Abstracto Ejercicios de giros en sentido horario y anti-horario 1. Giros de 90 grados 2. Giros de 180 grados 3. Giros en 270 grados 4. Giros de 60 grados 5. Giros de 210 gradosDescripción completa
La siguiente informacion se trata del metodo solidos totales. disueltos y suspendidos (standard methods )Descripción completa
soal latihan
Full description
SOAL GADAR A,B,C
j
Descripción completa
complejosDescripción completa
guyrf9flDeskripsi lengkap
Biomagnetismo consiste en la aplicación de imanes de una determinada polaridad y de igual fuerza en puntos específicos del cuerpo humano formando pares con el fin de restablecer el pH y, a t…Descripción completa
Full description
Learners Licence testFull description
Differences between all 1900 series
FISIKAFull description
API 570 Certification Prep API 578 Study Questions This following study aid helps you learn the content of API RP-578, Material Verification Prora! for "e# and $%istin Alloy Pipin Syste!s. Syste!s . There will be about 5 questions from this document on the API 570 exam. It is helpful to read through API 57 before wor!ing on this exercise"
#.
API 57 pro$ides guidelines for a quality assurance assurance system to $erify% A& all materials. '& all alloy materials. (& only non)ferrous materials. *& only high)alloy materials.
+.
,sually substituting an alloy for carbon steel would not cause a problem. -hich of the process ser$ices where substituting an alloy for carbon steel could result in a problem A& (austic/ amine and (hloride in ser$ice '& ydrogen sulphide/ hydrogen fluoride and sulphuric acid in ser$ice sca$engers and inhibitors in ser$ice (& (atalyst/ oxygen sca$engers *& 1one of the abo$e
2.
An alloy material is any metallic material that contains alloying elements that are added% A& only to impro$e mechanical properties. '& only to impro$e corrosion resistance. (& To impro$e impro$e either mechanical properties or impro$e corrosion resistance *& To impro$e the weldability of material
3.
Alloy components include/ pipe/ fittings/ plate/ flanges/ and 444444444444 needs PI A& 6al$es '& supports (& s!irt $essels *& all of the abo$e
5.
An inspection lot includes% A& all materials from same supplier. '& all materials included on the same purchase order. (& all materials of the same material type i.e. 2#8 99& *& all materials of the same material type from the same supplier and heat.
8.
A documented material $erification program should be established by the% A& Authori:ed inspector. '& ;wner<,ser. (& =epair organi:ation. *& >ngineering organi:ation. organi:ation.
7.
The material $erification program should co$er PI testing of materials% A. during during con constr struct uction ion of of piping piping system systems. s. '. in exi exist stin ing g pipi piping ng sys syste tems ms.. (. during during repair repairs s and and altera alteration tions s of piping piping systems. systems. *. in existing existing piping piping systems systems and during during constru construction ction// repairs and and alterati alterations ons of >. pip piping ing sy system stems. s.
-ho has the responsibility to determine the extent of PI performed A& Authori:ed inspector '& ;wner<,ser or his designee (& =epair organi:ation organi:ation. *& >ngineering organi:ation.
