NO 1 A
B
C
D
E
URAIAN 2 BAHA BAHAN N AGR AGREG EGAT AT KASA KASAR R DAN DAN BAHA BAHAN N PER PEREK EKAT AT 1 Tanah urug 2 Pasir urug 3 Pasir pasang 4 Pasir beton Cimalaka 5 Batu belah pondasi 6 Batu pecah mesin 1/2 7 Batu pecah mesin 2/3 8 Batu pecah 3/5 9 Batu apung 10 semen tiga roda 11 Semen putih 12 Semen warna muda 13 Semen warna tua 14 Lem putih Fox
SAT
HARGA SATUAN ( Rp. )
3
4
m3 m3 m3 m3 m3 m3 m3 m3 Kg Kg Kg Kg Kg Kg
12,000.00 40,000.00 65,000.00 120,000.00 70,000.00 140,000.00 130,000.00 100,000.00 11,000.00 750.00 2,000.00 2,000.00 2,000.00 12,000.00
bh bh
250.00 2,500.00
BAHAN LOGAM DLL 1 Besi U-24 rata-rata uk. Dia 8 - 16 mm 2 Seng plat BJLS 28 (90 x 180 cm) 3 Besi strip uk. 3 x 30 mm x 6 m (4,21 kg) 4 Kawat beton 5 Paku 1/2" - 3" 6 Paku 3" - 5" 7 Paku 5" - 12" 8 Paku seng 9 Paku asbes 10 Allumunium Sheet 11 Gravel Beton 1/2 Dia 20 - 40 cm
Kg Lbr Kg Kg Kg Kg Kg Kg Kg m2 m'
7,000.00 45,000.00 5,000.00 10,000.00 10,000.00 10,000.00 8,000.00 13,000.00 15,000.00 6,000.00 22,500.00
BAHA BAHAN N PENG PENGUN UNCI CI/P /PEN ENGG GGAN ANTU TUNG NG,, KAC KACA A DLL DLL 1 Engsel pintu nylon besar 2 Engsel pintu nylon kecil 3 Engsel jendela biasa 4 Engsel angin 5 Grendel jendela (spring knip) 6 Grendel jendela biasa (slot) 7 Grendel tanam pintu ganda (espagnolet) 8 Hak angin stainles 9 Hak angin kait biasa 10 Slot pintu dan jendela 11 Kunci pintu cap kuda terbang type besar 12 Kunci pintu cap kuda terbang type kecil 13 Kunci pintu kamar mandi, ALPA 14 Kaca polos 3 mm 15 Kaca polos 5 mm 16 Kertas ampelas kayu tembok 17 Kape kayu 2" 18 Kape tembok 19 Kuas cat 3 - 4" 20 Rol cat 21 Bak mandi Fiber 22 Kloset jongkok, sek INA
psg psg psg psg bh bh bh bh bh bh bh bh bh m2 m2 lbr bh bh bh bh bh bh
10,000.00 8,000.00 7,500.00 3,500.00 10,000.00 5,000.00 15,000.00 6,000.00 2,500.00 4,500.00 90,000.00 75,000.00 65,000.00 42,500.00 55,000.00 2,000.00 2,000.00 1,500.00 3,500.00 6,000.00 75,000.00 500,000.00
m3 m3 m3 m3 m3 m3
300,000.00 410,000.00 2,000,000.00 2,000,000.00 2,100,000.00 2,800,000.00
BAHA BAHAN N PEN PENUTU UTUP DIND DINDIN ING G 1 Bata merah 2 Bata terawang/loster
BAHA BAHAN N KAYU KAYU/K /KAY AYU U LAPI LAPIS S DAN DAN PLAF PLAFON ON 1 Kayu balok albasiah 2 Kayu papan albasiah 3 Kayu balok borneo 4 Ka Kayu kaso borneo 5 Kayu papan borneo uk. 3/20 6 Kayu balok borneo super (maranti)
NO 1
F
G
H
URAIAN 2 7 Kayu papan borneo super (maranti) uk. 3/20 8 Kayu papan borneo super (maranti) uk. 3/30 9 Ka Kayu balok kamper banjar 10 Kayu papan kamper banjar uk. 3/20 11 Kayu papan kamper banjar uk. 3/30 12 Kayu balok kamper samarinda 13 Kayu papan kamper samarinda 3/20 14 Reng 2/3 kayu borneo super maranti 15 Reng 3/4 kayu borneo super maranti 16 Kayu dolken dia 8 - 10 cm 17 Bambu dia 5 - 7 cm 18 Bambu dia 7 - 10 cm 19 Triplek 3 mm 1,20 x 2,40 m 20 Triplek 4 mm 21 Multiplek 9 mm 1,20 x 2,40 m 22 Multiplek 12 mm 1,20 x 2,40 m 23 Multiplek 15 mm 1,20 x 2,40 m 24 Multiplek 18 mm 1,20 x 2,40 m 25 Teakwood 4 mm 1,20 x 2,40 m 26 Milamin 4 mm 1,20 x 2,40 m 27 Eternit biasa 28 Eternit cap bola dunia 29 Eternit cap dua gajah 30 Eternit cap Hardflek 5 mm uk 1,05 x 1,80 m 31 Eternit cap Hardflek 5 mm uk 1,05 x 2,40 m 32 Eternit Triplek 4 mm, 1,00 x 1,00 x 4,0 mm 33 List profil 2x2 cm 34 List profil 1x3 cm 35 List kayu 1x4 cm 36 List kayu 1x5 cm 37 List kayu 2x4 cm BAHAN PE PENUTUP AT ATAP 1 Genteng kodok natural ek. Jati wangi 2 Genteng palentong natural ek. Jati wangi 3 Ge Genteng bubung segitiga/bulat natural 4 Genteng bubung palentong besar natural 5 Asbes Gelombang 6 Bubung Asbes gelombang
SAT 3 m3 m3 m3 m3 m3 m3 m3 btg btg btg btg btg lbr lbr lbr lbr lbr lbr lbr lbr lbr lbr lbr lbr lbr lbr m' m' m' m' m'
HARGA SATUAN ( Rp. ) 4 2,500,000.00 2,500,000.00 4,500,000.00 4,500,000.00 4,600,000.00 4,000,000.00 4,000,000.00 6,750.00 13,500.00 17,500.00 10,000.00 15,000.00 42,500.00 60,000.00 120,000.00 135,000.00 150,000.00 180,000.00 120,000.00 62,500.00 2,500.00 5,000.00 7,500.00 75,000.00 150,000.00 11,500.00 3,500.00 2,000.00 2,500.00 3,000.00 3,500.00
bh bh bh bh lbr bh
1,000.00 850.00 2,000.00 2,000.00 37,500.00 7,500.00
BAHAN PE PENUTUP LA LANTAI 1 Keramik lantai wc 20/20 polos, sek Mulia 2 Keramik lantai wc 20/20 corak warna, sek Mulia 3 Keramik dinding 20/25 polos, sek Mulia 4 Keramik dinding 20/25 corak warna, sek Mulia 5 Kramik lantai 30/30 putih polos sek Mulia 6 Kramik lantai 30/30 Warna sek Mulia 7 Paving block natural tinggi 6 cm 8 Paving block warna tinggi 6 cm 9 Paving block natural tinggi 8 cm 10 Paving block warna tinggi 8 cm 11 Marmer
m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
37,500.00 42,500.00 35,000.00 37,500.00 31,000.00 34,000.00 23,000.00 25,000.00 27,500.00 30,000.00 250,000.00
BAHA BAHAN N ALA ALATT-AL ALAT AT LIST LISTR RIK 1 Kabel NYM 3 x 2,5, sek Prima 2 Solatif kabel 3 Pipa listrik 4 T-Dus 5 Inbow Dus 6 Lampu TL Phillips 5 - 25 Watt 7 Lampu pijar Phillip 5 - 25 Watt 8 Lampu pijar Phillip 40 - 80 Watt 9 Stop kontak, sek Broco 10 Saklar tunggal, sek Broco 11 Saklar ganda, sek Broco 12 Pitting ;ampu, sek Broco
m' roll lt bh bh bh bh bh bh bh bh bh
4,500.00 2,500.00 3,000.00 500.00 1,000.00 25,000.00 5,000.00 7,500.00 7,500.00 7,500.00 10,000.00 5,000.00
NO
URAIAN
SAT
HARGA SATUAN ( Rp. )
1 I
2
3
4
J
ALAT-ALAT SA SANITASI AI AIR 1 Pipa PVC 1/2" 2 Pipa PVC 1,5" 3 PIPA PVC 3" 4 Pipa PVC 4" 5 Soket 4" 6 Injuk BAHAN FI FINISHING 1 Cat dasar tembok, indo 9000 sealer water base 2 Cat kayu sek SEIV 3 Cat dasr kayu 4 Meni kayu besi Bola Mas 5 Plincoat 6 Cat tembok, sek SANLEK 7 Dempul tembok (plamur Sanlek) 8 Dempul kayu cap Kucing 9 Thiner (minyak cat) 10 Solignem (a blek 10 ltr) 11 Spirtus 12 Minyak tanah/solar 13 Politur 14 Plitur jadi Ultran 15 Kertas ampelas kayu-tembok 16 Kape kayu 2" 17 Kape tembok 18 Kuas 3-4" 19 Roll cat
m' m' m' m' bh kg
3,000.00 2,000.00 15,000.00 20,000.00 4,000.00 3,000.00
Kg Kg ltr Kg ltr kg Kg Kg ltr ltr ltr ltr ltr ltr lbr bh bh bh bh
7,000.00 28,000.00 5,000.00 12,500.00 10,000.00 10,000.00 17,500.00 12,000.00 12,500.00 2,500.00 3,500.00 4,500.00 8,500.00 22,000.00 2,000.00 2,500.00 2,500.00 3,500.00 6,000.00
DAFTAR HARGA SATUAN UPAH 0 0 0
NO. 1 1 2 3 4 5 6 7 8 9 10 11 12
Pekerja Tukang batu / tukang kayu Tukang besi profil / tukang las Tukang besi beton Tukang cat Tukang gali Kepala tukang batu / kayu Kepala tukang besi profil / las Kepala tukang besi beton Kepala tukang cat Kepala tukang gali Mandor
URAIAN
SAT
2
3 Org/hr Org/hr Org/hr Org/hr Org/hr Org/hr Org/hr Org/hr Org/hr Org/hr Org/hr Org/hr
HARGA DASAR ( Rp. ) 4 25,000.00 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 40,000.00
ANALISA HARGA SATUAN PEKERJAAN PEMBANGUNAN RUMAH SATU LANTAI TYPE II
HARGA SATUAN NO.
URAIAN
1 1
2
SAT.
JUMLAH HARGA
JUMLAH HARGA
KO KOEF. BAHAN / UPAH ( Rp. )
BAHAN ( Rp. )
UPAH ( Rp. )
BAHAN + UPAH ( Rp. )
7
8
3
4
5
6
lot
0.5000
1,000.00
500.00
1M2 1M2 PEK PEKER ERJA JAAN AN PENG PENGUK UKUR URAN AN SITE SITE Bahan : Peralatan Tenaga : Pekerja
Oh
0.0200
25,000.00
500.00
Tukang
Oh
0.0100
30,000.00
300.00
Jumlah
500.00
800.00
Keuntungan Maksimal 10 %
2
1,300.00 130.00
Jumlah
1,430.00
Dibuilatkan
1,430.00
1M3 1M3 PEK PEKER ERJAA JAAN N STR STRIP IPPI PING NG SEDA SEDALA LAM M 0,1 0,1 M Tenaga Pekerja
Oh
0.0500
25,000.00
Mandor
Oh
0.0050
40,000.00
1,250.00 200.00
Jumlah
1,450.00
Keuntungan Maksimal 10 %
4
1,450.00 145.00
Jumlah
1,595.00
Dibuilatkan
1,590.00
1M2 1M2 PEMB PEMBER ERSI SIHA HAN N LAPA LAPANG NGAN AN DAN DAN PER PERAT ATAA AAN N Tenaga : Pekerja
Oh
0.1000
25,000.00
2,500.00
Mandor
Oh
0.0500
40,000.00
2,000.00
Jumlah
4,500.00
Keuntungan Maksimal 10 %
5
4,500.00 450.00
Jumlah
4,950.00
Dibuilatkan
4,950.00
1M' 1M' PAS PASAN ANGA GAN N BOU BOUWP WPLA LAN NK Bahan : Kayu papan 3/20
m3
0.0070
410,000.00
2,870.00
Kayu kaso albasiah
m3
0.0120
300,000.00
3,600.00
P ak ak u 2" - 5"
kg
0.0200
8,000.00
160.00
Tenaga : Tukang kayu
oh
0.1000
30,000.00
3,000.00
Pekerja
oh
0.1000
25,000.00
2,500.00
Kepala tukang kayu
oh
0.0100
35,000.00
350.00
Mandor
oh
0.0050
40,000.00
Jumlah
200.00 6,630.00
6,050.00
Keuntungan Maksimal 10 %
1,268.00
Jumlah
13,948.00
Dibuilatkan
13,940.00
HARGA SATUAN NO.
URAIAN
1 6
12,680.00
2
SAT.
JUMLAH HARGA
JUMLAH HARGA
KO KOEF.
3
4
oh
0.4000
BAHAN / UPAH ( Rp. )
BAHAN ( Rp. )
UPAH ( Rp. )
BAHAN + UPAH ( Rp. )
5
6
7
8
1M3 1M3 GAL GALIAN IAN TANA TANAH H BIAS BIASA A KED KEDAL ALAM AMAN AN 1 M Tenaga : Pek er erj a
25,000.00
10,000.00
HARGA SATUAN NO.
URAIAN
1 6
2
SAT.
3
JUMLAH HARGA
JUMLAH HARGA
KO KOEF.
