Detailed Project Report - Wapco India (P) Ltd 15KW Of Grid Solar Power Plant
Prepared by by:: - BGS Power Solutions Pvt Ltd, -"###$1
!ennai
Pro%e&t 'es&ription (!e purpose o) t!is pro%e&t is to install Solar P!otovoltai& *P+ 15 KW of rid solar power plant. (!is plant /ay be utili0ed to serve t!e needs o) Wap&o. WBO 23'2 L242(', a /a%ority owned subsidiary o) WBO 6oldins 2n&, !as pioneered t!e /anu)a&ture o) air-assisted and air bra7e syste/s )or &o//er&ial ve!i&les in 2ndia.
Solar Power Wit! t!e )ast depletion o) t!e non-renewable enery resour&es, t!ere is a tre/endous t!rust on eneratin renewable enery. Solar nery !as been identi8ed as one o) t!e drivin )or&es )or eneratin ele&tri&ity. 'urin t!e last two de&ades, t!e a&&elerated drop in sili&on, w!i&! is t!e )eedsto&7 /aterial )or /ost panels, !as /ade it possible )or solar panels to /ove )ro/ spa&e-based appli&ations to eneration o) enery )or &onsu/ption by t!e eneral popula&e. (!e solar power industry is rowin at a p!eno/enal rate lobally wit! t!e 9S, Ger/any, Spain and !ina leadin t!e way. 2ndustry eperts predi&t an annual rowt! rate o) about ;# per &ent )or several years into t!e )uture. Wit! es&alatin international oil pri&es and in&reasin &on&erns about lobal war/in, solar power represents a stratei& enery &!oi&e )or t!e )uture )or /ost o) t!e &ountries &urrently dependent on i/ported enery sour&es. Si/ilar &onsiderations apply in 2ndia as well. /ont!s w!i&! !as /ade a well-desined Solar power solution a better option,
environ/entally as well as 8nan&ially to a 'G *'iesel Generator Set power. 'ue to a /assive de8&it in t!e power se&tor in)rastru&ture and )uel supply use o) 'G !as been rowin rapidly in 2ndia. (!is !as led to /any issues in&ludin a risin oil i/port bill, loss o) revenue due to subsidies )or diesel and above all, in&reasin pollution in t!e &ountry.
Solar PV (Photo-Voltaic) Technologies (!ere are two /ain P+ te&!noloies na/ely Sili&on */ono&rystalline or poly-&rystalline or t!in 8l/s *(<. (!e latter in&ludes a/orp!ous sili&on and various &!e/istries )ro/ t!e 2GS *ad/iu/, 2ndiu/, Galliu/ and Seleniu/ )a/ily o) ele/ents. (!ou! (< panels !ave better t!er/al &!ara&teristi&s t!en Sili&on based panels, t!eir la&7 o) lon ter/ re&ord /a7es t!e/ a ris7ier alternative.
1>@#"A>" 3
Lonitude
C#@1#A1=
Syste/ Si0e
15KW
rea o) Syste/
15## s?uare )eet
Dearly esti/ated produ&tion )or t!e 15 7W Power Plant
Pro%e&t 'etails
=5>E5 KW6
Location
%hennai$ India
Latitude
1>@#"A>" 3
Lonitude
C#@1#′
Si0e *KW
15 KW*'
4odule (ype
Poly rystalline 6i! F&ien&y
2nverters
15 K+.
Project Stages (!e pro%e&t will be ee&uted in t!e )ollowin staes:
&lectrical Design . B.
(!is will be a 15 KW Solar P+ syste/ and will be a on Grid syste/ 'eliverables will in&lude t!e )ollowin drawins and do&u/entation: a. Site Layout b. 2nverter ' le&tri&al Sinle Line 'iara/ &. Sinle Line 'iara/ and 'etails d. le&tri&al Wire and onduit S&!edule and 'etails e. 2nverter onduit and Wirin 'etails ). ' Strin !art drawins
Rac'ing Syste Installation On&e t!e )easibilities studies are &o/pleted, sturdy ra&7in syste/ will be installed on t!e round w!i&! will be able to support t!e panels. (!is is a standard Ground 4ount ra&7in syste/.
PV Panels Installation P+ Panels will be installed on t!e ra&7in syste/ at an anle )a&in t!e sout!ern dire&tion.
%onnecting On&e t!e P+ Panels !ave been installed, t!e syste/ will be &o/pleted a)ter addin t!e inverter.
Key Pro%e&t e?uire/ents (!e )ollowin are t!e 7ey re?uire/ents )or t!e pro%e&t to be developed.
Perits ll asso&iated per/its re?uired )or t!e pro%e&t will be t!e responsibility o) t!e pro%e&t owners and will be provided prior to t!e pro%e&t &o//en&e/ent or at a /utually areed point in ti/e. ll learan&e and Per/its re?uired )or t!e trans/ission Line s!all be &arried out by lient, we !ave not in&luded &ost o) t!e (rans/ission Line.