#0. -ho has the responsibility to $erify that the material $erification program program is properly implemented implemented A& Authori:ed inspector '& ;wner<,ser (& =epair organi:ation organi:ation. *& >ngineering organi:ation. ##. -ho has the responsibility to re$iew and appro$e the adequacy of the PI program used by fabricators and material suppliers A& Authori:ed inspector '& ;wner<,ser API 57 qui:
ohan =a@
Page # of 7
(& *&
=epair organi:ation >ngineering organi:ation
#+. A mill test report% A& >liminates the need for f urther material $erification. '& is a report showing material discrepancies. (& is an important part of the material qualify assurance program. *& is issued by the owner upon receipt of materials. #2. The material $erification program specified by API 57 co$ers% A& only pressure)containing components '& ;nly pipe/ and fittings. (& ;nly pipe/ fittings/ and welds. *& Pressure containing and non)pressure containing components. #3. *uring alloy welding% A& ;ne electrode from each box should be sampled. '& Two electrodes from each box should be sampled. (& ;ne or two electrode from each lot should be sampled as per inspector *& Two electrodes from each lot should be sampled. #5. If alloy elements& are contained in the flux of a welding electrode/ PI testing% A& is not necessary. '& is not necessary pro$ided appropriate documentation is pro$ided by the supplier. (& could be conducted on any of the production welds. *& could be conducted on a weld button prior to production welds. #8. 1ew longitudinal welded alloyed pipe should% A& ne$er be used. '& be used only if the uality Bactor is #.0. (& recei$e random PI testing of weld and base metal. *& recei$e #00C PI testing of weld and base metal. #7. -ho has the responsibility to determine the extent of PI testing required on existing piping systems A& Authori:ed inspector '& ;wner<,ser (& =epair organi:ation *& >ngineering organi:ation #. -hat are all the important factors to consider when prioriti:ing the need for PI on existing piping systems A& Di!ely hood of failure due to material mix up/ (onsequence of failure due to mix up/ The reason for alloy specification/ '& (& *&
historical in ad$ent of material substitution. All the failed items need to be PI chec!ed ;nly li!ely hood of failure due to material mix up and consequence of failure is high item shall be PI tested 1one of the abo$e
#?. Incorrect substitution of carbon steel is most li!ely to be found in% A& chrome steels. '& stainless steels. (& any ferritic steel. *& any non)ferrous. +0. -hich of the f ollowing piping components is most li!ely to ha$e a substitution with the wrong material A& A +0E length of 8 1P9 pipe '& -eld)nec! flange (& >xpansion @oint *& 'olting +#. -ho has the responsibility to determine the extent of PI testing required during repairs and alterations of piping systems A& Authori:ed inspector '& ;wner<,ser (& =epair organi:ation *& >ngineering organi:ation ++. Identification of materials by $isual stamps or mar!ings% A& is not an important part of the material $erification program. '& is not a substitute for PI testing. (& is important only on high alloy materials. *& should only be done by inspectors. +2. PI tools that use F)=ay fluorescence can A& carbon content. '& chrome content. (& iron content. API 57 qui:
not
detect%
ohan =a@
Page + of 7
*&
molybdenum content.
+3. ow does Portable ;ptical >mission 9pectrometry determine the elements in a material A& An electric arc causes a spectrum of light to be emitted from the tested material. The light is analy:ed. '& F)rays stri!ing the material cause a spectrum of x)rays to be emitted from the tested material. The x)rays are (& *& +5. PI testing A& '& (& *&
analy:ed. 9pecific chemicals deposited on the tested material cause a spectrum of colors to be emitted. The colors are analy:ed. The surface is polished and etched. A replication is preformed and is analy:ed with a microscope. equipment should be% calibrated e$ery 3 hrs. calibrated as specified by the manufacturer. used only by the manufacturerEs personnel. used by owner
+8. All personnel performing PI tests should be% A& qualified by national exam. '& qualified by the ownerngineering organi:ation
+. -hat is the A& '& (& *&
appropriate action to ta!e when an incorrect material is located during a PI sampling of new materials Inspect + more items from the inspection lot. Inspect 50C of the items from the inspection lot. Inspect #00C of the items from the inspection lot. Inspection all items supplied by that manufacturer.