4
BAHAN / UPAH ( Rp. )
BAHAN ( Rp. )
UPAH ( Rp. )
BAHAN + UPAH ( Rp. )
5
6
7
8
1M3 1M3 GAL GALIAN IAN TANA TANAH H BIAS BIASA A KED KEDAL ALAM AMAN AN 1 M Tenaga : Pek er erj a
oh
0.4000
25,000.00
10,000.00
Mandor
oh
0.0400
40,000.00
1,600.00
Alat Bantu
ls
1.0000
2,500.00
2,500.00
Jumlah
14,100.00
Keuntungan Maksimal 10 %
7
14,100.00 1,410.00
Jumlah
15,510.00
Dibuilatkan
15,510.00
1M3 1M3 GAL GALIAN IAN TANA TANAH H BIAS BIASA A KED KEDAL ALAM AMAN AN 2 M Tenaga : Pek er erj a
oh
0.5260
25,000.00
13,150.00
Mandor
oh
0.0520
40,000.00
2,080.00
Alat Bantu
ls
1.0000
2,500.00
2,500.00
Jumlah
17,730.00
Keuntungan Maksimal 10 %
10
17,730.00 1,773.00
Jumlah
19,503.00
Dibuilatkan
19,500.00
1M3 1M3 URU URUGA GAN N TAN TANAH AH KEMB KEMBAL ALII Tenaga : Pek er erj a
oh
0.1900
25,000.00
4,750.00
Mandor
oh
0.0200
40,000.00
800.00
Alat Bantu[
ls
1.0000
500.00
500.00
Jumlah
6,050.00
Keuntungan Maksimal 10 %
11
6,050.00 605.00
Jumlah
6,655.00
Dibuilatkan
6,650.00
1M3 URU URUGAN GAN PASI PASIR R Bahan : Pasir urug
m3
1.2000
40,000.00
48,000.00
Tenaga : Pekerja
oh
0.1500
25,000.00
3,750.00
Mandor
oh
0.0100
40,000.00
400.00
Alat Bantu
ls
1.0000
2,000.00
Jumlah
48,000.00
4,150.00
Keuntungan Maksimal 10 %
12
52,150.00 5,215.00
Jumlah
57,365.00
Dibuilatkan
57,360.00
1M3 PASANG PASANGAN AN PONDA PONDASI SI BATU BATU KOSO KOSONG NG AANS AANSTAM TAMPIN PING G Bahan : Batu belah 15 - 20 cm
m3
1.2000
70,000.00
84,000.00
Pasir urug
m3
0.4000
40,000.00
16,000.00
Tenaga : Pekerja
oh
0.5000
25,000.00
12,500.00
Tukang batu
oh
0.5620
30,000.00
16,860.00
Kepala tukang batu
oh
0.0750
35,000.00
2,625.00
Mandor
oh
0.0560
40,000.00
Jumlah
2,240.00 100,000.00
34,225.00
Keuntungan Maksimal 10 %
13
134,225.00 13,422.50
Jumlah
147,647.50
Dibuilatkan
147,640.00
1M3 PASANG PASANGAN AN POND PONDASI ASI BATU BATU KALI KALI 1 PC : 5 PS Bahan : Batu belah 15 - 20 cm
m3
1.2000
70,000.00
84,000.00
Semen portland
kg
136.0000
750.00
102,000.00
Pasir pasang
m3
0.5440
65,000.00
35,360.00
Tenaga : Pekerja
oh
1.5000
25,000.00
37,500.00
Tukang batu
oh
0.6000
30,000.00
18,000.00
Kepala tukang batu
oh
0.0600
35,000.00
2,100.00
Mandor
oh
0.0750
40,000.00
Jumlah
3,000.00 221,360.00
60,600.00
Keuntungan Maksimal 10 %
14
281,960.00 28,196.00
Jumlah
310,156.00
Dibuilatkan
310,150.00
1M2 1M2 PASAN PASANGA GAN N BATA BATA TRAS TRASRA RAAM AM 1 PS : 3 PS Bahan :
Bata merah KW II
bh
80.0000
250.00
20,000.00
PC
kg
26.5000
750.00
19,875.00
Pasir pasang
m3
0.0465
65,000.00
3,022.50
Tenaga : Peke Pekerrja
org
0.48 0.4800 00
25,0 25,000 00.0 .00 0
12,0 12,00 00.00 .00
Tukang batu
org
0.1600
30,000.00
4,800.00
Kepala tukang batu
org
0.0160
35,000.00
560.00
Mandor
org
0.0480
40,000.00
1,920.00
Jumlah
42,897.50
19,280.00
62,177.50
Bata merah KW II
bh
80.0000
250.00
20,000.00
PC
kg
26.5000
750.00
19,875.00
Pasir pasang
m3
0.0465
65,000.00
3,022.50
Tenaga : Peke Pekerrja
org
0.48 0.4800 00
25,0 25,000 00.0 .00 0
12,0 12,00 00.00 .00
Tukang batu
org
0.1600
30,000.00
4,800.00
Kepala tukang batu
org
0.0160
35,000.00
560.00
Mandor
org
0.0480
40,000.00
1,920.00
Jumlah
42,897.50
19,280.00
Keuntungan Maksimal 10 %
15
62,177.50 6,217.75
Jumlah
68,395.25
Dibuilatkan
68,390.00
1M2 PASANGA PASANGAN N BATA BATA MERAH MERAH TEBAL TEBAL 1/2 BATA BATA 1PC : 3 PS Bahan : Bata merah
m3
70.0000
250.00
17,500.00
Semen portland
kg
21.0000
750.00
15,750.00
Pasir pasang
m3
0.0500
65,000.00
3,250.00
Tenaga : Pekerja
oh
0.4300
25,000.00
10,750.00
Tukang batu
oh
0.2100
30,000.00
6,300.00
Kepala tukang batu
oh
0.0200
35,000.00
700.00
Mandor
oh
0.0100
40,000.00
Jumlah
400.00 36,500.00
18,150.00
Keuntungan Maksimal 10 %
16
54,650.00 5,465.00
Jumlah
60,115.00
Dibuilatkan
60,110.00
1M2 PASANGA PASANGAN N BATA BATA MERAH MERAH TEBAL TEBAL 1/2 BATA BATA 1PC : 5 PS Bahan : m3
70.0000
Semen portland
kg
Pasir pasang
m3
Bata merah
250.00
17,500.00
10.5000
750.00
7,875.00
0.0600
65,000.00
3,900.00
Tenaga : Pekerja
oh
0.3200
25,000.00
8,000.00
Tukang batu
oh
0.1800
30,000.00
5,400.00
Kepala tukang batu
oh
0.0200
35,000.00
700.00
Mandor
oh
0.0100
40,000.00
Jumlah
400.00 29,275.00
14,500.00
Keuntungan Maksimal 10 %
17
s
43,775.00 4,377.50
Jumlah
48,152.50
Dibuilatkan
48,150.00
1M2 1M2 PLE PLEST STER ERAN AN DIND DINDIN ING G + ACIA ACIAN N 1: 2 Bahan : PC
kg
15.0000
750.00
11,250.00
Pasir pasang
m3
0.0200
65,000.00
1,300.00
Tenaga : Peke Pekerrja
org
0.29 0.2900 00
25,0 25,000 00.0 .00 0
7,25 ,250.00 .00
Tukang batu
org
0.2100
30,000.00
6,300.00
Kepala tukang batu
org
0.0200
35,000.00
700.00
Mandor
org
0.0200
40,000.00
Jumlah
800.00 12,550.00
15,050.00
Keuntungan Maksimal 10 %
2,760.00
Jumlah
30,360.00
Dibuilatkan
30,360.00
HARGA SATUAN NO.
URAIAN
1 18
27,600.00
2
SAT.
JUMLAH HARGA
KOEF.
3
4
kg
8.0000
BAHAN / UPAH ( Rp. )
BAHAN ( Rp. )
UPAH ( Rp. )
BAHAN + UPAH ( Rp. )
5
6
7
8
1M2 1M2 PLEST PLESTER ERAN AN DIN DINDI DING NG + ACIA ACIAN N1:3 Bahan : Semen portland
JUMLAH HARGA
750.00
6,000.00
HARGA SATUAN NO.
URAIAN
1 18
2
SAT.
JUMLAH HARGA
JUMLAH HARGA
KOEF. BAHAN / UPAH ( Rp. )
BAHAN ( Rp. )
UPAH ( Rp. )
BAHAN + UPAH ( Rp. )
5
6
7
8
3
4
Semen portland
kg
8.0000
750.00
6,000.00
Pasir pasang
m3
0.0200
65,000.00
1,300.00
1M2 1M2 PLEST PLESTER ERAN AN DIN DINDI DING NG + ACIA ACIAN N1:3 Bahan :
Tenaga : Peke Pekerj rja a
oh
0.29 0.2900 00
25,0 25,000 00.0 .00 0
25,0 25,000 00.0 .00 0
7,25 7,250. 0.00 00
Tukang batu
oh
0.2100
30,000.00
30,000.00
6,300.00
Kepala tukang batu
oh
0.0200
35,000.00
35,000.00
700.00
Mandor
oh
0.0200
40,000.00
40,000.00
Jumlah
137,300.00
800.00 15,050.00
Keuntungan Maksimal 10 %
19
152,350.00 15,235.00
Jumlah
167,585.00
Dibuilatkan
167,580.00
1M2 1M2 PLEST PLESTER ERAN AN DIN DINDI DING NG + ACIA ACIAN N1:5 Bahan : Semen portland
kg
5.0000
750.00
3,750.00
Pasir pasang
m3
0.0200
65,000.00
1,300.00
Tenaga : Pek er erj a
oh
0.2900
25,000.00
7,250.00
Tukang batu
oh
0.2100
30,000.00
6,300.00
Kepala tukang batu
oh
0.0200
35,000.00
700.00
Mandor
oh
0.0200
40,000.00
Jumlah
800.00 5,050.00
15,050.00
Keuntungan Maksimal 10 %
20
20,100.00 2,010.00
Jumlah
22,110.00
Dibuilatkan
22,110.00
1M2 FIN FINIS ISH HING ING ACIA ACIAN N Bahan : Semen portland
kg
4.0000
750.00
3,000.00
Tenaga : Pek er erj a
oh
0.1400
25,000.00
3,500.00
Tukang batu
oh
0.1100
30,000.00
3,300.00
Kepala tukang batu
oh
0.0100
35,000.00
350.00
Mandor
oh
0.0100
40,000.00
Jumlah
400.00 3,000.00
7,550.00
Keuntungan Maksimal 10 %
21
10,550.00 1,055.00
Jumlah
11,605.00
Dibuilatkan
11,600.00
1M2 1M2 PLEST PLESTER ERAN AN BET BETON ON 1PC 1PC : 3 PS T = 15 MM MM Bahan : Semen portland
kg
7.0700
750.00
5,302.50
Pasir pasang
m3
0.0210
65,000.00
1,365.00
Tenaga : Pek er erj a
oh
0.2600
25,000.00
6,500.00
Tukang batu
oh
0.2000
30,000.00
6,000.00
Kepala tukang batu
oh
0.0200
35,000.00
700.00
Mandor
oh
0.0130
40,000.00
Jumlah
520.00 6,667.50
13,720.00
Keuntungan Maksimal 10 %
22
20,387.50 2,038.75
Jumlah
22,426.25
Dibuilatkan
22,420.00
1M3 PASANG PASANGAN AN KUSEN KUSEN PINT PINTU U / JENDEL JENDELA A KAYU KAYU SAMARI SAMARINDA NDA Bahan : Kayu balok kamper samarinda
m3
1.1000
4,000,000.00
Pak u
kg
1.2500
8,000.00
10,000.00
Lem Fox
kg
1.0000
12,000.00
12,000.00
4,400,000.00
Tenaga : Peke Pekerj rja a
oh
4.0 4.0000 000
25,0 25,00 00.00 .00
100,0 00,00 00.00 .00
Tukang kayu
oh
15.5000
30,000.00
465,000.00
Kepala tukang kayu
oh
2.7000
35,000.00
94,500.00
Mandor
oh
0.5000
40,000.00
Jumlah
20,000.00 4,422,000.00
679,500.00
Keuntungan Maksimal 10 %
23
5,101,500.00 510,150.00
Jumlah
5,611,650.00
Dibuilatkan
5,611,650.00
1M3 PASAN PASANGAN GAN KUSE KUSEN N PINTU PINTU / JENDEL JENDELA A KAYU KAMPE KAMPER R SAMARIN SAMARINDA DA Bahan : Kayu balok kamper samarinda
m3
1.1000
4,000,000.00
Paku
kg
1.2500
8,000.00
10,000.00
Lem Fox
kg
1.0000
12,000.00
12,000.00
oh
4.00 4.0000 00
25,0 25,000 00.0 .00 0
4,400,000.00
Tenaga : Peke Pekerrja
100,0 00,00 00.00 .00
23
1M3 PASAN PASANGAN GAN KUSE KUSEN N PINTU PINTU / JENDEL JENDELA A KAYU KAMPE KAMPER R SAMARIN SAMARINDA DA Bahan : Kayu balok kamper samarinda
m3
1.1000
4,000,000.00
Paku
kg
1.2500
8,000.00
10,000.00
Lem Fox
kg
1.0000
12,000.00
12,000.00
4,400,000.00
Tenaga : Peke Pekerrja
oh
4.00 4.0000 00
25,0 25,000 00.0 .00 0
100,0 00,00 00.00 .00
Tukang kayu
oh
15.5000
30,000.00
465,000.00
Kepala tukang kayu
oh
2.7000
35,000.00
94,500.00
Mandor
oh
0.5000
40,000.00
Jumlah
20,000.00 4,422,000.00
679,500.00
Keuntungan Maksimal 10 %
24
5,101,500.00 5,101,500.00 510,150.00
Jumlah
5,611,650.00