Pro%e&t (as7 Owners!ip !ction
wner
1
'e8ne e?uire/ent
BGS Power Solution Pvt Ltd
=
Proposal
BGS Power Solution Pvt Ltd
>
Bill o) 4aterials *BO4
BGS Power Solution Pvt Ltd
;
ontra&tH
lient
5
'esin 'o&u/ent
BGS Power Solution Pvt Ltd
"
Pro&ure/ent
BGS Power Solution Pvt Ltd
E
2nstallation
BGS Power Solution Pvt Ltd
C
2nspe&tion
BGS Power Solution Pvt Ltd
$
o//issionin
1# Operational 6andover
BGS Power Solution Pvt Ltd BGS Power Solution Pvt Ltd
Project ando*er t t!e end o) t!e &o//issionin pro&ess, t!e pro%e&t will be !anded over as per t!e )ollowin proto&ol. usto/er will sin-of on all o) t!e )ollowin do&u/ents to &o/plete t!e !andover based on pre-establis!ed &riteria in t!e &ontra&t do&u/ent. -
(e&!ni&al Spe&i8&ations Technical Speci+cations ,or a ./Wp (D%) Installation (!is syste/ will re?uire a spa&e o) 15## SI9 <( o) oo) top to install. 2t is i/perative t!at t!ere is no potential )or s!adows as t!at will i/pa&t t!e per)or/an&e o) t!e panels.
Solar Photo*oltaic (PV) Mod#les Description
Type
4anu)a&turer
S!an Solar
4odule (ype
Poly&rystalline
4odule Part 3u/ber
>PSS"# =;5
4odule Wei!t
=# K
4odule 'i/ensions
1""# $$# 5#.> //
4odule 3o/inal Power
=;5 Watts pea7
3u/ber o) 4odules
Site and 4ountin plan dependent
S!an Solar 4odules are &erti8ed to 2H2 "1=15: =##5 standard and &on)or/ to Sa)ety lass 2 "1E># standard )or 1###+' appli&ations and WG uideline C$H$>= *. S!an Solar is in &o/plian&e wit! t!e 2nternational Iuality Syste/ Standard 2SO $##1:=###.
Solar Power conditioning Unit
Delta Solvia 15 TL Grid Tie Inverter Technical Specification
Rating(KVA) Output Wave Form DC Input Voltage Array Input Di#tortion ($%Dv) Output Freuen*y Wave 0orm Output voltage Output Regulation Cooling Inverter $ype Inverter 600i*ien*y Sleep 9o4e 1rote*tion# >o ?oa4 Con#umption Overloa4 Capa*ity ?CD Di#play
15
Sine wave =;#+'
22!"V &' + %, -.! /+ %, variation 1ure Sine "V AC 2 ('p3a#e) 2 Fan For*e4 5i 4ire*tional 78' at 0ull loa4 1rovi4e4 (#ele*ta:le :y #wit*3) Over loa4; S3ort *
/ In4i*ation(?6D)
Current; Output 1ower; Solar A**umulate4 KW3 = ri4 Volt Inv on; over loa4; *3arging; *3arge4 = DC 3ig3
Grid Mains Mode
AC Input Voltage AC Input Freuen*y Solar Charge Controller 911$ C3arge *ontroller C3arging 1V ImaB (Amp) Others
Operating $emperature Storage temperature 6n*lo#ure 1rote*tion Altitu4e(AS?) Operating %umi4ity Ep
"V ;-2 . !2 + %, ' %,
;#
Others
!" /// -+ C !2+ to ++ C/ I1 2 @9 (wit3out 4e!rating) 8+ ;non *on4en#ing
&lectrical Wiring (!ere are various types o) wirins t!at are utili0ed on site. (!ese vary )ro/ low to /ediu/ voltae ' and /ediu/ to !i! voltae . 2n ea&! o) t!e &ases we use t!e best all weat!er and w!ere re?uired 9+ prote&ted &ables. (!e 7ey is to 7eep our resistive losses *2= to t!e /ini/u/ )or /ai/u/ eF&ien&y.
0a#lt Protection Our engineer team designs the system with proper grounding including double isolation disconnects where required and fully protected system. Our system includes protection of the AC equipment against lightening using arrestors etc.
Monitoring This is an optional feature that we provide. Based on the accessibility many of the metrics related to performance including output and fault logs can be made available remotely. It is possible for people from across the world to monitor the performance and display related graphics on their laptops/destops or similar device.
Produ&t and Per)or/an&e Warranty
Prod#ct 1#arantee ll produ&ts uaranteed aainst /anu)a&turin de)e&ts )or a period o) 8ve years.
Syste Warranty (!is is provided as )ollows. Solar 4odules 2nverters
1# years o) li/ited warranty provided by t!e /anu)a&turer 5 years 4anu)a&turer Provided
Per)or/an&e GuaranteeJ
1= years o) $# power output =5 years o) C# power output
PV panel wiring diagra