In any processor the major units are Control Unit, ALU and Memory read write. Among these units the performance of any processor majorly depends on the time taken by the ALU to perform the s…Full description
E//2G Ericsson Optimization Process Flow
weekly
Template of Weekly Progress Report ProjectFull description
Full description
Thesis Progress Report SampleFull description
civil, constructionFull description
wala lang
Economic Progress report I created for my Macroeconomics 2 class, recieved 100% for the report. Hope it helps!
Weekly Progress Report June25
Final Year Progress Report Sample for Diploma StudentFull description
Full description
Daily Progress Report(7)
Falaj Al Qabail Interchange - Monthly Progress Report for February 2015
• Introduction • HO failure • Move Traffic to Underlaid • re!uency change • Add neighbours
The ob"ective of this re#ort is to trac$ the #rogress of %& rollout 'orst cell During the #revious 'ee$s( many #roblematic and lo') #erformance cells 'ere monitored and investigate* The #roblematic cells 'ere e+tracted on 'ee$ly basis( analysed and then the necessary actions 'ere ta$en( 'hich in turn im#roved the statistical #erformance ( as can be seen s een belo'
HO failure: Ma$e the HO difficult 8y increasing I2T34/355H67T or MI2O73T I2T34/355H67T : Inter)cell HO Hysteresis 9'hen 'e have HO ailure due t o 8ad uality; MI2O73T: Minimum receive level offset* An M7 can be handed over t o a neighbouring cell only 'hen the do'nlin$ level of the neighbouring cell is greater than the sum of
After After increa increase se I2T34/3 I2T34/355H 55H67 67T T and MI2O7 MI2O73T 3T HO failur failure e is decrea decrease se
the HO74 and Dro# are im#roved in ,-%./
Move Traffic to Underlaid
8ecause the Overlaid is suffer from high dro# It recommended to move the traffic to Underlaid 8y 8y changing these #arameters UtoO HO 4eceived 5evel Threshold from %= to 0, OtoU HO 4eceived 5evel Threshold from %1 to %=