Dibuilatkan
5,611,650.00
1M2 PASANGA PASANGAN N PINT PINTU U PANE PANEL L KAYU KAYU SAMARIN SAMARINDA DA Bahan : Kayu Borneo, papan
m3
0.0400
4,000,000.00 4,000,000.00
160,000.00
Tenaga : Pekerj a
oh
1.0000
25,000.00
25,000.00
Tukang kayu
oh
2.5000
30,000.00
75,000.00
Kepala tukang kayu
oh
0.2500
35,000.00
8,750.00
Mandor
oh
0.0500
40,000.00
Jumlah
2,000.00 160,000.00
110,750.00
Keuntungan Maksimal 10 %
25
270,750.00 27,075.00
Jumlah
297,825.00
Dibuilatkan
297,820.00
1M2 PASAN PASANGAN GAN DAUN DAUN PINT PINTU U TEAK TEAK WOOD WOOD 4 MM RANGKA RANGKA KY. KY. SAMARIN SAMARINDA DA Bahan : Rangka kayu SAMARINDA
m3
0.0500
4,000,000.00
200,000.00
Teak Wood 4 mm
l br
0.6940
120,000.00
83,280.00
Lem Putih Fox
kg
0.7500
12,000.00
9,000.00
Paku
kg
0.1000
8,000.00
800.00
Tenaga : Pekerj a
oh
0.6000
25,000.00
15,000.00
Tukang kayu
oh
2.6000
30,000.00
78,000.00
Kepala tukang kayu
oh
0.2600
35,000.00
9,100.00
Mandor
oh
0.0260
40,000.00
Jumlah
1,040.00 293,080.00
103,140.00
Keuntungan Maksimal 10 %
26
396,220.00 39,622.00
Jumlah
435,842.00
Dibuilatkan
435,840.00
1M2 PASANGA PASANGAN N DAUN DAUN JEND JENDELA ELA KACA KAYU KAYU SAMAR SAMARIND INDA A Bahan : Kayu Borneo, papan
m3
0.0200
4,000,000.00 4,000,000.00
80,000.00
Lem Putih Fox
kg
0.3000
12,000.00
3,600.00
Tenaga : Pekerj a
oh
0.3000
25,000.00
7,500.00
Tukang kayu
oh
1.2000
30,000.00
36,000.00
Kepala tukang kayu
oh
0.1200
35,000.00
4,200.00
Mandor
oh
0.0200
40,000.00
Jumlah
800.00 83,600.00
48,500.00
Keuntungan Maksimal 10 %
27
132,100.00 13,210.00
Jumlah
145,310.00
Dibuilatkan
145,310.00
1M' PASAN PASANGAN GAN PAPAN PAPAN JALUSI JALUSI KAYU KAYU BOR BORNEO NEO SUPE SUPER R 1,5/1 1,5/12 2 Bahan : Kayu Borneo Super, papan
m3
0.0023
2,500,000.00 2,500,000.00
5,775.00
Paku
kg
0.0100
8,000.00
80.00
Tenaga : Pekerj a
oh
0.0500
25,000.00
1,250.00
Tukang kayu
oh
0.1500
30,000.00
4,500.00
Kepala tukang kayu
oh
0.0150
35,000.00
525.00
Mandor
oh
0.0040
40,000.00
Jumlah
160.00 5,855.00
6,435.00
Keuntungan Maksimal 10 %
28
12,290.00 1,229.00
Jumlah
13,519.00
Dibuilatkan
13,510.00
1M2 1M2 PASAN PASANGA GAN N KAC KACA A TEBAL TEBAL 3 MM MM + List List Bahan : Kaca tebal 3 mm
m2
1.0000
42,500.00
42,500.00
List Kayu 1 cm
m1
3.9000
2,000.00
7,800.00
Paku kaca
kg
0.0200
10 10,000.00
200.00
Tenaga : Pekerj a
oh
0.1500
25,000.00
3,750.00
Tukang kayu
oh
0.1500
30,000.00
4,500.00
Jumlah
50,500.00
Keuntungan Maksimal 10 %
29
8,250.00
58,750.00 5,875.00
Jumlah
64,625.00
Dibuilatkan
64,620.00
1M2 1M2 PASA PASANG NGAN AN KACA KACA TEBA TEBAL L 5 MM MM + List List Bahan : Kaca tebal 5 mm
m2
1.0000
55,000.00
55,000.00
List Kayu 1 cm
m1
3.9000
2,000.00
7,800.00
Paku kaca
kg
0 0200
10 1 0 000 00
200 00
Jumlah
50,500.00
8,250.00
Keuntungan Maksimal 10 %
29
58,750.00 5,875.00
Jumlah
64,625.00
Dibuilatkan
64,620.00
1M2 1M2 PASA PASANG NGAN AN KACA KACA TEBA TEBAL L 5 MM MM + List List Bahan : Kaca tebal 5 mm
m2
1.0000
55,000.00
55,000.00
List Kayu 1 cm
m1
3.9000
2,000.00
7,800.00
Paku kaca
kg
0.0200
10 1 0,000.00
200.00
Tenaga : Pekerj a
oh
0.1500
25,000.00
3,750.00
Tukang kayu
oh
0.1500
30,000.00
4,500.00
Jumlah
63,000.00
8,250.00
Keuntungan Maksimal 10 %
30
71,250.00 7,125.00
Jumlah
78,375.00
Dibuilatkan
78,370.00
1M1 PASANGA PASANGAN N BUBU BUBUNG NG GENTEN GENTENG G PALE PALENTO NTONG NG Bahan : Genteng bubung palentong
bh
4.0000
2,000.00
Semen portland
kg
6.5000
750.00
4,875.00
Pasir pasang
m3
0.2100
65,000.00
13,650.00
ls
1.0000
500.00
500.00
oh
0.1500
25,000.00
3,750.00
Peralatan
8,000.00
Tenaga : Pekerj a Tukang batu
oh
0.2000
30,000.00
6,000.00
Kepala tukang batu
oh
0.0100
35,000.00
350.00
Mandor
oh
0.0100
40,000.00
Jumlah
400.00 27,025.00
10,500.00
Keuntungan Maksimal 10 %
31
37,525.00 3,752.50
Jumlah
41,277.50
Dibuilatkan
41,270.00
1M2 PASANGAN PASANGAN RANGKA RANGKA LANGIT LANGIT - LANGIT LANGIT ( GRID GRID 50 50 X 100 100 ) KAYU KAYU albasiah albasiah Bahan : Kayu Kayu kaso kaso alba albasi siah ah 5/7 5/7
m3
0.02 0.0270 70
300, 300,00 000. 0.00 00
8,10 8,100. 0.00 00
Paku 5 - 10 cm
kg
0.1800
8,000.00
1,440.00
Tenaga : Pekerja
org
0.2100
25,000.00
5,250.00
Tukang kayu
org
0.3500
30,000.00
10,500.00
Kepala Tukang kayu
org
0.0350
35,000.00
1,225.00
Mandor
org
0.0110
40,000.00
Jumlah
440.00 9,540.00
17,415.00
Keuntungan Maksimal 10 %
32
26,955.00 2,695.50
Jumlah
29,650.50
Dibuilatkan
29,650.00
1M2 PASANGA PASANGAN N PLAF PLAFOND OND GYPSU GYPSUM M ( PABRIKA PABRIKASI SI ) Bahan + Upah GYPSUM
m2
1.0000
21,500.00
Jumlah
21,500.00 21,500.00
21,500.00
Keuntungan Maksimal 10 %
33
2,150.00
Jumlah
23,650.00
Dibuilatkan
23,650.00
1M1 PASANGA PASANGAN N LIST LIST PLANK PLANK (3X (3X30 30 CM), CM), KAYU KAYU BORNEO BORNEO Bahan : Kayu papan borneo
m3
0.0100
410,000.00
4,100.00
Paku biasa 2-5"
kg
0.0500
10,000.00
500.00
Tenaga : Pekerja
oh
0.0700
25,000.00
1,750.00
Tukang kayu
oh
0.2000
30,000.00
6,000.00
Kepala tukang kayu
oh
0.0200
35,000.00
700.00
Mandor
oh
0.0040
40,000.00
Jumlah
160.00 4,600.00
8,610.00
Keuntungan Maksimal 10 %
34
13,210.00 1,321.00
Jumlah
14,531.00
Dibuilatkan
14,530.00
1M1 PEKERJA PEKERJAAN AN PAPAN PAPAN RUIT RUITER ER 2/20 2/20,, KAYU KAYU BORN BORNEO EO Bahan : Kayu borneo, papan
m3
0.0040
410,000.00
1,640.00
Paku biasa 2-5"
kg
0.0600
10,000.00
600.00
Tenaga : Pekerja
oh
0.1000
25,000.00
2,500.00
Tukang kayu
oh
0.1000
30,000.00
3,000.00
Kepala tukang kayu
oh
0.0100
35,000.00
350.00
Mandor
oh
0.0500
40,000.00
2,000.00
Jumlah Keuntungan Maksimal 10 %
2,240.00
7,850.00
10,090.00 1,009.00
Jumlah
11,099.00
Dibuilatkan
11,090.00
HARGA SATUAN NO.
URAIAN
1 35
2
SAT.
3
JUMLAH HARGA
KO KOEF.
4
BAHAN / UPAH ( Rp. )
BAHAN ( Rp. )
UPAH ( Rp. )
BAHAN + UPAH ( Rp. )
5
6
7
8
1M1 PEKER PEKERJAAN JAAN PAPAN PAPAN RUITE RUITER R 2/20, 2/20, KAYU KAYU BORN BORNEO EO SUPER SUPER Bahan : Kayu borneo super, papan
m3
JUMLAH HARGA
0.0040
2,500,000.00
10,000.00
HARGA SATUAN NO.
URAIAN
1 35
2
SAT.
3
JUMLAH HARGA
JUMLAH HARGA
KO KOEF.
4
BAHAN / UPAH ( Rp. )
BAHAN ( Rp. )
UPAH ( Rp. )
BAHAN + UPAH ( Rp. )
5
6
7
8
1M1 PEKER PEKERJAAN JAAN PAPAN PAPAN RUITE RUITER R 2/20, 2/20, KAYU KAYU BORN BORNEO EO SUPER SUPER Bahan : Kayu borneo super, papan
m3
0.0040
2,500,000.00
10,000.00
Paku biasa 2-5"
kg
0.0600
10,000.00
600.00
Tenaga : Pekerja
oh
0.1000
25,000.00
2,500.00
Tukang kayu
oh
0.1000
30,000.00
3,000.00
Kepala tukang kayu
oh
0.0100
35,000.00
350.00
Mandor
oh
0.0500
40,000.00
2,000.00
Jumlah
10,600.00
7,850.00
Keuntungan Maksimal 10 %
36
18,450.00 1,845.00
Jumlah
20,295.00
Dibuilatkan
20,290.00
1M1 1M1 PEKER PEKERJAA JAAN N TALA TALANG NG DATA DATAR R BJLS BJLS 28 28 Bahan : Seng plat 3 x 6 BJLS 28
lbr
0.5000
45,000.00
Paku biasa 1/2-1"
kg
0.0150
10,000.00
22,500.00 150.00
Kayu Kayu Born Borneo eo,, papa papan n
m3
0.00 0.0096 96
2,10 2,100, 0,00 000. 0.00 00
20,1 20,160 60.0 .00 0
Tenaga : Pekerja
oh
0.1500
25,000.00
3,750.00
Tukang kayu
oh
0.4000
30,000.00
12,000.00
Kepala tukang kayu
oh
0.0250
35,000.00
875.00
Mandor
oh
0.0070
40,000.00
Jumlah
280.00 42,810.00
16,905.00
Keuntungan Maksimal 10 %
37
59,715.00 5,971.50
Jumlah
65,686.50
Dibuilatkan
65,680.00
1BH 1BH PAS PASAN ANG G BAK BAK FIB FIBER ER GLA GLASS SS Bahan : Bata merah
bh
1.0000
250.00
250.00
Bak Fiber glass
bh
1.0000
75,000.00
75,000.00
Semen PC
kg
8. 8 .0000
750.00
6,000.00
Pasir pasang
m3
0.2500
65,000.00
16,250.00
Keramik 20/20
m2
1.1000
42,500.00
46,750.00
Tenaga : Pekerja
org
0.2500
25,000.00
Tukan ukang g batu batu
org
0.01 0.0130 30
30,0 0,000.0 0.00
390.0 90.00 0
Kepala tukang batu
org
0.0250
35,000.00
875.00
Mandor
org
0.0030
40,000.00
Jumlah
6,250.00
120.00 144,250.00
7,635.00
Keuntungan Maksimal 10 %
38
151,885.00 15,188.50
Jumlah
167,073.50
Dibuilatkan
167,070.00
1BH 1BH PASAN PASANG G KLOS KLOSET ET JONG JONGKO KOK K Bahan : Kloset jongkok sek. INA
bh
1.0000
600,000.00
Semen PC
kg
5. 5 .5000
750.00
600,000.00 4,125.00
Pasir pasang
m2
0.0900
65,000.00
5,850.00
Tenaga : Pekerja
org
0.0130
25,000.00
325.00
Tukang batu
org
0.2500
30,000.00
7,500.00
Kepala tukang
org
0.0250
35,000.00
875.00
Mandor
org
0.0030
40,000.00
Jumlah
120.00 609,975.00
8,820.00
Keuntungan Maksimal 10 %
39
618,795.00 61,879.50
Jumlah
680,674.50
Dibuilatkan
680,670.00
1BH 1BH PAS PASAN ANG G ENG ENGSE SEL L PIN PINTU TU Bahan : Engsel pintu
bh
1.0000
8,000.00
oh
0.1500
30,000.00
8,000.00
Tenaga : Tukang kayu Jumlah
4,500.00 8,000.00
4,500.00
Keuntungan Maksimal 10 %
1,250.00
Jumlah
13,750.00
Dibuilatkan
13,750.00
HARGA SATUAN NO.
