METHOD STATEMENT FOR TESTING AND COMMISSIONING OF ELECTRICAL PANELS. (MDBs, MCCs, CAPACITOR BANKS, EMDBS, SMDBs, ESMDBs & VFD PANELS)
TABLE OF CONTENTS
Item Description
1.0 Scope. 2.0 2.0 Refe Refere renc nces es.. 3.0 3.0 Acce Access ss / Egre Egress ss 4.0 Healt Healthh &Safet &Safetyy Hazard Hazardss 4.1 Safety Safety Rules Rules during during Testing. Testing. 4.2 Safety Safety Lighti Lighting. ng. 4.3 4.3 Task Task Ligh Lightiting ng 4.4 Emerge Emergency ncy Arrangem Arrangemen ents. ts. 4.5 Risk Risk and and Contro Controls. ls. 5.0 Abbreviat Abbreviations ions and Definition Definitions. s. 6.0 Roles/Re Roles/Respons sponsibili ibilities/ ties/Comp Competen etence. ce. 7.0 Testing Testing and and Commissio Commissioning ning Proced Procedures. ures. 7.1 Attachmen Attachmentt 1- Method Method of Commission Commissioning: ing:
8.0 8.0 Trai Traini ning ng.. 9.0 9.0 Wo Worki rking ng Hou Hours rs.. 10.0Manpower 10.0 Manpower Requirement Requirement and Supervision. 11.0Test 11.0 Test Instruments Requirements. Requirements. 12.0Requirements. 12.1General Requirements. Requirements. 13.0Personnel 13.0 Personnel Equipment. Equipment. 14.0Supporting 14.0 Supporting Information. Information. 15.0Distribution 16.0Other information
1
CONTRACTOR: MACAIR / DOC.NO:MSREV: DATE : 03/02/2011
METHOD STATEMENT FOR TESTING AND COMMISSIONING OF ELECTRICAL PANELS. (MDBs, MCCs, CAPACITOR BANKS, EMDBS, SMDBs, ESMDBs & VFD PANELS)
17.0Attachments 17.1Method of Commissioning : MDBs, MCCs, EMDBs & Capacitor Banks 17.2Method of Commissioning : SMDBs, ESMDBs &DBs. 17.3Method of Commissioning: VFD Panels. 17.4Calibration Certificates. 17.5Risk Assessment. 17.6Test Reports.
2
CONTRACTOR: MACAIR / DOC.NO:MSREV: DATE : 03/02/2011
METHOD STATEMENT FOR TESTING AND COMMISSIONING OF ELECTRICAL PANELS. (MDBs, MCCs, CAPACITOR BANKS, EMDBS, SMDBs, ESMDBs & VFD PANELS)
1. 0
CONTRACTOR: MACAIR / DOC.NO:MSREV: DATE : 03/02/2011
SCOPE
This Procedure Covers the Testing and Commissioning of Electrical Panels in the DUCAB HV & EHV Facility. The MDBs, EMDBs and Capacitor banks are installed at the LV rooms, while MCC Panels are at VCV Tower roof, CCV Tower roof, EHV Test lab electrical room , Chiller plant area and mechanical plant room. EMCCs are located at VCV Tower roof, CCV Tower roof and Administration office first Floor. ESMDBs are installed at Factory area and VCV Tower electrical room (Ground floor). SMDBs and DBs are installed at all areas in the project as indicated on the service drawings. This procedure will also ensure proper workmanship and conforms to Contract documents, manufacturer’s instructions and standards.
2 .0
REFERENCES 2.1 2.2 2.3 2.4
3 .0
Approved MACAIR Shop Drawings for Power layout. (Ref: Ducab KB644/SD- 00107, 00108, 00161-00170, 00174-00176, 00187-00199, 00203, 01027,01324,01325 & 01485). MACAIR Project Quality Plan. MACAIR Safety Manual Manufacturer’s recommendations.
ACCESS /EGRESS The Commissioning of the System will commence only when Main Contractor clearance is given for access to conduct the Testing and Commissioning.
4 .0
HEALTH & SA SAFETY HA HAZARDS Health and Safety procedures by Main Contractor and MACAIR will be implemented for this job. A routine safety check will be done by the Safety Officer In-charge as per MACAIR Safety Procedure. 4.1
Safety Rules During Commissioning In order to ensure safe conditions during testing the following rules have to be followed: 4.1.1 4.1.1 Person Personss engaged engaged with with this comm commissi issioni oning ng are exper experien ienced ced and and have recei received ved prope properr and adequate training related to procedures and test equipment utilized for the particular testing activity. 4.1.2 4.1.2 Test Test instrum instrument entss and test test leads leads should should be maint maintain ained ed in a safe safe conditi condition on and the the test test methods not to create danger either for the operator or for other persons.
4.2
Safety Lighting Safety Lights will be used in case of power failure ensuring good illumination at the working area to aid evacuation if necessary.
