1. 2. 3. 4. 5. 6. 7. 8. 9. 11 12 13 14 15 16. 17 18 19 20
21. 22.
INTRODUCTION EQUI EQUIPM PMEN EN LOCA LOCATI TION ON PROC PROCES ES DESC DESCRI RIPT PTIO IO PROC PROCES ES GUAR GUARAN ANTE TEES ES MECH MECHAN ANIC ICAL AL DESI DESIGN GN MATE MATERI RIAL AL OF CONS CONSTR TRUC UCTI TION ON PI
10 13 13
PRES PRESSU SURE RE VESS VESSEL EL INST INSTRU RUME ME TATI TATION ON AN ON ROL. ROL. INSU INSULA LA IO AN IREP IREPRO ROOF OFIN IN ELECTRICAL YO AI NOISE PAINTING
EN
AN
AC
IT AN INSP INSP PR IP CODE CODES, S, SPEC SPECIF IFIC ICAT ATIO IONS NS AN STAN STANDA DARD RD
ES
16 16 17 18 18 19 19 19 20 20
21 21
deli delive very ry of three Ga Dehy Dehydr drat atio io Proje Project ct EFf17 EFf1718, 18, in Kuwait.
Pack Packag ages es 1718-171-Z-1401!240i/3401
fo
fa
ca
package.
rf FS
Vendor. shal confirm sizes an
quan quanti titi ties es
Qty. 1.
171-C-140t
2.
171-C-2401
3.
171-C-34D1
4.
171-C-1402
5.
171-C-2402
6.
171-C·S402
Description
HP GAS DEHYD DEHYDRAT RATION ION COLUM COLUM
FUE GAS STRIPP STRIPPING ING COLUM COLUM
7.
8.
171·E·2401
9.
171-E-3401
10
171-E-1402
GLVeOL GLVeOL HEAT HEAT EXCHA EXCHANGE NGE
171-E-2402 12, 171-E-3402 13 ~A
171-E-1403
STILL STILL OVERH OVERHEAD EAD CONDE CONDENSE NSE
171·E-2403
15. 171-E-3403 16, 171-G-i401
AlB
LEA GLYCOL GLYCOL C!RCU C!RCULAT LATION ION PUMP PUMP
171·G·2401A1B
18 171-G-340iAlB 19, 171-K-1401 20,
171-K-2401
21
171-K·3401
22
23. 17H-2401A1B 24, 171-L-3401A1B
GL vcot REBOILER REBOILER BLOWER BLOWER
RICH RICH GLvc GLvcoi oi
FILT FILTER ER
25
RICH Gl
171-L-1402
vcoi CARBON FilTER
26. 171-L-2402 171·L·3402 28.
171-F-1401
29
171·F·240t
30
i71-F-3401
31
~7
GLYCOL AEBOllER
~Q4-
"\
-w-
&-
32. ~~1 33 ..3,
35
H1
(6
ABS9RBEA :A~E
S6FlI:IBBER
2462 ),!
34Q2
37
171-V-1403
38.
171-V-2403
GLvcoi, SURG
DRUM
39. 171-V-3403 40
GLYCO REGENERATION STilL
171·V·1404
41. 17i-V-2404 42.
171-V-3404
43
171-V-1405
GLYCOL FLAS
DRUM
44. 171-Y-2405 45
171-Y-3405 REBOILER FUE GAS SCRUBBER
46. 171-V-1406 47. i7i-V-2406 ...
48
~-
---------------
49. i7l-V-140B 50
---_
.....
..
--
-------------
171-V-3406 HYDROCARBO
SKI
DRUM
171-V-2408
51. 1ll·V-340B
t/ yet it te
th
me
ki
t/
iU
th
ve
me
rovi
by
sh ters 3.2
Design Data an cr teria.
hazardou
area
PROCESS DESCR8PTION
to
recovere
of conditioned
an
which city
.the
5.1
Coolers, 171-E-1301/2301/3301. 171-V-1302/2302/3302.
71·Z-340 ). 1401/2401/3401), C-1401/2401/340i).
1408/2408/3408). (A
fo
vi
th
he
-----------
.1
fi 102.