URAIAN
1 40
12,500.00
2
SAT.
JUMLAH HARGA
KO KOEF. BAHAN / UPAH ( Rp. )
BAHAN ( Rp. )
UPAH ( Rp. )
BAHAN + UPAH ( Rp. )
6
7
8
3
4
5
bh
1.0000
7,500.00
1BH PASANG PASANG ENGSEL ENGSEL JENDEL JENDELA A KUPU KUPU - KUPU KUPU Bahan : Engsel jendela
JUMLAH HARGA
7,500.00
HARGA SATUAN NO.
URAIAN
1 40
2
SAT.
JUMLAH HARGA
JUMLAH HARGA
KO KOEF. BAHAN / UPAH ( Rp. )
BAHAN ( Rp. )
UPAH ( Rp. )
BAHAN + UPAH ( Rp. )
6
7
8
3
4
5
bh
1.0000
7,500.00
oh
0.1500
30,000.00
1BH PASANG PASANG ENGSEL ENGSEL JENDEL JENDELA A KUPU KUPU - KUPU KUPU Bahan : Engsel jendela
7,500.00
Tenaga : Tukang kayu Jumlah
4,500.00 7,500.00
4,500.00
Keuntungan Maksimal 10 %
41
12,000.00 1,200.00
Jumlah
13,200.00
Dibuilatkan
13,200.00
1BH 1BH PAS PASAN ANG G KUN KUNCI CI TANA TANAM M BIA BIASA SA Bahan : Kunci tanam biasa type besar
bh
1.0000
90,000.00
oh
0.5000
30,000.00
90,000.00
Tenaga : Tukang kayu Jumlah
15,000.00 90,000.00
15,000.00
Keuntungan Maksimal 10 %
42
105,000.00 10,500.00
Jumlah
115,500.00
Dibuilatkan
115,500.00
1BH 1BH PASA PASANG NG SLOT SLOT PINT PINTU U Bahan : Slot pintu
bh
1.0000
4,500.00
oh
0.4500
30,000.00
4,500.00
Tenaga : Tukang kayu Jumlah
13,500.00 4,500.00
13,500.00
Keuntungan Maksimal 10 %
43
18,000.00 1,800.00
Jumlah
19,800.00
Dibuilatkan
19,800.00
1BH 1BH PAS PASAN ANG G SLO SLOT T JEN JENDE DELA LA Bahan : Slot jendela
bh
1.0000
4,500.00
oh
0.1500
30,000.00
4,500.00
Tenaga : Tukang kayu Jumlah
4,500.00 4,500.00
4,500.00
Keuntungan Maksimal 10 %
44
9,000.00 900.00
Jumlah
9,900.00
Dibuilatkan
9,900.00
1BH 1BH PASAN PASANG G KUNC KUNCII TANA TANAM M KAMAR KAMAR MAND MANDII Bahan : Kunci tanam kamar mandi
bh
1.0000
65,000.00
oh
0.3500
30,000.00
65,000.00
Tenaga : Tukang kayu Jumlah
10,500.00 65,000.00
10,500.00
Keuntungan Maksimal 10 %
45
75,500.00 7,550.00
Jumlah
83,050.00
Dibuilatkan
83,050.00
1BH 1BH PAS PASAN ANG G SPR SPRIN ING G KNI KNIP P Bahan : Spring knip
bh
1.0000
10,000.00
oh
0.5000
30,000.00
10,000.00
Tenaga : Tukang kayu Jumlah
15,000.00 10,000.00
15,000.00
Keuntungan Maksimal 10 %
46
25,000.00 2,500.00
Jumlah
27,500.00
Dibuilatkan
27,500.00
1BH 1BH PASA PASANG NG KAIT KAIT ANGI ANGIN N Bahan : Kait angin type sendok ,stainles
bh
1.0000
6,000.00
oh
0.1500
30,000.00
6,000.00
Tenaga : Tukang kayu Jumlah
4,500.00 6,000.00
4,500.00
Keuntungan Maksimal 10 %
1,050.00
Jumlah
11,550.00
Dibuilatkan
11,550.00
HARGA SATUAN NO.
URAIAN
1 47
10,500.00
2
SAT.
JUMLAH HARGA
KO KOEF. BAHAN / UPAH ( Rp. )
BAHAN ( Rp. )
UPAH ( Rp. )
BAHAN + UPAH ( Rp. )
7
8
3
4
5
6
m'
8.2440
4,500.00
37,098.00
1TTK 1TTK PASA PASANG NG TITI TITIK K CAH CAHAY AYA A Bahan : Kabel NYM 3 x 2,5
JUMLAH HARGA
HARGA SATUAN NO.
URAIAN
1 47
2
SAT.
JUMLAH HARGA
JUMLAH HARGA
KO KOEF. BAHAN / UPAH ( Rp. )
BAHAN ( Rp. )
UPAH ( Rp. )
BAHAN + UPAH ( Rp. )
7
8
3
4
5
6
Kabel NYM 3 x 2,5
m'
8.2440
4,500.00
37,098.00
Solatif kabel
roll
0.3330
3,000.00
999.00
Pipa Kabel
btg
1.5000
3,000.00
4,500.00
1TTK 1TTK PASA PASANG NG TITI TITIK K CAH CAHAY AYA A Bahan :
T-Dus
bh
1.0000
50 500.00
500.00
Inbow Dus
bh
1.0000
1,000.00
1,000.00
ls
1.0000
20,000.00
Tenaga : Upah Kerja Jumlah
20,000.00 44,097.00
20,000.00
Keuntungan Maksimal 10 %
48
64,097.00 6,409.70
Jumlah
70,506.70
Dibuilatkan
70,500.00
1TTK 1TTK PASAN PASANG G TITIK TITIK DAYA/S DAYA/STOP TOP KONTAK KONTAK Bahan : Kabel NYM 3 x 2,5
m'
6.8700
4,500.00
Solatif kabel
roll
0.3330
3,000.00
30,915.00 999.00
Pipa Kabel
btg
1.5000
3,000.00
4,500.00
T-Dus
bh
1.0000
50 500.00
500.00
Inbow Dus
bh
1.0000
1,000.00
1,000.00
ls
1.0000
20,000.00
Tenaga : Upah Kerja Jumlah
20,000.00 37,914.00
20,000.00
Keuntungan Maksimal 10 %
49
57,914.00 5,791.40
Jumlah
63,705.40
Dibuilatkan
63,700.00
1BH 1BH PAS PASAN ANG G ARM ARMAT ATUR UR STOP STOP KON KONTA TAK K Bahan : Stop kontak 250 watt "Broco"
bh
1.0000
7,500.00
7,500.00
Alat bantu
ls
1.0000
1,000.00
1,000.00
ls
1.0000
10,000.00
Tenaga : Upah Kerja Jumlah
10,000.00 8,500.00
10,000.00
Keuntungan Maksimal 10 %
50
18,500.00 1,850.00
Jumlah
20,350.00
Dibuilatkan
20,350.00
1BH 1BH PASAN PASANG G ARMA ARMATU TUR R SAKL SAKLAR AR TUN TUNGG GGAL AL Bahan : Saklar tunggal "Broco"
bh
1.0000
7,500.00
7,500.00
Alat bantu
ls
1.0000
1,000.00
1,000.00
ls
1.0000
10,000.00
Tenaga : Upah Kerja Jumlah
10,000.00 8,500.00
10,000.00
Keuntungan Maksimal 10 %
51
18,500.00 1,850.00
Jumlah
20,350.00
Dibuilatkan
20,350.00
1BH 1BH PASAN PASANG G ARMA ARMATU TUR R SAKL SAKLAR AR GAN GANDA DA Bahan : Saklar ganda "Broco"
bh
1.0000
10,000.00
10,000.00
Alat bantu
ls
1.0000
1,000.00
1,000.00
ls
1.0000
10,000.00
Tenaga : Upah Kerja Jumlah
10,000.00 11,000.00
10,000.00
Keuntungan Maksimal 10 %
52
21,000.00 2,100.00
Jumlah
23,100.00
Dibuilatkan
23,100.00
1BH 1BH PAS PASAN ANG G LAMP LAMPU U PIJ PIJAR AR 25 WATT WATT Bahan : Lampu pijar Sek Phillips 25 watt
bh
1.0000
7,500.00
7,500.00
Pitting lampu "Broco"
bh
1.0000
5,000.00
5,000.00
Alat bantu
ls
1.0000
1,000.00
1,000.00
ls
1.0000
10,000.00
Tenaga : Upah Kerja Jumlah
10,000.00 13,500.00
10,000.00
Keuntungan Maksimal 10 %
2,350.00
Jumlah
25,850.00
Dibuilatkan
25,850.00
HARGA SATUAN NO.
URAIAN
1 53
23,500.00
2
SAT.
3
JUMLAH HARGA
KO KOEF.
4
BAHAN / UPAH ( Rp. )
BAHAN ( Rp. )
UPAH ( Rp. )
BAHAN + UPAH ( Rp. )
5
6
7
8
1M2 PASANG PASANGAN AN LANT LANTAI AI KERA KERAMIK MIK 20/20 20/20 POLOS POLOS Bahan : Keramik putih / polos 20/20, sek MULIA
m2
JUMLAH HARGA
1.0100
37,500.00
37,875.00
HARGA SATUAN NO.
URAIAN
1 53
SAT.
2
JUMLAH HARGA
JUMLAH HARGA
KO KOEF.
3
4
BAHAN / UPAH ( Rp. )
BAHAN ( Rp. )
UPAH ( Rp. )
BAHAN + UPAH ( Rp. )
5
6
7
8
1M2 PASANG PASANGAN AN LANT LANTAI AI KERA KERAMIK MIK 20/20 20/20 POLOS POLOS Bahan : Keramik putih / polos 20/20, sek MULIA
m2
1.0100
37,500.00
PC
kg
8.0000
750.00
37,875.00 6,000.00
Pasir pasang
kg
0.0300
65,000.00
1,950.00
Semen putih
kg
0. 0.0130
2,000.00
26.00
Tenaga : Peke Pekerj rja a
org
0.25 0.2500 00
25,0 5,000.0 0.00
6,250 ,250.0 .00 0
Tukang batu
org
0.4000
30,000.00
12,000.00
Kepala tukang batu
org
0.0500
35,000.00
1,750.00
Mandor
org
0.0250
40,000.00
Jumlah
1,000.00 45,851.00
21,000.00
Keuntungan Maksimal 10 %
54
66,851.00 6,685.10
Jumlah
73,536.10
Dibuilatkan
73,530.00
1M2 PASANG PASANGAN AN LANT LANTAI AI KERAM KERAMIK IK 20/2 20/20 0 WARNA WARNA CORA CORAK K Bahan : Keramik warna/corak 20/20, sek MULIA
m2
1.0100
42,500.00
42,925.00
PC
kg
8.0000
750.00
6,000.00
Pasir pasang
kg
0.0300
65,000.00
1,950.00
Semen putih
kg
0. 0.0130
2,000.00
26.00
Tenaga : Peke Pekerj rja a
org
0.25 0.2500 00
25,0 5,000.0 0.00
6,250 ,250.0 .00 0
Tukang batu
org
0.4000
30,000.00
12,000.00
Kepala tukang batu
org
0.0500
35,000.00
1,750.00
Mandor
org
0.0250
40,000.00
Jumlah
1,000.00 50,901.00
21,000.00
Keuntungan Maksimal 10 %
55
71,901.00 7,190.10
Jumlah
79,091.10
Dibuilatkan
79,090.00
1M2 1M2 PASAN PASANGA GAN N DIN DINDI DING NG BATU BATU AMPI AMPIG G Bahan : BATU AMPIG
m2
1.0100
50,000.00
PC
kg
8.0000
750.00
50,500.00 6,000.00
Pasir pasang
kg
0.0300
65,000.00
1,950.00
Semen putih
kg
0. 0.0130
2,000.00
26.00
Tenaga : Peke Pekerj rja a
org
0.25 0.2500 00
25,0 5,000.0 0.00
6,250 ,250.0 .00 0
Tukang batu
org
0.4000
30,000.00
12,000.00
Kepala tukang batu
org
0.0500
35,000.00
1,750.00
Mandor
org
0.0250
40,000.00
Jumlah
1,000.00 58,476.00
21,000.00
Keuntungan Maksimal 10 %
56
79,476.00 7,947.60
Jumlah
87,423.60
Dibuilatkan
87,420.00
1M2 PASAN PASANGAN GAN DIND DINDING ING KERAMI KERAMIK K 20/25 20/25 COR CORAK AK WARNA WARNA Bahan : Keramik corak warna 20/25, MULIA
m2
1.0100
37,500.00
PC
kg
8.0000
750.00
37,875.00 6,000.00
Pasir pasang
kg
0.0300
65,000.00
1,950.00
Semen putih
kg
0. 0.0130
2,000.00
26.00
Tenaga : Peke Pekerj rja a
org
0.25 0.2500 00
25,0 5,000.0 0.00
6,250 ,250.0 .00 0
Tukang batu
org
0.4000
30,000.00
12,000.00
Kepala tukang batu
org
0.0500
35,000.00
1,750.00
Mandor
org
0.0250
40,000.00
Jumlah
1,000.00 45,851.00
21,000.00
Keuntungan Maksimal 10 %
57
66,851.00 6,685.10
Jumlah
73,536.10
Dibuilatkan
73,530.00
1M2 PASAN PASANGAN GAN LANT LANTAI AI KERAMI KERAMIK K UK. 30/3 30/30 0 CM PUTIH PUTIH POLO POLOS S Bahan : Ubin kramik putih 30/30 cm putih polos
m2
1.0100
31,000.00
31,310.00
Semen portland
kg
8.0000
750.00
6,000.00
Pasir pasang
m3
0.0300
65,000.00
1,950.00
Semen warna (putih)
kg
0.0130
2,000.00
26.00
Tenaga : Pekerja
oh
0.2500
25,000.00
6,250.00
Tk. Batu
oh
0.4000
30,000.00
12,000.00
Kepala tukang batu
oh
0.0500
35,000.00
1,750.00
Mandor
oh
0.0250
40,000.00
Jumlah
1,000.00 39,286.00
Keuntungan Maksimal 10 %
58
21,000.00
60,286.00
6,028.60
Jumlah
66,314.60
Dibuilatkan
66,310.00
1M2 PASAN PASANGAN GAN LANT LANTAI AI KERAMI KERAMIK K UK. 30/3 30/30 0 CM WARNA WARNA CORAK CORAK Bahan : Ubin kramik putih 30/30 cm warna corak
m2
1.0100
34,000.00
34,340.00
Semen portland
kg
8.0000
750.00
6,000.00
Pasir pasang
m3
0.0300
65,000.00
1,950.00
Semen warna (putih)
kg
