ANALISA SNI TURAP 1 M2
MEMB MEMBER ERS SIHKA IHKAN N LAP LAPANGA ANGAN N DAN DAN PE PERA RATA TAAN AN (RSN (RSNII-T1 T122-20 2002 02))
TENAGA
Pekerja
Mandor
0.1000
OH OH
0.0500
OH
55,000.00
5,500.00
-
5,500.00
SUB TOTAL
-
JUMLAH
5,500.00
DIBULATKAN
5,500.00
1M
PENGUK NGUKU URAN RAN DAN DAN PEMAS MASANGAN NGAN BOWPLAN LANK (RS (RSNI-T12-2 12-200 002) 2)
TENAGA
Pekerja
0.1000
OH OH
55,000.00
5,500.00
Tukang Kayu
0.1000
OH OH
60,000.00
6,000.00
Kepala Tukang
0.0100
OH
-
-
Mandor
0.0050
OH
-
-
JUMLAH
11,500.00
DIBULATKAN
11,500.00
1 M3
GALIAN TANAH BIASA SEDALAM 1 M (SNI. 2008)
TENAGA
Pekerja
0.7500
OH OH
55,000.00
Tukang
-
OH OH
60,000.00
-
OH
-
-
0.0250
OH
-
-
Kepala Tukang Mandor
-
41,250.00
SUB TOTAL
1 M3
41,250.00
URUGAN KEMBALI (SNI. 2008)
-
1 M3
MEMBUAT 1 M3 LANTAI KERJA BETON MUTU f’c = 7,4 MPa
TENAGA
Pekerja
1.2000
OH
55,000.00
66,000.00
Tukang batu
0.2000
OH
60,000.00
12,000.00
Kepala Tukang
0.0200
OH
-
-
Mandor
0.0600
OH
-
78,000.00
SUB TOTAL
-
JUMLAH
78,000.00
DIBULATKAN
78,000.00
1 M3
MEMBUAT PEDESTAL BETON MUTU f'c= 19,3 Mpa ( K = 225),SLUMP (12 ± 2)cm (SNI. 20
TENAGA
Pekerja
1.6500
OH
55,000.00
90,750.00
Tukang batu
0.2750
OH
60,000.00
16,500.00
Tukang Kayu
1.6500
OH
60,000.00
99,000.00
Kepala Tukang
0.0280
OH
-
-
Mandor
0.0830
OH
-
206,250.00
SUB TOTAL
-
JUMLAH
206,250.00
DIBULATKAN
206,250.00
1 M3
Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting)
TENAGA
Pekerja
5.3000
OH
55,000.00
291,500.00
JUMLAH
504,850.00
DIBULATKAN
504,850.00
1 M3
Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting)
TENAGA
Pekerja
7.0500
OH
55,000.00
387,750.00
Tukang batu
0.2750
OH
60,000.00
16,500.00
Tukang Kayu
1.6500
OH
60,000.00
99,000.00
Tukang Besi
2.1000
OH
60,000.00
126,000.00
Kepala Tukang
0.4030
OH
-
-
Mandor
0.3530
OH
-
-
SUB TOTAL
629,250.00
-
JUMLAH
629,250.00
DIBULATKAN
629,250.00
1 M3
Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting)
TENAGA
Pekerja
6.3500
OH
55,000.00
349,250.00
Tukang batu
0.2750
OH
60,000.00
16,500.00
Tukang Kayu
1.6500
OH
60,000.00
99,000.00
1 M3
Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting)
TENAGA
Pekerja
5.3000
OH
55,000.00
291,500.00
Tukang batu
0.2750
OH
60,000.00
16,500.00
Tukang Kayu
1.3000
OH
60,000.00
78,000.00
Tukang Besi
1.0500
OH
60,000.00
63,000.00
Kepala Tukang
0.2620
OH
-
-
Mandor
0.2650
OH
-
449,000.00
SUB TOTAL
-
JUMLAH
449,000.00
DIBULATKAN
449,000.00
1 M2
PASANGAN BATA MERAH TEBAL 1 BATA (1:3) (SNI. 2008)
TENAGA
SUB TOTAL
Pekerja
0.6000
OH
55,000.00
33,000.00
Tukang
0.2000
OH
60,000.00
12,000.00
Kepala Tukang
0.0200
OH
-
-
Mandor
0.0300
OH
-
45,000.00
-
JUMLAH
45,000.00
DIBULATKAN
45,000.00
Mandor SUB TOTAL
0.0100
OH
-
17,000.00
-
JUMLAH
17,000.00
DIBULATKAN
17,000.00
8)
PEKERJAAN TURAP BETON PENAHAN TANAH BAGIAN BELAKANG BANGUNAN NO URAIAN PEKERJAAN
SAT
1 Pek. Pembersihan lokasi 2 Pek. Pas Bowplank 3 Pek. Galian Pondasi 4 Pek. Urugan pasir bawah pondasi 5 Pek. Cor lantai kerja 6 Pek. Cor tapak pondasi 7 Pek. Pedestal pondasi 8 Pek. Pondasi bata pas 1 batu camp 1:3 9 Pek. Plesteran pondasi bata camp 1:2 10 Pek. Sloof beton bertulang 15/20 11 pek. Kolom beton bertulang 20/20 12 pek. Plat dinding turap beton bertulang tebal 10 cm 13 pek. Balok atap turap beton bertulang 15/20 14 pek. Plat lantai atas beton bertulang tebal 10 cm 15 pek. Acian balok dan kolom
m2 m1 m3 m3 m2 m3 m3 m2 m2 m3 m3 m3 m3 m3 m2
VOL 200 100 63.23 2.46 24.62 4.02 1.31 64.6 129.19 2.77 1.64 5.54 2.77 20.1 130.21
HARGA SATUAN JUMLAH 5,500.00 11,500.00 55,000.00 16,500.00 78,000.00 449,000.00 206,250.00 45,000.00 25,500.00 504,850.00 629,250.00 449,000.00 548,750.00 449,000.00 17,000.00
Sub Total
1100000 1150000 3477650 40590 1920360 1804980 270187.5 2907000 3294345 1398434.5 1031970 2487460 1520037.5 9024900 2213570 33,641,485
harga per meter
336,415