Refe to PFDs 1718-171-25-105.01
171-F-1401/2401/3401.
co ta
th
(171-V-1405/2405/3405), th
co 1401/2401/3401 th co th te (171·E-1402/2402/3402). 1404/2404/3404) at temperatur of S; st 1401/2401/3401) St (1
th thre phas ti
co separato
co
-V
vi th th
(171·V-1403/2403/3403). Lean lyco Circulat on Pump (171-G-1401/2401l3401 AlB) mp jean ti vi th (to (171-E-1404/2404/3404) ta tu
1402A1B ru
2402A1B te by vacuum truck. ti
tifo
1452/245213452
-------
171-Z-1451/2451/3451
G$$ DeII.gonion 17jcZ-,4Ct
..;.._._---_ -'- .-
-_
ec kog.
.;....
..
_.- .- ,_._._.
._ --..- ._-_
"~9" !{I'UTUJlIi) I. = . _ _ ._ ~ _ ._ o _ ._ ._ ._ .
_ . _ . -.-. -.-. _,.."._
,_ """
.
,""'
........
,.;..,
"_
-.
._ .~ -."~.'-'
,G•• Oehyd'$.lon
5.
_ ._ ._ ." . , _ . ~ .
_,=<
•
_
_
.•
_
Operat ng ondition Design flow (per train) :-
Maximum::;;;
ateria
ateria 0007
alance scenario plus nc usio of
alance docu ents 1718 1710022 RevB,
Minimum
Turndown
based
- -- -- -- -- -- aT I O tn € fv en d o
-E
design maximu used fi ti subject to change
affiffseOn tm3Towest--=-~-~-
achievable turndown. Inlet ga compositio
:-
package, presented withi the Heat an Material Balanc document 1718-171-GD-E-G000 to 0022Rev6 condensation properties an this effect ha to be of the also be present.
Conditions fo In et Stream
to Package
Stream
NOTES
t.
depressuring
calculations.
(8SoF).
60°C (140°F). Ambien SOoC
6S"C.
te
Stream
Revs.
Design Pressure barg (psig} 75. (1088tevt!
DeSign
Operating
°C (OF) Max:
bargJlIsl9l
Operating Temperature QC_(°F)
IZ I'll
\;<)
0. (1.5 min
\':1
(1
Offgas Inlet Scrubber liquids
ti
.8
(0::)
75.0 (108S ev l:I
93 200)
(653)
(G)
(1)
NOTES depressuring to
calculations te
Considerations
5.4.1
Glycol Dehydratio
Column
confirm packed column .is preferred. The vendor te an turndown process requ rement 5.4.2
lean Glycol Cooler HP incoming._g_as tem~ lean
tu
column
if
yd ti
th
fitt
th
th
vendor.
Emissions cess
provided
th
amount of flarin
it
with
fl
to
th
valves
te
inlet
positioned at elevatio (vendo to conf rm). 5.4.8
Glycol Drains glycol is storage.
Make-Up
is
the bulk
feed
Th
proces
p e o rm a nc e g ua ra n e e s ta te m en t s ha l g ua ra n e e
rate
0.7 bar (10.2 psi).
bH
MM
scenarios MMSC
gas)
re
co dition
withln th
Packag
stated in th
boun ary.
ta
te
in section
5.3.
7.2.3
th
Packag
boundary
f"
-- --
-.
Al
th
sl
.f
I-
Ii .H
ti
-F
cL
.~..
Lean
lyco Pump
Bl ke /C
7.2.7
tl
by
LP flare. open.
ir
piping an
equipmen
7.2.8 7.2.9
7.3
Utilities
7.3.1
Utilities ma
7.3.2
18-
E-
Electrica Powe Fo informat on Descriptio Narrativ
.4 Eq ipment Desi
ti ti
electrical power 1718-000-EA-E-E0001
Cond tion
with th foll wing guidellnes
(MOP) 1t .t
x1.15
--slt5lool31JaTg~(S01io--tf)OO]Jsig 9 b g (
-Men
3: bargi5iJ-]Jstg}---~--·-·-
P x 1.05 barq" 6.9 barg (100 psig))
any
maximu
expected differenti
pressure
1.0
150"C.
in
prot cted by relief va ves.