+?. ar!ing pens should not contain% A& (arbon. '& (hrome. (& ;xides. *& 9ulfur. 20. -hat are all the material excluded from PI in new or old piping A& All non ferrous materials and components '& (arbon steel materials and components (& All weld metal alloys *& All alloy steel material and components 2#. -hile establishing material $erification programme A& =oles and responsibility of the PI programme shall be documented '& Authori:ed inspector has the total responsibility (& =oles and responsibility that each group has within the specific organi:ation within the operating plant/ or the shop of *&
the contractor/ $endor or fabricator& shall be documented =oles and responsibility of fabricator and PI person shall be documented
2+. The specified percentage of the number of components or weldment to be examined in an inspection lot A& 9ampling examination '& Added examination (& 9elected examination *& De$el of examination 22. ;ne or more item selected at random from the inspection lot that are to be examined to determine acceptability A& is representati$e sample '& =andom sampling (& Progressi$e sampling *& 9pot sampling 23. *emonstrating test instrument accuracy and reliability -ith a sample materials for which laboratory chemical analysis data are a$ailable
A& '& (& *&
is called is called is called is called
referred material standard reference material traceable material uniform testing standard
25. -hat decides the extent of testing up to #00C examination is for A& All high pressure system API 57 qui:
ohan =a@
Page 2 of 7
'& (& *&
;nly for (ategory G*E ser$ice fluid ser$ice igh ris! systems >xcluding 1ormal fluid ser$ice
28. Dower li!elihood of nonconformance can be expected for the system which undergoes A& non $igorous procedure of $erification programme '& less $igorous procedure of $erification programme (& igh $igorous procedure of $erification programme *& 1one of the abo$e 27. PI testing within warehouse should not be considered an alternati$e to A& PI testing of the fabricated piping system when testing is not specified '& PI testing of the fabricated piping system when testing is specified (& PI testing recommended for fabricated piping system *& 1one of the abo$e 2. It is important that repair procedures include consideration of PI testing A& As part of obtaining satisfactory repair '& As part of obtaining satisfactory result (& As part of sound quality repaired weld metal *& as part of obtaining satisfactory materials to be used for repair 2?. The principle of operation is that one or more gamma rays to excite materials under analysis is A& Portable ;ptical emission spectrometry method '& Portable F)ray fluorescence method (& Portable Alloy analy:er *& Portable F)ray spectrometer 30. An accuracy of typically much higher than normally needed for PI testing is achie$ed by A& ;ptical emission spectrometry '& F)ray emission spectrometry (& -et chemical analysis *& All of the abo$e 3#. =eagents dropped onto the sample on a moisture filter paper/ distinct colors that are indicati$e of the presence of specific elements in the sample tested is A& (alled (hemical spot testing in which material is remo$ed physically and depositing it onto moistened filter paper '& (alled PI test method of chemical laboratory analysis (& (alled chemical resisti$ity testing *& (alled F)ray fluorescence testing
3+. A heated @unction of dissimilar metal is created when the A& PI test equipment in contact with material '& eated probe and the metal being tested are in contact each other is called resisti$ity testing. (& eat is transferred into electrical signal by a thermocouple *& 1one of the abo$e 32. Techniques such as eddy)current sorters/ electromagnetic alloy sorter/ triboelectric ferret meters&
testing de$ices and thermoelectric tests A& Are also quiet extensi$ely used for regular PI li!e other methods '& Are used only when other PI methods not a$ailable or possible (& Are qualitati$e and as such may only be appropriate for limited sorting applications and not for specific alloy identification *& Are the techniques are ha:ardous to health
33. -hen component composition is desired A& The owner
API 57 qui:
ohan =a@
Page 3 of 7
37. PI testing indicates alloying elements are outside the ranges indicated in the material specification/ the owner
3. The owner
PI test procedure PI test report PI test result process detail
5+. -hen included in the owner
qualification. The documents li!e drawing/ physical mar!ing traceability to owner to identify the tested material 'oth A H ' The shop should follow only manufacturer testing procedure
58. A piping system has not recei$ed PI is relocated/ the ;wner
5. All information shall be listed in a 444444444444444 and it shall be traceable to 4444444444444444444 A& PI test procedure and the equipment shall be traceable to 1ational standard '& PI test report and the equipment shall be traceable to 1ational standard API 57 qui:
ohan =a@
Page 5 of 7
(& *&
PI test report/ the point of particular items installation shall be traceable PI test procedure and the equipment shall be traceable to the installation location
5?. A document which carries information li!e date of testing/ procedure number/ re$ision/ instrument 9r./ instrument name/ name of person H the company which does the wor!/ results of the test etc./ is called A& PI test procedure '& A PI test report (& PI test chec! list *& PI test criteria
80. A semi permanent paint mar!ing system is applied A& -hether or not the mar!ing system is only temporary to facilitate to proper handling and identification from the point of PI '& (& *&
testing to final installation To a$oid mix up of tested items To identify the tested items To identify and segregate the tested items
8#. Item which are of non confirming the material requirement including those left in ser$ice A& 9hall be recorded for future replacement '& 9hall be recorded for any future reference (& shall be recorded with the basis and action for resol$ing is mentioned in the test record *& 9hall be recorded to ha$e them chec! for their performance in the future