3
METHOD STATEMENT FOR TESTING AND COMMISSIONING OF ELECTRICAL PANELS. (MDBs, MCCs, CAPACITOR BANKS, EMDBS, SMDBs, ESMDBs & VFD PANELS)
4.3
CONTRACTOR: MACAIR / DOC.NO:MSREV: DATE : 03/02/2011
Task Lighting Adequate lighting shall be provided to ensure good illumination at the working area.
4.4
Emergency Arrangements 4.4.1
General: Site Safety procedures procedures will be followed followed and in case of any emergency, Safety Officer will administer the emergency arrangements as per the system, stop work and report to nearest Assembly Point, etc. Safety Officer Name : Mr. Reghupathy, (Con # 0559262923)
4.4.2
Fire Precautions: No significant fire risks associated with this activity but general fire precaution measures will be taken. Communication: Via mobile phones issued to all engineers. engineers.
4.4.3 4.5
Risk and Controls 4.5.1 4.5.1 4.5.2
5.0
ABBREV EVIIATIONS & DEFINI INITIONS MC PM PE PE SO QA/QC
6.0
Please Please refe referr to the the Risk Risk Asse Assessm ssment ent attach attached ed in in Secti Section on 17.6 17.6 Environmen Environmental tal conside consideratio rations: ns: There There are no no waste waste materi materials als associa associated ted with this activity. activity.
- Main Contractor (MACAIR) - Project Manager (MACAIR) - Project Engineer (MACAIR) - Project Engineer (Prime Electrical) - Safety Officer (MACAIR) - Quality Assurance/Quality Control (MACAIR)
ROLES/RES /RESP PONSIBI IBILTY /COMPETE ETENCE 6.1
PM - will have the overall responsibility of the Project for execution, quality quality and safety, maintain the planning and progress and and coordination with Main Main Contractor.
6.2
PE - will be responsible for day to day day activities in the Site for System Testing and Commissioning, Commissioning, report preparation and demonstration of System System Commissioning.
6.3
PE (Prime Electrical) - will be directly responsible for the System commissioning.
6.4
SO - will be responsible for Health and Safety aspects in the Site in line with Main Contractor Safety requirements.
4
METHOD STATEMENT FOR TESTING AND COMMISSIONING OF ELECTRICAL PANELS. (MDBs, MCCs, CAPACITOR BANKS, EMDBS, SMDBs, ESMDBs & VFD PANELS)
6.5
CONTRACTOR: MACAIR / DOC.NO:MSREV: DATE : 03/02/2011
QA/QC - will oversee the quality requirements and quality control measures for the Project.
7.0 TES TESTIN TING G AND COMMIS COMMISSION SIONING ING PROC PROCEDU EDURES RES
Please refer to the attachments as follows;
8 .0
9 .0
7.1
Method of Commissioning : MDBs, MCCs & EMDBs.
7.2
Method of Commissioning : Capacitor Banks Banks
7.3
Method of Commissioning : SMDBs, ESMDBs &DBs.
7.4
Method of Commissioning: VFD Panels.
7.5
Calibration Certificates.
7.6
Risk Assessment.
7.7
Test Reports.
TRAINING 8.1
Engineers who will conduct the Commissioning shall have the experience in System Commissioning.
8.2
Tool Box talks will provide general training and awareness for each activity and also undergo further training by the Quality Assurance Department.
WORKING HOURS Site Normal Working Hours.
10.0 10.0
MANP MANPOW OWER ER REQU REQUIR IREM EMEN ENT T & SUP SUPER ERVI VISI SION ON PM PE PE SO QA/QC
11.0 11.0
- Project Manager (MACAIR) - Project Engineer (MACAIR) - Project Engineer (Prime Electricals) - Safety Officer (MACAIR) - Quality Assurance/Quality Control (MACAIR)
TEST TEST INST INSTRU RUME MENT NT REQU REQUIR IREM EMEN ENT T The following Test Instruments will be used for the Commissioning of the Electrical Panels. They will be selected as having the maximum field measuring accuracy and being the best suited to the function being measured and will be applied as recommended by the manufacturer.
5
METHOD STATEMENT FOR TESTING AND COMMISSIONING OF ELECTRICAL PANELS. (MDBs, MCCs, CAPACITOR BANKS, EMDBS, SMDBs, ESMDBs & VFD PANELS)
11.1
CONTRACTOR: MACAIR / DOC.NO:MSREV: DATE : 03/02/2011
Test Instruments 11.1.1
Megger.
11.1 11.1.2 .2 High High Pot Pot Tes Teste ter. r.
1 1 .2
12 . 0
11. 11.1.3 1.3
Torq Torque ue wre wrenc nchh
11. 11.1.4 1.4
Mul Multime timetter
Calibration 11.2.1 11.2.1
All Instrumen Instruments ts used shall shall carry current current calibrat calibration ion certifica certificates. tes. Calibrat Calibration ion periods periods for all instruments are recommended by the manufacturer and are in line with the requirements of the Commissioning Specialist Association.