0 0130
2 000 00
26 00
Keuntungan Maksimal 10 %
58
6,028.60
Jumlah
66,314.60
Dibuilatkan
66,310.00
1M2 PASAN PASANGAN GAN LANT LANTAI AI KERAMI KERAMIK K UK. 30/3 30/30 0 CM WARNA WARNA CORAK CORAK Bahan : Ubin kramik putih 30/30 cm warna corak
m2
1.0100
34,000.00
34,340.00
Semen portland
kg
8.0000
750.00
6,000.00
Pasir pasang
m3
0.0300
65,000.00
1,950.00
Semen warna (putih)
kg
0.0130
2,000.00
26.00
Tenaga : Pekerja
oh
0.2500
25,000.00
6,250.00
Tk. Batu
oh
0.4000
30,000.00
12,000.00
Kepala tukang batu
oh
0.0500
35,000.00
1,750.00
Mandor
oh
0.0250
40,000.00
Jumlah
1,000.00 42,316.00
21,000.00
Keuntungan Maksimal 10 %
59
63,316.00 6,331.60
Jumlah
69,647.60
Dibuilatkan
69,640.00
1M2 PASA PASAN NGAN MAR MARMER MER Bahan : Marmer
m2
Semen portland
kg
1.0000
250,000.00
250,000.00
13.0000
750.00
Pasir pasang
9,750.00
m3
0.0300
65,000.00
Campuran kedap air
1,950.00
kg
1.0000
2,000.00
2,000.00
Tenaga : Pekerja
oh
1.0000
25,000.00
Tk. Batu
oh
0.2000
30,000.00
6,000.00
Kepala tukang batu
oh
1.0000
35,000.00
35,000.00
Mandor
oh
0.0480
40,000.00
Jumlah
25,000.00
1,920.00 263,700.00
67,920.00
Keuntungan Maksimal 10 %
70
331,620.00 33,162.00
Jumlah
364,782.00
Dibuilatkan
364,780.00
1M2 PASANG PASANGAN AN PAVI PAVING NG BLOCK BLOCK NATU NATURAL RAL,, T = 6 CM CM Bahan : Paving Block natural t = 6 cm
m2
1.1000
23,000.00
25,300.00
Pasir beton
m3
0.1000
120,000.00
12,000.00
Tenaga : Pekerja
oh
0.1500
25,000.00
3,750.00
Tk. Batu
oh
0.2500
30,000.00
7,500.00
Kepala tukang batu
oh
0.0250
35,000.00
875.00
Mandor
oh
0.0020
40,000.00
Jumlah
80.00 37,300.00
12,205.00
Keuntungan Maksimal 10 %
71
49,505.00 4,950.50
Jumlah
54,455.50
Dibuilatkan
54,450.00
1M2 PASANG PASANGAN AN PAVI PAVING NG BLOCK BLOCK WARN WARNA, A, T = 6 CM CM Bahan : Paving Block warna t = 6 cm
m2
1.1000
25,000.00
27,500.00
Pasir beton
m3
0.1000
120,000.00
12,000.00
Tenaga : Pekerja
oh
0.1500
25,000.00
3,750.00
Tk. Batu
oh
0.2500
30,000.00
7,500.00
Kepala tukang batu
oh
0.0250
35,000.00
875.00
Mandor
oh
0.0020
40,000.00
Jumlah
80.00 39,500.00
12,205.00
Keuntungan Maksimal 10 %
72
51,705.00 5,170.50
Jumlah
56,875.50
Dibuilatkan
56,870.00
1M2 PASANG PASANGAN AN PAVI PAVING NG BLOCK BLOCK NATU NATURAL RAL,, T = 8 CM CM Bahan : Paving Block natural t = 8 cm
m2
1.1000
27,500.00
30,250.00
Pasir beton
m3
0.1000
120,000.00
12,000.00
Tenaga : Pekerja
oh
0.1500
25,000.00
3,750.00
Tk. Batu
oh
0.2500
30,000.00
7,500.00
Kepala tukang batu
oh
0.0250
35,000.00
875.00
Mandor
oh
0.0020
40,000.00
Jumlah
80.00 42,250.00
12,205.00
Keuntungan Maksimal 10 %
5,445.50
Jumlah
59,900.50
Dibuilatkan
59,900.00
HARGA SATUAN NO.
URAIAN
1 73
54,455.00
2
SAT.
3
JUMLAH HARGA
KO KOEF.
4
BAHAN / UPAH ( Rp. )
BAHAN ( Rp. )
UPAH ( Rp. )
BAHAN + UPAH ( Rp. )
5
6
7
8
1M2 PASANG PASANGAN AN PAVI PAVING NG BLOCK BLOCK WARN WARNA, A, T = 8 CM CM Bahan : Paving Block warna t = 8 cm
m2
JUMLAH HARGA
1.1000
30,000.00
33,000.00
HARGA SATUAN NO.
URAIAN
1 73
2
SAT.
3
JUMLAH HARGA
JUMLAH HARGA
KO KOEF.
4
BAHAN / UPAH ( Rp. )
BAHAN ( Rp. )
UPAH ( Rp. )
BAHAN + UPAH ( Rp. )
5
6
7
8
1M2 PASANG PASANGAN AN PAVI PAVING NG BLOCK BLOCK WARN WARNA, A, T = 8 CM CM Bahan : Paving Block warna t = 8 cm
m2
1.1000
30,000.00
33,000.00
Pasir beton
m3
0.1000
120,000.00
12,000.00
Tenaga : Pekerja
oh
0.1500
25,000.00
3,750.00
Tk. Batu
oh
0.2500
30,000.00
7,500.00
Kepala tukang batu
oh
0.0250
35,000.00
875.00
Mandor
oh
0.0020
40,000.00
Jumlah
80.00 45,000.00
12,205.00
Keuntungan Maksimal 10 %
74
57,205.00 5,720.50
Jumlah
62,925.50
Dibuilatkan
62,920.00
1M' PASAN PASANGAN GAN SALU SALURAN RAN GREV GREVEL EL BETON BETON 1/2 1/2 DIA DIA 20 CM + PASANG PASANGAN AN Bahan : Grevel beton 1/2 Dia 20 cm
m'
1.0000
22,500.00
22,500.00 5,076.00
Item Pekerjaan : Galian tanah
m3
0.3600
14,100.00
Urugan Tanah Kembali
m3
0.1400
6,050.00
Urugan pasir T = 5 cm
m3
0.0500
52,150.00
2,607.50
Pasangan bata 1 PC : 3 PS
m2
1.0000
54,650.00
54,650.00
Plesteran + Acian 1 PC : 3 PS
m2
0.8000
152,350.00
121,880.00
Tambahan Upah
ls
1.0000
1,000.00
Jumlah
1,000.00 207,713.50
207,713.50
Keuntungan Maksimal 10 %
75
20,771.35
Jumlah
228,484.85
Dibuilatkan
228,480.00
1BH 1BH BAK BAK KONT KONTRO ROL L UK. UK. DALA DALAM M 25 25 25 CM Item Pekerjaan : Galian tanah
m3
0.0810
14,100.00
1,142.10
Pasangan bata 1 PC : 5 PS
m2
0.6225
54,650.00
34,019.63 47,609.38
Plesteran 1 PC : 5 PS
m2
0.3125
152,350.00
Tutup beton tinggi 5 cm
m3
0.0045
430,140.00
Jumlah
1,935.63 84,706.73
84,706.73
Keuntungan Maksimal 10 %
76
8,470.67
Jumlah
93,177.40
Dibuilatkan
93,170.00
1UNIT 1UNIT PEKER PEKERJAAN JAAN SEPTICK SEPTICKTAN TANK K UK. 2.50 2.50 X 2.00 2.00 X 1.50 1.50 M Bahan : Soket T PVC 4"
bh
2.0000
4,000.00
8,000.00
Pip Pipa hit hitam 1 1/2" /2"
m'
0.80 0.8000 00
2,0 2,000.0 0.00
1,600 ,600.0 .00 0
Pasangan ijuk
kg
75.0000
3,000.00
225,000.00
Piva PVC 4" berlobang jenis ( D )
m'
4.5000
20,000.00
90,000.00 105,750.00
Item Pekerjaan : Galian tanah
m3
7.5000
14,100.00
Pasir urug tinggi 5 cm
m3
0.2300
52,150.00
11,994.50
Pasangan bata 1 bata 1 : 3 + plesteran 1 : 3
m2
21.5100
227,690.00
4,897,611.90 184, 184,96 960. 0.20 20
Plat Plat beto beton n tutu tutup p + balok balok
m3
0.43 0.4300 00
430, 430,14 140. 0.00 00
Galian tanah untuk rembesan
m3
5.0000
14,100.00
70,500.00
Urugan kerikil 3/5 cm
m3
1.4000
100,000.00
140,000.00
Urugan kembali perataan tanah
m3
1.0000
6,650.00
6,650.00
Bak kontrol 25 x 25 ( uk. Dalam )
bh
2.0000
93,170.00
186,340.00
ls
1.0000
100,000.00
Upah : Tambahan upah Jumlah
100,000.00 5,928,406.60 5,928,406.60
100,000.00
Keuntungan Maksimal 10 %
77
6,028,406.60 602,840.66
Jumlah
6,631,247.26
Dibuilatkan
6,631,240.00
1M' PASANGA PASANGAN N SALU SALURAN RAN AIR BERSIH BERSIH PVC 1/2" 1/2" Bahan : Pipa PVC 1/2"
m'
1.0000
3,000.00
ls
1.0000
2,000.00
3,000.00
Tenaga : Upah Jumlah
2,000.00 3,000.00
2,000.00
Keuntungan Maksimal 10 %
78
5,000.00 500.00
Jumlah
5,500.00
Dibuilatkan
5,500.00
1M' PASANGA PASANGAN N SALU SALURAN RAN AIR HUJAN HUJAN PVC 3" Bahan : Pipa PVC 3"
m'
1.0000
15,000.00
ls
1.0000
2,000.00
15,000.00
Tenaga : Upah
Jumlah
2,000.00
15,000.00
2,000.00
Keuntungan Maksimal 10 %
79
17,000.00 1,700.00
Jumlah
18,700.00
Dibuilatkan
18,700.00
1M' PASANGA PASANGAN N SALU SALURAN RAN AIR KOTOR KOTOR PVC 4" Bahan : Pipa PVC 4"
m'
1.0000
20,000.00
ls
1 0000
2 000 00
20,000.00
Tenaga : Upah
2 000 00
Jumlah
15,000.00
2,000.00
Keuntungan Maksimal 10 %
79
17,000.00 1,700.00
Jumlah
18,700.00
Dibuilatkan
18,700.00
1M' PASANGA PASANGAN N SALU SALURAN RAN AIR KOTOR KOTOR PVC 4" Bahan : Pipa PVC 4"
m'
1.0000
20,000.00
ls
1.0000
2,000.00
20,000.00
Tenaga : Upah Jumlah
2,000.00 20,000.00
2,000.00
Keuntungan Maksimal 10 %
22,000.00 2,200.00
Jumlah
24,200.00
Dibuilatkan
24,200.00
Bahan : Cat Tembok SANLEX
kg
0.1750
10,000.00
Rol Cat
bh
0.0100
6, 6 ,000.00
1,750.00 60.00
Steger Werk
ls
0.5000
2,500.00
1,250.00
Ampelas
lbr
0.5000
2,000.00
1,000.00
Tenaga : Pekerja
oh
0.1060
25,000.00
2,650.00
Tk. Cat
oh
0.1860
30,000.00
5,580.00
Kepala tukang cat
oh
0.0200
35,000.00
700.00
Mandor
oh
0.0060
40,000.00
Jumlah
240.00 4,060.00
9,170.00
Keuntungan Maksimal 10 %
81
13,230.00 1,323.00
Jumlah
14,553.00
Dibuilatkan
14,550.00
1M2 PENGEC PENGECATA ATAN N DINDIN DINDING G SANLEX SANLEX (3X) (3X) Bahan : Cat Tembok SANLEX
kg
0.1800
10,000.00
1,800.00
Plamur Tembok
kg
0.1600
17,500.00
2,800.00
Rol Cat
bh
0.0100
6, 6 ,000.00
60.00
Steger Werk
ls
1.0000
2,500.00
2,500.00
Ampelas
lbr
0.5000
2,000.00
1,000.00
Tenaga : Pekerja
oh
0.1060
25,000.00
2,650.00
Tk. Cat
oh
0.1800
30,000.00
5,400.00
Kepala tukang cat
oh
0.0200
35,000.00
700.00
Mandor
oh
0.0100
40,000.00
Jumlah
400.00 8,160.00
9,150.00
Keuntungan Maksimal 10 %
82
17,310.00 1,731.00
Jumlah
19,041.00
Dibuilatkan
19,040.00
1M2 PENGEC PENGECATA ATAN N PLAFON PLAFOND D SANLEX SANLEX (2X) (2X) Bahan : Cat Tembok SANLEX
kg
0.1750
10,000.00
Rol Cat
bh
0.0100
6, 6 ,000.00
1,750.00 60.00
Steger Werk
ls
1.0000
5,000.00
5,000.00
Ampelas
lbr
0.5000
2,000.00
1,000.00
oh
0.1330
25,000.00
3,325.00
Tenaga : Pekerja Tk. Cat
oh
0.2000
30,000.00
6,000.00
Kepala tukang cat
oh
0.0200
35,000.00
700.00
Mandor
oh
0.0060
40,000.00
Jumlah
240.00 7,810.00
10,265.00
Keuntungan Maksimal 10 %
83
18,075.00 1,807.50
Jumlah
19,882.50
Dibuilatkan
19,880.00
1M2 PENGEC PENGECATA ATAN N PLAFON PLAFOND D SANLEX SANLEX (3X) (3X) Bahan : Cat Tembok SANLEX
kg
0.2000
7,000.00
1,400.00
Plamur Tembok
kg
0.1600
17,500.00
2,800.00
Rol Cat
bh
0.0100
6, 6 ,000.00
60.00
Steger Werk
ls
1.0000
5,000.00
5,000.00
Ampelas
lbr
0.5000
2,000.00
1,000.00
Tenaga : Pekerja
oh
0.1000
25,000.00
2,500.00
Tk. Cat
oh
0.1800
30,000.00
5,400.00
Kepala tukang cat
oh
0.0200
35,000.00
700.00
Mandor
oh
0.0100
40,000.00
Jumlah
400.00 10,260.00
9,000.00
Keuntungan Maksimal 10 %
1,926.00
Jumlah
21,186.00
Dibuilatkan
21,180.00
HARGA SATUAN NO.