Shut-off Pressure pressure) norm flow
tati
120% differential head of
to
ch aracteristios
mp
tu
ti
ti Maximu O~eratin {MOTl \ ! J R to '350"Cl{662°F)
tile
1101
ti Tem~eratur
tern
fi
Design Tem!2erature
~MaXimumoperating)
emj:lerature +28 cj(+50A
OF)
ReliS
Higher th
50"'
(662 F)
th
se ecte
material
---'fhB-app-erd-estgTTterrrperaturErShaWnotbBiessilTan~3oe·(:ftt!;t.-4"Fl:·-.-·---------
specified
lowe than -29°C (-20.2°F),
ccording to th se ecte
Edepressuring procedures
material
fu
7. Operabilit
an
Fo th
Maintainabifit Isolatio
Phil soph
refe to 1718-171-GA-E-G000
fo
ta
ts
ta
IA
be co Phenolic Epoxy Coatin
9.1
ta
FCO
applicable to vessel
t,
c.
ti
IO
it
internal cl dding.
ti of Equipmen
supply.
9.2
th
contractor. 9.4
part cula
til>
th followin
crit ri
shal be foll wed.
E-
ti
Inte
ME
tt
It
te
It
flanges. nl
It
screen liner.
me t. III
inventory.
th
xp
ts
9.7
...--~--~-
piping shal be -fian§satsk-fd-OOge.------
with
sp cified fo th proj ct 10
ti
ve
to co firm
ti
re
ti
shal be provided
OO
Proces
an
the KO
Ut lity Pipi
nd layout an
specificatio 1718-000-HA-EEq ipment Location Specif cati n.
skid.
allo
ifting sl ng
to clea aUappurt nances
criteria.
ti
ft
However, th complete unit shal remain the. Vendor's responsi ility.
material an construction will be on by
comp
ti
oth (3)
co
otthe.fully
tr
fo
fitt
fo
tr
sh
sp ta At
10. EV
pressure vessels. 12
INSTRU ENTATION NDCONTRO
fo
safeguardi n9.
.c
ty
fi
to
co tr
ta
tr
shalt be in the
,. SD
addendum.
system (DCS/ESD). ----~-~--~~--
j_2~4- Contro aru::Unstr rnentati O__$¥stem-sb:alLprotactperSQ netaru:Lplantag_ainstinJ_ury__Dr
Dehydratio
unit
1718 171-GA-E-G0007 specificatio
of
"Shutdow
1718-171-GA-E-G0007.
Philosophy".
projec la an Blowdown Philosophy 1718-171-GA-E-GOOOB. he vendor shall, here ne essary provid batter li it connec ions at th sk dg an ensure ha the ga path to va ve open throughout de ressurin period e.g. EG il depressurisation calculations fo both calculations shal be used bythe vendor to justif material selection
ehyd at on Pa kage ca ESD system.
shanai be in accordance with th instrumentation documents in this specification
provided an al user connecte in accordance with th specifications All electronic segregation in accordanc wit the specifications. hazardous area.protectio system shall be intrinSIcall
safe
wherever possible.
instrument shal be in accordance with th KOC specification KOC-E-004. Selection Installation and Maintenance of Electrica Equipment in Hazardous Areas and criteria. monitoring instrumentatio wher practicable. shal be
al brat on ithout shutdo n. he la an trip in trumen shal be supp ed th eparat tapp ng ns al ed on th package. alar an hutdow signal hall be sent to th DCS/ESD. 12.13
Emergenc Shutdown Philosoph Th emergenc shutdown philosophy to be applie is describe in the specificatio No.015 YH 1004," pecifica io or me genc hu do an epressur sing
13.
INSULATIO
AND FIREPROOfiNG
surfac temperatur abov 70 DC if th surfac is in an area wher accidental contac ithi 0. ro he edge of he alkw y. he protection or guards made of suitable materials, etc.
ay be therma in ulatio
ti
th
te
mi
te
ve
me
ti
referenced in this specification.
t.
Co e,
othe standard
specif ed in th
projec specifications
contractor. 15.
ELECTFUCAL
High
Inductio
Motors an criteria
Ue c on ne c o n
h ap la n c oJ r m o e a h in g
to th ct ------.~---··-------K\j-c-neconTrnendeo_Practtceror.
s.
KO -E-020,"KO Recommende Equipmen an criteria
s ys te m , e le c
ca
fi ti EaffhlngAndS-onrnng
c on t n u
cl
Practice fo Electr ca Installation
sh KO rla:
of Packag
an operation. Layout shal be
16.2
17.
te
accordance with th spec fication 718-000-HA-E yo me ti fi ti
xc
tu
te
NOISE 1m.