11.2.2 11.2.2
Certificat Certificates es shall be availab available le for presentat presentation ion prior to to commenceme commencement nt of commission commissioning. ing.
REQUIREMENTS 1 2 .1
General Requirements Before commencing commissioning works, the following information /items will be made available. 12.1.1 12.1.1 System System is fully fully inst install alled ed and and pre-te pre-teste sted. d. 12.1.2 12.1.2 All equipm equipment ent are availa available ble at site site..
13 . 0
PERSONNEL EQU EQUIPMENT 13.1
14.0 14.0
15 . 0
16 . 0
All Commissioning Engineers and Technicians shall have the necessary Personnel Protective Equipment such as Safety Shoes and and Helmet. Helmet.
SUPP SUPPOR ORT TING ING DOCU DOCUME MENT NTAT ATIO ION N 14.1
Approved Inspection of 1st Fix Installation.
14.2
Approved Inspection of 2nd Fix Installation.
14.3
Approved Inspection of Final Fix Installation
DISTRIBUTION 15.1
Main Contractor
15.2
Consultant.
15.3
MEP Senior Mechanical Engineer.
15.4
Health and Safety Officer.
OTHER INFORMATION
6
METHOD STATEMENT FOR TESTING AND COMMISSIONING OF ELECTRICAL PANELS. (MDBs, MCCs, CAPACITOR BANKS, EMDBS, SMDBs, ESMDBs & VFD PANELS)
Not applicable for this activity.
17 . 0
ATTACHMENTS
17.1
Method of Commissioning : MDBs, MCCs & EMDBs
17.2
Method of Commissioning : Capacitor Banks
17.3
Method of Commissioning : SMDBs, ESMDBs &DBs.
17.4
Method of Commissioning: VFD Panels.
17.5
Calibration Certificates.
17.6
Risk Assessment.
17.7
Test Reports.
7
CONTRACTOR: MACAIR / DOC.NO:MSREV: DATE : 03/02/2011
METHOD STATEMENT FOR TESTING AND COMMISSIONING OF ELECTRICAL PANELS. (MDBs, MCCs, CAPACITOR BANKS, EMDBS, SMDBs, ESMDBs & VFD PANELS)
ATTACHMENT 17.1
Method of Commissioning: MDBs, MCCs, EMDBs
8
CONTRACTOR: MACAIR / DOC.NO:MSREV: DATE : 03/02/2011
METHOD STATEMENT FOR TESTING AND COMMISSIONING OF ELECTRICAL PANELS. (MDBs, MCCs, CAPACITOR BANKS, EMDBS, SMDBs, ESMDBs & VFD PANELS)
ATTACHMENT 17.2
Method of Commissioning: Capacitor Banks
9
CONTRACTOR: MACAIR / DOC.NO:MSREV: DATE : 03/02/2011
METHOD STATEMENT FOR TESTING AND COMMISSIONING OF ELECTRICAL PANELS. (MDBs, MCCs, CAPACITOR BANKS, EMDBS, SMDBs, ESMDBs & VFD PANELS)
ATTACHMENT 17.3
Method of Commissioning: SMDBs, ESMDBs &DBs.
10
CONTRACTOR: MACAIR / DOC.NO:MSREV: DATE : 03/02/2011
METHOD STATEMENT FOR TESTING AND COMMISSIONING OF ELECTRICAL PANELS. (MDBs, MCCs, CAPACITOR BANKS, EMDBS, SMDBs, ESMDBs & VFD PANELS)
ATTACHMENT 17.4
Method of Commissioning: VFD Panels
11
CONTRACTOR: MACAIR / DOC.NO:MSREV: DATE : 03/02/2011
METHOD STATEMENT FOR TESTING AND COMMISSIONING OF ELECTRICAL PANELS. (MDBs, MCCs, CAPACITOR BANKS, EMDBS, SMDBs, ESMDBs & VFD PANELS)
ATTACHMENT 17.5
Calibration Certificate
12
CONTRACTOR: MACAIR / DOC.NO:MSREV: DATE : 03/02/2011
METHOD STATEMENT FOR TESTING AND COMMISSIONING OF ELECTRICAL PANELS. (MDBs, MCCs, CAPACITOR BANKS, EMDBS, SMDBs, ESMDBs & VFD PANELS)
ATTACHMENT 17.6
Risk Assessment
13
CONTRACTOR: MACAIR / DOC.NO:MSREV: DATE : 03/02/2011
METHOD STATEMENT FOR TESTING AND COMMISSIONING OF ELECTRICAL PANELS. (MDBs, MCCs, CAPACITOR BANKS, EMDBS, SMDBs, ESMDBs & VFD PANELS)
ATTACHMENT 17.7
Test Reports
14