URAIAN
1 84
19,260.00
2
SAT.
JUMLAH HARGA
KO KOEF. BAHAN / UPAH ( Rp. )
BAHAN ( Rp. )
UPAH ( Rp. )
BAHAN + UPAH ( Rp. )
6
7
8
3
4
5
ltr
0.1500
8,500.00
1M2 PLABUR PLABURAN AN BIDA BIDANG NG KAYU KAYU DENGAN DENGAN POLITU POLITUR R Bahan : Politur
JUMLAH HARGA
1,275.00
HARGA SATUAN NO.
URAIAN
1 84
2
SAT.
JUMLAH HARGA
JUMLAH HARGA
KO KOEF. BAHAN / UPAH ( Rp. )
BAHAN ( Rp. )
UPAH ( Rp. )
BAHAN + UPAH ( Rp. )
5
6
7
8
3
4
Politur
ltr
0.1500
8,500.00
1,275.00
Poli Politu turr jad jadi
ltr ltr
0.37 0.3720 20
22,0 2,000.0 0.00
8,184 ,184.0 .00 0
1M2 PLABUR PLABURAN AN BIDA BIDANG NG KAYU KAYU DENGAN DENGAN POLITU POLITUR R Bahan :
Kertas ampelas
lbr
0.1500
2,000.00
300.00
Kuas 3"
bh
0.0100
3, 3 ,500.00
35.00
Tenaga : Tk. Cat
oh
0.0600
30,000.00
1,800.00
Kepala tukang cat
oh
0.0160
35,000.00
560.00
Mandor
oh
0.0025
40,000.00
Jumlah
100.00 9,794.00
2,460.00
Keuntungan Maksimal 10 %
85
12,254.00 1,225.40
Jumlah
13,479.40
Dibuilatkan
13,470.00
1M2 PLABU PLABURAN RAN BIDAN BIDANG G KAYU DENG DENGAN AN CAT CAT RESIDU/ RESIDU/SOL SOLIGN IGNEM EM Bahan : Residu
ltr
0.3000
2,500.00
750.00
Minyak tanah/solar
ltr
0.0300
4,500.00
135.00
Kwas 3"
bh
0.0200
3,500.00
70.00
Tenaga : Pekerja
oh
0.0200
25,000.00
500.00
Tukang cat
oh
0.1000
30,000.00
3,000.00
Mandor
oh
0.0100
40,000.00
Jumlah
400.00 955.00
3,900.00
Keuntungan Maksimal 10 %
86
4,855.00 485.50
Jumlah
5,340.50
Dibuilatkan
5,340.00
1M2 1M2 PENG PENGEC ECAT ATAN AN KAYU KAYU (2X) (2X) Bahan : Cat kayu merk SEIV
kg
0.2000
28,000.00
Ampelas kayu
lbr
0.4000
2,000.00
5,600.00 800.00
Minyak cat terpentin
ltr
0.1500
12,500.00
1,875.00
Kwas 3"
bh
0.0500
3,500.00
175.00
Tenaga : Pekerja
oh
0.1333
25,000.00
3,332.50
Tukang cat
oh
0.2000
30,000.00
6,000.00
Kepala tukang cat
oh
0.0200
35,000.00
700.00
Mandor
oh
0.0060
40,000.00
Jumlah
240.00 8,450.00
10,272.50
Keuntungan Maksimal 10 %
87
18,722.50 1,872.25
Jumlah
20,594.75
Dibuilatkan
20,590.00
1M2 PENGEC PENGECATA ATAN N KAYU KAYU (3X) (3X) BERI BERIKUT KUT MENIE MENIE Bahan : Meni kayu
kg
0.1670
12,500.00
Plamur kayu
kg
0.0830
12,000.00
Cat kayu merk SEIV
kg
Ampelas kayu
lbr
0.4000
2,000.00
800.00
Minyak cat terpentin
ltr
0.1500
12,500.00
1,875.00
Kwas 3"
bh
0.0500
3,500.00
175.00
0.2000
28,000.00
2,087.50 996.00 5,600.00
Tenaga : Pekerja
oh
0.2000
25,000.00
5,000.00
Tukang cat
oh
0.3000
30,000.00
9,000.00
Kepala tukang cat
oh
0.0300
35,000.00
1,050.00
Mandor
oh
0.0100
40,000.00
Jumlah
400.00 11,533.50
15,450.00
Keuntungan Maksimal 10 %
2,698.35
Jumlah
29,681.85
Dibuilatkan
29,680.00
HARGA SATUAN NO.
URAIAN
1 88
26,983.50
2
SAT.
JUMLAH HARGA
KO KOEF.
3
4
kg
0.1113
BAHAN / UPAH ( Rp. )
BAHAN ( Rp. )
UPAH ( Rp. )
BAHAN + UPAH ( Rp. )
5
6
7
8
1M2 1M2 LABU LABURA RAN N MEN MENIE IE KAYU KAYU (2X (2X)) Bahan : Meni kayu
JUMLAH HARGA
12,500.00
1,391.25
HARGA SATUAN NO.
URAIAN
1 88
2
SAT.
JUMLAH HARGA
JUMLAH HARGA
KO KOEF.
3
4
BAHAN / UPAH ( Rp. )
BAHAN ( Rp. )
UPAH ( Rp. )
BAHAN + UPAH ( Rp. )
5
6
7
8
1M2 1M2 LABU LABURA RAN N MEN MENIE IE KAYU KAYU (2X (2X)) Bahan : Meni kayu
kg
0.1113
12,500.00
Ampelas kayu
lbr
0.0667
2,000.00
1,391.25 133.40
Minyak cat terpentin
ltr
0.0200
12,500.00
250.00
Kwas 3"
bh
0.0333
3,500.00
116.55
Tenaga : Pekerja
oh
0.1000
25,000.00
2,500.00
Tukang cat
oh
0.0500
30,000.00
1,500.00
Kepala tukang cat
oh
0.0125
35,000.00
437.50
Mandor
oh
0.0080
40,000.00
Jumlah
320.00 1,891.20
4,757.50
Keuntungan Maksimal 10 %
89
6,648.70 664.87
Jumlah
7,313.57
Dibuilatkan
7,310.00
1M3 LANTAI LANTAI KERJA KERJA 1PC 1PC : 3PS 3PS : 5KR (Rabat (Rabat)) Bahan : PC ( 50 kg )
kg
173.0000
750.00
129,750.00
Pasir beton
m3
0.5000
120,000.00
60,000.00
Split pecah mesin 2/3
m3
0.8700
130,000.00
113,100.00
ls
1.0000
1,000.00
1,000.00
Pekerja
org
2.0000
25,000.00
50,000.00
Tukang batu
org
0.5000
30,000.00
15,000.00
Kepala tukang
org
0.0500
35,000.00
1,750.00
Mandor
org
0.0100
40,000.00
400.00
ls
1. 1.0000
65,000.00
65,000.00
Peralatan Tenaga :
Sewa Alat Berat Jumlah
303,850.00
132,150.00
Keuntungan Maksimal 10 %
90
436,000.00 43,600.00
Jumlah
479,600.00
Dibuilatkan
479,600.00
1M3 MEMBUA MEMBUAT T BETO BETON N TUMB TUMBUK UK 1PC : 3 PS : 5 KR Bahan : Semen portlannd
kg
218.0000
750.00
Pasir beton
m3
0.5200
120,000.00
163,500.00 62,400.00
Koral beton - split
m3
0.8700
130,000.00
113,100.00
Tenaga : Pekerja
oh
1.6500
25,000.00
41,250.00
Tukang batu
oh
0.2500
30,000.00
7,500.00
Kepala tukang batu
oh
0.0025
35,000.00
87.50
Mandor
oh
0.0800
40,000.00
3,200.00
Jumlah
339,000.00
52,037.50
Keuntungan Maksimal 10 %
91
391,037.50 39,103.75
Jumlah
430,141.25
Dibuilatkan
430,140.00
1M3 1M3 BET BETON ON SITE SITE MIX MIX K 200 200 Bahan : Semen portlannd
kg
340.0000
750.00
Pasir beton
m3
0.5400
120,000.00
255,000.00 64,800.00
Koral beton - split
m3
0.8300
130,000.00
107,900.00
Tenaga : Pekerja
oh
1.5000
25,000.00
37,500.00
Tukang batu
oh
0.5000
30,000.00
15,000.00
Kepala tukang batu
oh
0.0500
35,000.00
1,750.00
Mandor
oh
0.0100
40,000.00
400.00
Peralatan
ls
1.0000
10,000.00
10,000.00
Jumlah
427,700.00
64,650.00
Keuntungan Maksimal 10 %
49,235.00
Jumlah
541,585.00
Dibuilatkan
541,580.00
HARGA SATUAN NO.
URAIAN
1 92
492,350.00
2
SAT.
3
JUMLAH HARGA
KO KOEF.
4
BAHAN / UPAH ( Rp. )
BAHAN ( Rp. )
UPAH ( Rp. )
BAHAN + UPAH ( Rp. )
5
6
7
8
1M3 1M3 COR COR BETON BETON SITE SITE MIX MIX K22 K225 5 Bahan : PC
kg
JUMLAH HARGA
395.0000
75 750.00
296,250.00
HARGA SATUAN NO.
URAIAN
1 92
2
SAT.
JUMLAH HARGA
JUMLAH HARGA
KO KOEF.
3
4
BAHAN / UPAH ( Rp. )
BAHAN ( Rp. )
UPAH ( Rp. )
BAHAN + UPAH ( Rp. )
5
6
7
8
1M3 1M3 COR COR BETON BETON SITE SITE MIX MIX K22 K225 5 Bahan : PC
kg
395.0000
75 750.00
Pasir beton Cimalaka
m3
0.4900
120,000.00
296,250.00 58,800.00
Split pecah mesin 2/3
m3
0.8100
130,000.00
105,300.00
Tenaga : Pekerja
org
1.5000
25,000.00
37,500.00
Tk.Batu
org
0.5000
30,000.00
15,000.00
Kepala tukang batu
org
0.0500
35,000.00
1,750.00
Mandor
org
0.0100
40,000.00
400.00
ls
1.0000
10,000.00
10,000.00
Peralatan Jumlah
460,350.00
64,650.00
Keuntungan Maksimal 10 %
93
525,000.00 52,500.00
Jumlah
577,500.00
Dibuilatkan
577,500.00
1KG PEMBESI PEMBESIAN AN DENG DENGAN AN BESI BESI POLOS POLOS U - 24 & U - 32 Bahan : Besi beton polos
kg
1.0500
7,000.00
7,350.00
Kawat beton
kg
0.0100
10,000.00
100.00
Tenaga : Pekerja
oh
0.0300
25,000.00
750.00
Tukang besi
oh
0.0200
30,000.00
600.00
Kepala tukang besi
oh
0.0100
35,000.00
350.00
Mandor
oh
0.0100
40,000.00
400.00
Peralatan Spancer
ls
1.0000
200.00
Jumlah
200.00 7,450.00
2,300.00
Keuntungan Maksimal 10 %
94
9,750.00 975.00
Jumlah
10,725.00
Dibuilatkan
10,720.00
1M2 PASANG PASANGAN AN BEKI BEKISTI STING NG PAPAN PAPAN ( ANAL ANALISA ISA BOW ) Bahan : Kaso 5/7 Borneo, 2 x pakai ( 0,5 % )
m3
0.0200
1,000,000.00
20,000.00
Papan Terentang, 2 x pakai ( 50 % )
m3
0.0200
205,000.00
4,100.00
Paku 5 - 7 cm
kg
0.4000
8,000.00
3,200.00
Tenaga : Pekerja
org
0.1200
25,000.00
3,000.00
Tk.Kayu
org
0.1500
30,000.00
4,500.00
Kepala tukang kayu
org
0.1500
35,000.00
5,250.00
Mandor
org
0.0500
40,000.00
2,000.00
Pekerja (bongkar cetakan)
org
0.1200
30,000.00
3,600.00
Jumlah
27,300.00
18,350.00
Keuntungan Maksimal 10 %
95
45,650.00 4,565.00
Jumlah
50,215.00
Dibuilatkan
50,210.00
1M2 PASAN PASANGAN GAN BEKI BEKISTI STING NG MULT MULTIPL IPLEK EK 9 MM ( ANAL ANALISA ISA BOW BOW ) Bahan : Kaso 5/7 Borneo, 2 x pakai ( 50 % )
m3
0.0280
1,000,000.00
28,000.00
Multiplek 9 mm 2 x pakai ( 50 % )
lbr
0.3470
60,000.00
20,820.00
Paku 5 - 7 cm
kg
0.4000
8,000.00
3,200.00
Tenaga : Pekerja
org
0.2000
25,000.00
5,000.00
Tk.Kayu
org
0.5000
30,000.00
15,000.00
Kepala tukang kayu
org
0.0500
35,000.00
1,750.00
Mandor
org
0.0100
40,000.00
400.00
Pekerja (bongkar cetakan)
org
0.4000
30,000.00
12,000.00
Jumlah
52,020.00
34,150.00
Keuntungan Maksimal 10 %
96
86,170.00 8,617.00
Jumlah
94,787.00
Dibuilatkan
94,780.00
1M2 1M2 PAS PASAN ANGA GAN N STO STOOT OTWE WERK RK Bahan : Kayu dolken, 2 x pakai ( 50 % )
btg
9.0000
8,750.00
78,750.00
Papan Albasiah, 2 x pakai ( 75 % )
m3
0.0200
205,000.00
4,100.00
Paku 5 - 7 cm
kg
0.5000
8,000.00
4,000.00
org
0.1500
25,000.00
Tenaga : Pekerja
3,750.00
Tk.Kayu
org
0.2000
30,000.00
6,000.00
Kepala tukang kayu
org
0.2000
35,000.00
7,000.00
Mandor
org
0.0200
40,000.00
Jumlah Keuntungan Maksimal 10 %
800.00 86,850.00
17,550.00
104,400.00 10,440.00
Jumlah
114,840.00
Dibuilatkan
114,840.00
Dibuilatkan
114,840.00
HARGA SATUAN NO.
