
80.00
0.46 Bags 0.06 Cum 1.00 sq.mt 12.00 Nos 0.00 kg 0.00 cum
Brick work 100 mm thick Name of Project Item No. from BOQ Name of Item Item Description For Qty. Qty of B/W Dry Volume Dry Volume for 10 sq.mt Proportion of Concrete Grade M- 15 Sr.No. A B 1 2 3 4 5 6
Requirments Labour Material Cement Sand Scaffolding Bricks R/F Concrete
Cement Sand
400*200*100 mm B/W
1 sq.mt 0.2 cum 0.4 cum 0.08 M3 Cement Sand 1 4 Qty.
Unit
Total 5 Rate
1 sq.mt
80
80.00
0.46 Bags 0.06 Cum 1.00 sq.mt 13.00 Nos 0.00 kg 0.00 cum
Water & Elect. Charges Tools & Plants Contractors Profit Labour & Ecsis
Amount
0% 0% 10.00% 0.00% Total
Rate for 1 sq.mt
Brick work 200 mm thick Name of Project Item No. from BOQ Name of Item Item Description For Qty. Qty of B/W Dry Volume Dry Volume for 10 sq.mt Proportion of Concrete Grade M- 15 Sr.No.
Cement Sand
400*200*200 B/W
1 sq.mt 0.2 cum 0.4 cum 0.08 M3 Cement Sand 1 4
Requirments
A
Labour
B 1 2 3 4 5 6
Material Cement Sand Scaffolding Bricks R/F Concrete
C D E F
Water & Elect. Charges Tools & Plants Contractors Profit Labour & Ecsis
Qty.
Total 5
Unit
Rate
Amount
1 sq.mt
80
80.00
0.46 Bags 0.06 Cum 1.00 sq.mt 13.00 Nos 0.00 kg 0.00 cum
Brick work 150 mm thick Name of Project Item No. from BOQ Name of Item Item Description For Qty. Qty of B/W Dry Volume Dry Volume for 10 sq.mt Proportion of Concrete Grade M- 15 Sr.No. A B 1 2 3 4 5 6
Cement Sand
400*200*150 mm B/W
1 sq.mt 0.15 cum 0.4 cum 0.06 M3 Cement Sand 1 4
Requirments Labour Material Cement Sand Scaffolding Bricks R/F Concrete
Qty.
Unit
Total 5 Rate
1 sq.mt
80
80.00
0.34 Bags 0.05 Cum 1.00 sq.mt 13.00 Nos 0.00 kg 0.00 cum
Water & Elect. Charges Tools & Plants Contractors Profit Labour & Ecsis
Amount
0% 0% 10.00% 0.00% Total
Brick work 115 mm thick
Rate for 1 sq.mt
Name of Project Item No. from BOQ Name of Item Item Description For Qty. Qty of B/W Dry Volume Dry Volume for 10 sq.mt Proportion of Concrete Grade M- 15 Sr.No.
Cement Sand
400*200*150 mm B/W 1 sq.mt 0.12 cum 0.4 cum 0.05 M3 Cement Sand 1 4
Requirments
A B 1 2 3 4 5 6
Labour Material Cement Sand Scaffolding Bricks R/F Concrete
C D E F
Water & Elect. Charges Tools & Plants Contractors Profit Labour & Ecsis
Qty.
Total 5
Unit
Rate
Amount
1 sq.mt
75
75.00
0.26 Bags 0.04 Cum 1.00 sq.mt 57.00 Nos 0.00 kg 0.00 cum
Brick work 115 mm thick Name of Project Item No. from BOQ Name of Item Item Description For Qty. Qty of B/W Dry Volume Dry Volume for 10 sq.mt Proportion of Concrete Grade M- 15 Sr.No.
B/W 1 sq.mt 0.12 cum 0.4 cum 0.05 M3 Cement Sand 1 4
Requirments
A
Labour
B 1 2 3 4 5 6
Material Cement Sand Scaffolding Bricks R/F Concrete
Cement Sand
400*200*150 mm
Qty.
Total 5
Unit
Rate
1 sq.mt
75
75.00
0.26 Bags 0.04 Cum 1.00 sq.mt 57.00 Nos 0.00 kg 0.00 cum