Vendor shal comp
with thes
requirements
Vendor,
Noise control
obstruct on to remove an replaced followin
18
ma nten nce.
PAiNTING
sy
- -- - .- - - -- - - -- -
any
s,
fa
rime
III
- - - -, -- - - -- ,- - - -- - - -- - - ,- - - -- - ·- · -- - ·· · -- - - -· - -~ - t n - s L J t a t e c te _ q u 1 p _ e r r t
it
shalibefinrsh-paJntect--
t. III
Sk
ct
appl cati
sh
..'-- ..-~---"-"-...'..... .------,,----.---,' ------,-----...
fi
st
sh
by th
EP
contractor wtrere.requlred,
te te
fi
Ma te
ta
ca
19.2
fo me ta
includin
to
tems provided by sub-vendors.
sp cificati
vi
be
OAJOC
Inspection Authorit
re
to
ruct
me
ta sh
ts
plan.
appointe
Kuwait Oi Company.
th EPC contractor or his appointe
tor'
to
agen
to
_!1ificationof~atisfactor -
Igi tt
ce
a f te r d e li ve r y examination
21
AR
ON
IPME
LO
RM RE
AT
21. Documentation
shall
equipment
sea freight
packaged
carg
ta
rote
Ai! equipment supplied shal be in strict accordance with fo
te ra
KOC Standard/Drawing/Spec. Number 015-CH-1001 01 5-FH--1001 01S-JH- 903 015-JH-1909
th
sp cificati
fi ti
Title re sure
es el
nd ad endu ..
--
Genera In truments an ad endu In trumentation Fo Pa kage Eq ip en
an addend 1a
015-lH-1003
ip
15 01S·PH-1901 0IS-WH-1001
Electric Design
Installation For
O"lS-YH-1004 KOC-C-007
shutdown
Emergency addendum
Testin an ad endu Weldin Qu lity Re uire nt nd addendum eneral es ur Servic an dden um and (ESD) system requlrernente te
KOC-E-001 KOC-E-004 ..
--
KOC-E-OOe
KOC-E-02t1
ta ea
an
criteria
tKoe-rtec;OI'nll1OOdetl-nactrcele
te
OC Reco ende ra ti quip en an criteria
In
ti
For The
to
iJesign, -Seiectron1ind1IiStalla.tion te
For Electrical Installation
ti
KOC-G-004
KOC-I-004 KOC+011 KOC-P·OO1
te
Shutdown System ta an
criteria
tr
te
On Packaged
f-
KOC·P-OI?
er ic
015·CB·1013 015-MB-1001 OiS-MB-1002 01S-MB 00 015-MB-1004
1718-171-25-105.01 1718-171-25-105.02 1718-171-25-105.03 17iS-i1t-55-10S.01 17 8-171~55 105.02 1718·171-55-105.03 1718-171-55-105.04 1718-171-25-14 i.01 1718-171-25-1412.01 1718-171-25-1451.01 1718-171 -25-1452.01
riteri
Earthing Clip tandar adde Detail tandar an rail et il ta ta tandar teel tair Detail
Proiec Specification 1718-171-ZA·E-ZOOO1 718-171-ZA-E-ZOOO2 1718- 71-ZA·E·ZOOO3 "l718·171-ZA·E-ZOOO4 1718 171-GD E-G000 0022 1718-000-EA-E-EOOOi
an
to
l at f
Material Selectio Guid Specificatio fo Materi ls in ou er ic ic GeneralWeld~rements Piping Addendum to 01S-WH-100 ea an Material alan es Electrical System Descriptio
ro es
Flow Diagra
Narrativ
Ga
eh dr tion
Materia! Selectio Diagra Material el ctio Diagra Material el ctio Diagra Material el ctio Diagra P&ID bsor er Inle crubbe
ID
1718-171-25-1453.01 1718-171-25-1454.01
lyco Re cile lean Gl co
irculation
umps
la 1718-171-50-0001 1718-171-50-0020 718-171-50-0017 Philosophies 171S-171-GA-E-GOOO4 1718-171-GA- E-GOOO 1118-171-GA-E-GOOO7 lTf8-1T1~1\:e-GOOU~
171S-171-GA-E-G0103 171S-000-HA-E-HOOO3
P&I Philosoph Isolation Philosoph Bar
ano13fOwC!owrfPffifbsopl ta Proc ss an tility ipin!= layout an
Equipmen
Location S_[lscificatio