URAIAN
1 97
2
SAT.
3
JUMLAH HARGA
KO KOEF. BAHAN / UPAH ( Rp. )
BAHAN ( Rp. )
UPAH ( Rp. )
BAHAN + UPAH ( Rp. )
5
6
7
8
4
1M3 PEKERJAAN PEKERJAAN BETON PONDASI PONDASI PLAT 1,00 X 1,00 1,00 Tul = 227,280 227,280 KG KG (16 - 20) Item Pekerjaan : Cor Beton K - 225
m3
JUMLAH HARGA
1.0000
577,500.00
577,500.00
HARGA SATUAN NO.
URAIAN
1 97
2
SAT.
3
JUMLAH HARGA
JUMLAH HARGA
KO KOEF. BAHAN / UPAH ( Rp. )
BAHAN ( Rp. )
UPAH ( Rp. )
BAHAN + UPAH ( Rp. )
5
6
7
8
4
1M3 PEKERJAAN PEKERJAAN BETON PONDASI PONDASI PLAT 1,00 X 1,00 1,00 Tul = 227,280 227,280 KG KG (16 - 20) Item Pekerjaan : Cor Beton K - 225
m3
1.0000
577,500.00
577,500.00
Tulangan beton besi U24
kg
227.2800
10,720.00
2,436,441.60
Bekisting papan
m2
0.6000
50,210.00
Jumlah
30,126.00 3,044,067.60 3,044,067.60
3,044,067.60
Dibuilatkan 98
3,044,000.00
1M3 PEKERJAAN PEKERJAAN BETON BETON KOLOM KOLOM STRUKT STRUKTUR UR 20/35 20/35 Tul = 182,1 182,143 43 KG (8 (8 dia 14 + dia 10 - 20) 20) Item Pekerjaan : Cor Beton K - 225
m3
1.0000
577,500.00
577,500.00
Tulangan beton besi U24
kg
182.1430
10,720.00
1,952,572.96
Bekisting papan
m2
15.0000
50,210.00
Jumlah
753,150.00 3,283,222.96 3,283,222.96
3,283,222.96
Keuntungan Maksimal 10 %
99
328,322.30
Jumlah
3,611,545.26
Dibuilatkan
3,611,540.00
1M3 PEKERJAAN PEKERJAAN BETON KOLOM SELASAR 15/20 15/20 Tul = 151,260 151,260 KG (4 dia 12 + dia 8 - 20) Item Pekerjaan : Cor Beton K - 225
m3
1.0000
577,500.00
577,500.00
Tulangan beton besi U24
kg
151.2600
10,720.00
1,621,507.20
Bekisting papan
m2
15.0000
50,210.00
Jumlah
753,150.00 2,952,157.20 2,952,157.20
2,952,157.20
Keuntungan Maksimal 10 %
100
295,215.72
Jumlah
3,247,372.92
Dibuilatkan
3,247,370.00
1M3 PEKERJAAN PEKERJAAN BETON BETON KOLOM KOLOM PRAKTIS PRAKTIS 12/12 12/12 Tul Tul = 226,064 226,064 KG KG (4 dia 10 + dia 8 - 20) Item Pekerjaan : Cor Beton K - 225
m3
1.0000
577,500.00
577,500.00
Tulangan beton besi U24
kg
226.0640
10,720.00
2,423,406.08
Bekisting papan
m2
16.6667
50,210.00
Jumlah
836,835.01 3,837,741.09 3,837,741.09
3,837,741.09
Keuntungan Maksimal 10 %
101
383,774.11
Jumlah
4,221,515.20
Dibuilatkan
4,221,510.00
1M3 PEKERJAAN PEKERJAAN BETON BETON BALOK INDUK INDUK 20/60 20/60 Tul Tul = 211,130 211,130 KG (8 dia 19 + 2 dia 12 12 + dia 10 - 15) Item Pekerjaan : Cor Beton K - 225
m3
1.0000
577,500.00
577,500.00
Tulangan beton besi U24
kg
211.1300
10,720.00
2,263,313.60
Bekisting papan
m2
9.6670
50,210.00
Jumlah
485,380.07 3,326,193.67 3,326,193.67
3,326,193.67
Keuntungan Maksimal 10 %
102
332,619.37
Jumlah
3,658,813.04
Dibuilatkan
3,658,810.00
1M3 PEKERJAAN PEKERJAAN BETON BETON BALOK BALOK ANAK ANAK 20/30 20/30 Tul = 109,00 109,000 0 KG (5 dia dia 12 + dia 8 - 15) Item Pekerjaan : Cor Beton K - 225
m3
1.0000
577,500.00
577,500.00
Tulangan beton besi U24
kg
109.0000
10,720.00
1,168,480.00
Bekisting papan
m2
9.3330
50,210.00
Jumlah
468,609.93 2,214,589.93 2,214,589.93
2,214,589.93
Keuntungan Maksimal 10 %
103
221,458.99
Jumlah
2,436,048.92
Dibuilatkan
2,436,040.00
1M PASANGAN PASANGAN KONTRUKSI KONTRUKSI KUDA - KUDA BAJA BAJA RINGAN RINGAN ( PABRIKASI PABRIKASI ) Bahan : Baja Ringan ( Pabrikasi )
104 104
m
1.0000
35 350,000.00
350,000.00
350,000.00
Jumlah
350,000.00
Dibuilatkan
350,000.00
1M1 PASANG PASANGAN AN GENTEN GENTENG G PALENT PALENTONG ONG Bahan : Genteng palentong
bh
4.0000
1,000.00
4,000.00
Peralatan
ls
1.0000
500.00
500.00
Tenaga : Pekerj a
oh
0.1500
25,000.00
3,750.00
Tukang batu
oh
0.2000
30,000.00
6,000.00
Kepala tukang batu
oh
0.0100
35,000.00
350.00
Mandor
oh
0.0100
40,000.00
Jumlah
400.00 4,500.00
Keuntungan Maksimal 10 %
105 105
10,500.00
15,000.00 1,500.00
Jumlah
16,500.00
Dibuilatkan
16,500.00
1M LIST LIST PROFI PROFIL L PLAFON PLAFOND D GYPSU GYPSUM M ( PABRIKA PABRIKASI SI )
Bahan + Upah GYPSUM Jumlah Keuntungan Maksimal 10 %
m2
1.0000
25,000.00
25,000.00 25,000.00
25,000.00 2,500.00
Jumlah
27,500.00
Dibuilatkan
27,500.00
Bahan + Upah GYPSUM
m2
1.0000
25,000.00
Jumlah
25,000.00 25,000.00
Keuntungan Maksimal 10 %
25,000.00 2,500.00
Jumlah
27,500.00
Dibuilatkan
27,500.00
HARGA SATUAN PEKERJAAN PEMBANGUNAN RUMAH TINGGAL SATU LANTAI TYPE 40
NO
URAIAN PEKERJAAN
HARGA SATUAN ( Rp. )
1
2
3
HARGA SATUAN PEKERJAAN PEMBANGUNAN RUMAH TINGGAL SATU LANTAI TYPE 40
NO
URAIAN PEKERJAAN
HARGA SATUAN ( Rp. )
2
3
1 1
1M 1M2 PEKERJAAN PENGUKURAN SITE
1,430.00
2
1M3 PEKERJAAN STRIPPING SEDALAM 0,1 M
1,590.00
3
1M2 PEMBERSIHAN LAPANGAN DAN PERATAAN
4
1M' PASANGAN BOUWPLANK
13,940.00
5
1M3 GALIAN GALIAN TANAH TANAH BIASA BIASA KEDALAM KEDALAMAN AN 1 M
15,510 15,510.00 .00
6
1M3 GALIAN GALIAN TANAH TANAH BIASA BIASA KEDALAM KEDALAMAN AN 2 M
19,500 19,500.00 .00
7
1M3 URUGAN TANAH KEMBALI
8
1M3 URUGAN PASIR
4,950.00
6,650.00 57,360.00
9
1M3 PASANGA PASANGAN N PONDAS PONDASII BATU BATU KOSONG KOSONG AANSTA AANSTAMPI MPING NG
147,64 147,640.0 0.00 0
10
1M3 PASANGAN PONDASI BATU KALI 1 PC : 5 PS
310,150.00
11
1M2 PASANGAN BATA MERAH TEBAL 1/2 BATA 1PC : 3 PS
12
1M2 PASANGAN BATA MERAH TEBAL 1/2 BATA 1PC : 5 PS
48,150.00
13
1M2 PLESTERAN DINDING + ACIAN 1 : 5
22,110.00
14
1M2 FINISHING ACIAN
15
1M3 PASANGAN KUSEN PINTU / JENDELA KAYU SAMARINDA
5,611,650.00
16
1M3 PASANGAN KUSEN PINTU / JENDELA KAYU KAMPER SAMARINDA
5,611,650.00
17
1M2 PASANGAN PINTU PANEL KAYU SAMARINDA
18
1M2 PASANGAN DAUN PINTU TEAK WOOD 4 MM RANGKA KY. SAMARINDA
435,840.00
19
1M2 PASANGAN DAUN JENDELA KACA KAYU SAMARINDA
145,310.00
20
1M' PASANGAN PAPAN JALUSI KAYU BORNEO SUPER 1,5/12
13,510.00
21
1M2 PASANGAN KACA TEBAL 3 MM + List
64,620.00
22
1M2 PASANGAN KACA TEBAL 5 MM + List
78,370.00
23
1M1 PASANGAN PASANGAN BUBUNG BUBUNG GENTENG GENTENG PALENTONG PALENTONG
41,270.00 41,270.00
24
1M2 PASANGAN RANGKA LANGIT - LANGIT ( GRID 50 X 100 ) KAYU albasiah
29,650.00
25
1M2 PASANGAN PLAFOND GYPSUM ( PABRIKASI )
23,650.00
26
1M1 PASANGAN LIST PLANK (3X30 CM), KAYU BORNEO
14,530.00
27
1M1 PEKERJAAN PEKERJAAN PAPAN RUITER RUITER 2/20, KAYU BORNEO BORNEO
11,090.00 11,090.00
28
1M1 PEKERJAAN PAPAN RUITER 2/20, KAYU BORNEO SUPER
20,290.00
29
1M 1M1 PEKERJAAN TALANG DATAR BJLS 28
30
1BH PASANG BAK FIBER GLASS
167,070.00
31
1BH PASANG KLOSET JONGKOK
500,000.00
60,110.00
11,600.00
297,820.00
65,680.00
NO
URAIAN PEKERJAAN
HARGA SATUAN ( Rp. )
1
2
3
32
1BH PASANG ENGSEL PINTU
13,750.00
33
1BH PASANG ENGSEL JENDELA JENDELA KUPU - KUPU
13,200.00 13,200.00
34
1BH PASANG KUNCI TANAM BIASA
35
1BH PASANG SLOT PINTU
36
1BH PASANG SLOT JENDELA
37
1B 1BH PASANG KUNCI TANAM KAMAR MANDI
38
1BH PASANG SPRING KNIP
27,500.00
39
1BH PASANG KAIT ANGIN
11,550.00
40
1TTK 1TTK PASANG PASANG TITIK TITIK CAHAYA CAHAYA
70,500 70,500.00 .00
41
1T 1TTK PASANG TITIK DAYA/STOP KONTAK
40,000.00
42
1BH PASANG ARMATUR STOP KONTAK
20,350.00
43
1B 1BH PASANG ARMATUR SAKLAR TUNGGAL
20,350.00
44
1BH PASANG ARMATUR SAKLAR GANDA
23,100.00
45
1BH PASANG LAMPU PIJAR 25 WATT
25,850.00
46
1M2 PASANGAN LANTAI KERAMIK 20/20 POLOS
73,530.00
47
1M2 PASANGAN LANTAI KERAMIK 20/20 WARNA CORAK
79,090.00
48
1M2 PASANGA PASANGAN N DINDIN DINDING G BATU BATU AMPIG AMPIG
87,420 87,420.00 .00
49
1M2 PASANGAN PASANGAN DINDING DINDING KERAMIK KERAMIK 20/25 CORAK WARNA WARNA
73,530.00 73,530.00
50
1M2 PASANGAN LANTAI KERAMIK UK. 30/30 CM PUTIH POLOS
66,310.00
51
1M2 PASANGAN LANTAI KERAMIK UK. 30/30 CM WARNA CORAK
52
1M2 PASANGAN MARMER
53
1M2 PASANGAN PAVING BLOCK NATURAL, T = 6 CM
54
1M2 PASANGAN PAVING BLOCK WARNA, T = 6 CM
56,870.00
55
1M2 PASANGAN PAVING BLOCK NATURAL, T = 8 CM
59,900.00
56
1M2 PASANGAN PAVING BLOCK WARNA, T = 8 CM
57
1M' PASANGAN SALURAN GREVEL BETON 1/2 DIA 20 CM + PASANGAN
58
1BH BAK KONTROL UK. DALAM 25 25 CM
115,500.00 19,800.00 9,900.00 83,050.00
69,640.00 364,780.00 54,450.00
62,920.00 228,480.00 93,170.00
59
1UNIT PEKERJAAN SEPTICKTANK UK. 2.50 X 2.00 X 1.50 M
60
1M 1 M' PASANGAN SALURAN AIR BERSIH PVC 1/2"
6,631,240.00
61
1M 1M' PASANGAN SALURAN AIR HUJAN PVC 3"
62
1M 1M' PASANGAN SALURAN AIR KOTOR PVC 4"
24,200.00
63
PENGECATAN DINDING SANLEX ( 2 X )
14,550.00
64
1M 1M2 PENGECATAN DINDING SANLEX (3X)
19,040.00
65
1M 1M2 PENGECATAN PLAFOND SANLEX (2X)
19,880.00
66
1M 1M2 PENGECATAN PLAFOND SANLEX (3X)
21,180.00
67
1M2 PLABURAN BIDANG KAYU DENGAN POLITUR
13,470.00
68
1M2 PLABURAN BIDANG KAYU DENGAN CAT RESIDU/SOLIGNEM
69
1M2 PENGECATAN KAYU (2X)
20,590.00
70
1M 1 M2 PENGECATAN KAYU (3X) BERIKUT MENIE
29,680.00
71
1M2 LABURAN MENIE KAYU (2X)
72
1M 1 M3 LANTAI KERJA 1PC : 3PS : 5KR (Rabat)
73
1M3 MEMBUAT BETON TUMBUK 1PC : 3 PS : 5 KR
430,140.00
74
1M3 BETON SITE MIX K 200
541,580.00
75
1M3 COR BETON SITE MIX K225
577,500.00
76
1KG PEMBESIAN DENGAN BESI POLOS U - 24 & U - 32
77
1M2 PASANGAN BEKISTING PAPAN ( ANALISA BOW )
50,210.00
78
1M2 PASANGAN BEKISTING MULTIPLEK 9 MM ( ANALISA BOW )
94,780.00
79
1M2 PASANGAN STOOTWERK
80
1M3 PEKERJAAN BETON PONDASI PLAT 1,00 X 1,00 Tul = 227,280 KG (16 - 20)
3,044,000.00
81
1M3 PEKERJAAN BETON KOLOM STRUKTUR 20/35 Tul = 182,143 KG (8 dia 14 + dia 10 - 20)
3,611,540.00
82
1M3 PEKERJAAN BETON KOLOM SELASAR 15/20 Tul = 151,260 KG (4 dia 12 + dia 8 - 20)
3,247,370.00
83
1M3 PEKERJAAN BETON KOLOM PRAKTIS 12/12 Tul = 226,064 KG (4 dia 10 + dia 8 - 20)
4,221,510.00
84
1M3 PEKERJAAN BETON BALOK INDUK 20/60 Tul = 211,130 KG (8 dia 19 + 2 dia 12 + dia 10 - 15)
3,658,810.00
85
1M3 PEKERJAAN BETON BALOK ANAK 20/30 Tul = 109,000 KG (5 dia 12 + dia 8 - 15)
2,436,040.00
86
1 PASANG KUNCI PINTU BESAR
80,000.00
87
LANTAI KERAMIK 20/20 (1 m2)
40,000.00
88
1 M2 BATU AMPIG
87,420.00
89
PABRIKASI BAJA RINGAN
90,000.00
90
GENTENG BETON
16,500.00
91
RENG BAJA RINGAN
70,000.00
92
LIST PROFIL GYPSUM ( PABRIKASI )
93
Out le TV Braco Integra
70,000.00
94
Genteng Beton Plat
40,000.00
5,500.00 18,700.00
5,340.00
7,310.00 479,600.00
10,720.00
114,840.00
9,000.00
BILL OF QUANTITY PEMBANGUNAN RUMAH TINGGAL SATU LANTAI TYPE 40
No.
Uraian Pekerjaan
Sat
Volume
Harga Satuan (Rp.)
Jumlah Harga (Rp.)
1 I
2
3
4
5
6
II
PEKE PEKERJ RJAA AAN N PERS PERSIA IAPA PAN N 1 Pengukuran kembali (Site) 2 Pas. Bouwplank 3 Perat Perataa aan n Laha Lahan n (Strip (Striping ing)) 4 Pengadaan air bersih PEKE PEKERJ RJAA AAN N TANA TANAH H 1 Galian Tanah Pondasi Setempat 2 Gali Galian an Tana Tanah h Bias Biasa a Pond Pondas asii Mene Meneru rus s dan dan Slo Sloop ( bang bangun unan an utam utama a & pag pagar) ar) 3 Urugan Tanah Kembali 4 Urugan Pasir di Bawah Pondasi & Sloop
m2 m1 m2 ls
100.000 70.750 100. 100.00 000 0 1.000
1,430.00 13 13,940.00 1,59 1,590. 0.00 00 10 1 00,000.00
143,000.00 986,255.00 159,0 159,000 00.00 .00 100,000.00
Jumlah
1,388,255.00
m3 m3 m3 m3
12.000 34.2 34.215 15 11.554 1.804
19,500.00 15,5 15,510 10.0 .00 0 6,650.00 57,360.00 Jumlah
234,000.00 530,6 30,67 70.00 0.00 76,831.94 103,484.61 944,986.55
III III PEKE PEKERJ RJAA AAN N BET BETON ON 1 Pa Pas. Beton Lantai Kerja di Bawah Pondasi & Sloop 2 Pas. Cor Beton Sloof 15/20 3 Pas. Beton Kolom Struktur 15/20 4 Pas. Beton Kolom Praktis 15/15 5 Pas. Beton Ring Balk 15/20
m3 m3 m3 m3 m3
1.804 2.123 1.496 0.628 2.123
479,600.00 577,500.00 3,611,540.00 4,221,510.00 577,500.00 Jumlah
865,258.35 1,225,743.75 5,402,141.53 2,651,108.28 1,225,743.75 11,369,995.66
IV PEKERJAA PEKERJAAN N PASANGAN PASANGAN PONDASI,D PONDASI,DINDI INDING NG & PLESTERAN PLESTERAN 1 Pas. Pondasi Batu Kali 1 Pc : 5 Ps 2 Pas. Batu Kosong 3 Pas. Dinding Bata Biasa, 1 Pc : 5 Ps 4 Plesteran Dinding + Acian 1 : 5 5 Batu Tempel
m3 m3 m2 m3 m2
12.381 5.519 191.265 382.530 22.5
310,150.00 14 147,640.00 48,150.00 22,110.00 87,420.00 Jumlah
3,840,044.69 814,751.34 9,209,409.75 8,457,738.30 1,966,950.00 24,288,894.08
PEKERJAA PEKERJAAN N KUSEN KUSEN PINTU / JENDEL JENDELA A & KACA 1 Pa P as. Kusen Pintu / Jendela, Ky. Kamper samarinda/setara 2 Pa Pas. Daun Pintu Panel Papan Kayu samarinda 3 Pas. Daun Jendela Kaca, Kayu samarinda 4 Pas. Kaca Polos 5 mm 5 Pas. Pintu Ruangan
m3 m2 m2 m2 bh
0.572 8.015 1.943 6.249 4.000
6 Pas. Kunci Pintu Utama 7 Pas. Engsel pintu dan jendela 8 Pas. Slot Jendela
bh bh bh
1.000 15.000 10.000
V
VI PEKERJAA PEKERJAAN N LANTA LANTAII DAN DAN SANITAIR SANITAIR 1 Urugan Pasir di Bawah Lantai t = 5 cm 2 Pas. Pas. Lant Lantai ai keram keramik ik 30 x 30 cm, 3 Pa Pas. Lantai keramik wc/teras ukuran 20 x 20 cm 4 Pas, Lantai keramik carport 30 x 30 cm
5,611,650.00 297,820.00 145,310.00 78,370.00 60,000.00 80,000.00 13,200.00 9,900.00 Jumlah
PEKE PEKERJ RJAA AAN N KAM KAMAR AR MAN MANDI DI 1 1 set kloset duduk 2 1 set bak mandi
80,000.00 198,000.00 99,000.00 6,986,388.20
m3
2.20
57,360.00
126,192.00
m2 m2 m2
38.2 38.250 50 8.625 15.000
66,3 66,310 10.0 .00 0 40,000.00 69,640.00
2,536 2,536,35 ,357.5 7.50 0 345,000.00 1,044,600.00
Jumlah VII VII
3,210,424.97 2,386,878.39 282,366.39 489,718.46 240,000.00
4,052,149.50
bh bh
1.000 1.000
500,000.00 167,070.00
bh bh M' m1 Unit
1.000 4.000 22.000 17.000 1.000
15,000.00 27,000.00 11,000.00 7,000.00 500,000.00 Jumlah
15,000.00 108,000.00 242,000.00 119,000.00 500,000.00 1,651,070.00
VIII PEKERJAA PEKERJAAN N ATAP & LANGIT-LANG LANGIT-LANGIT IT 1 Pas. Konst Konst Kuda-ku Kuda-kuda da konstruk konstruksi si baja ringan ringan ( Pabrikasi Pabrikasi ) 2 Pas. Penutup Atap Genteng beton plat 6 Pas. Bumbungan Genteng beton 7 Pa Pas. List Plank 3/30 Kayu papan Borneo super 8 Pas. Pas. Rang Rangka ka Plafo Plafond nd (Grid (Grid 100 100 x 100) 100) 9 Pas. Plafond GYPSUM uk. 100 x 100 cm 10 Pas. List Profil 1 x 5 cm
m2 m2 m1 m1 m2 m2 m1
47.400 47.400 64.160 8.000 16.040 88.0 88.000 00 44.000 69.000
90,000 90,000.00 .00 40,000.00 41,270.00 14,530.00 29,65 29,650. 0.00 00 23,650.00 9,000.00 Jumlah
4,266,0 4,266,000. 00.00 00 2,566,400.00 330,160.00 233,061.20 2,609 2,609,20 ,200.0 0.00 0 1,040,600.00 621,000.00 11,666,421.20
IX PEKERJ PEKERJAAN AAN CAT DAN LABURA LABURAN N 1 Pengecatan kusen Pintu dan Jendela (3x) 3 Plituran Pintu Panel 4 Pengecatan Plafond Baru (3x)
m2 m2 m2
21.060 7.625 44.000
29,680.00 13,470.00 21,180.00 Jumlah
625,048.93 102,702.02 931,920.00 1,659,670.94
ttk bh bh
8.000 1.000 8.000
70,500.00 70,000.00 40,000.00 Jumlah
564,000.00 70,000.00 320,000.00 954,000.00
100000
100,000.00
Jumlah
100,000.00
3 Floor Drain 4 Kran Air 5 Saluran pembuangan air kotor Dia 3" 6 Saluran Air Bersih Pvc Dia 1/2" 7 Septictank & Resapan
X
XI
PEKERJ PEKERJAAN AAN INSTAL INSTALASI ASI LISTRI LISTRIK K 1 Pas. Titik Lampu + Instalasi 2 out le TV braco Integra 3 Pas. Armatur Stop Kontak + Instalasi
PEKE PEKERJ RJAA AAN N PEMB PEMBER ERSI SIHA HAN N
LS
1
500,000.00 167,070.00
0 0 0
0 0
100 70.75
1.5 0.48 11.554 0.03
12 34.215 1.804
2.123 0.17 0.07 2.123
1.5 0.63
0.18 0.08 20.64 5.738
12.381 5.519 38.250 11.48
1.86
14.88
0.04 8.01 6.53
0.07 0.4 1.66 8.19
44
2.2
2.44
211.905
5.54
191.265
#REF! 4.87 0.07
8.36 0.31
5.24 0.08
0.57
0.41 1.94
5.14 5.14
1.11 1.11
0.31 6.25
38.25 8.63 15
4.01 16.04
32.08
64.16
44 55 69
0.5
88
10.530 7.62
21.06
1.31 0.03
REKAPITULASI BILL OF QUANTITY (BOQ) PEMBANGUNAN RUMAH TINGGAL 1 LANTAI TYPE 40
No
ITEM PEKERJAAN
JUMLAH
REKAPITULASI BILL OF QUANTITY (BOQ) PEMBANGUNAN RUMAH TINGGAL 1 LANTAI TYPE 40
No.
ITEM PEKERJAAN
JUMLAH (Rp.)
1
2
3
I Pekerjaan Persiapan II Pekerjaan Tanah III Pekerjaan Beton IV Pekerjaan Pasangan Pondasi,Dinding & Plesteran V Pekerjaan Kusen Pintu/Jendela & Kaca VI Pekerjaan Lantai dan Sanitair VII Pekerjaan Kamar Mandi VII Pekerjaan atap & Langit-langit VIII Pekerjaan Cat dan Laburan IX Pekerjaan Instalasi Listrik
1,388,255.00 944,986.55 11,369,995.66 24,288,894.08 6,986,388.20 4,052,149.50 1,651,070.00 11,666,421.20 1,659,670.94 954,000.00
Jumlah A
64,961,831.13