Rev.1 45 46 47 X 48 X 49 X 50 X 51 X 52 X 53 X 54 X 55 X 56 X 57 X 58 X 59 X 60 X 61 X 62 X 63 X 64 X 65 X 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES PAGE
Rev.2 X X X X X
Rev.3
Rev.4
INSPECTION & TEST PLAN FOR ELECTRICAL
Job No. : 99012 Doc No. : INSP 99012 999
Page : 3/23
8700 0004
Rev. 4
CONTENTS A. EARTHING AND LIGHTNING INSTALLATION ----------------------------------------
PAGE 4
B. CABLE LADDER INSTALLATION ---------------------------------------------------------
PAGE 6
C. CABLE INSTALLATION ----------------------------------------------------------------------
PAGE 8
D. EQUIPMENT INSTALLATION --------------------------------------------------------------
PAGE 11
E. LIGHTING AND SMALL POWER INSTALLATION -----------------------------------
PAGE 18
F. HEAT TRACING INSTALLATION ---------------------------------------------------------
PAGE 20
G. CATHODIC PROTECTION INSTALLATION -------------------------------------------
PAGE 22
H. TELECOMMUNICATION INSTALLATION ---------------------------------------------
PAGE 23
NOTE : COMPANY reserves the right to increase surveillance from SW to W and from W to H depending on results of site surveillance activities. COMPANY shall be notified of inspection points by CONTRACTOR at least 3 days in Advance of the Activity
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
INSPECTION & TEST PLAN FOR SITE
SUBCON
ELECTRICAL
ITP No.
:
Rev. No.
DESCRIPTION OF WORK : Earthing and Lightning Installation
NO.
DESCRIPTION OF INSPECTION / TEST
A
EARTHING AND LIGHTNING INSTALLATION
1
Material Verification(Receiving Inspection)
APPLICABLE SPEC. OR PROCEDURE
REPORTING FORMAT
RP 5561V 999 1630 029
QP 550 002
Verify the Material Type/Size/Quantity Check the Damage
PP 99012 999 0001 550
Review the Test Report
1.2
4
PAGE
4 OF 23
PARTICIPATION BY SUBCON
HDEC/ TPA
COMPANY
-
SW
SW
-
SW
SW
-
R
R
Earthing Installation
RP 5561V 999 1620 001
Cable Type/Size
Related DWG
W
SW
SW
Location & Routing
SP-COM-511
W
SW
SW
Bolts and Nuts Tighting
Related STD : IEC 364
W
SW
SW
W
SW
SW
Compression Type Connection 1.1
INSP 99012 999 8700 0004
CPX26
REMARK
1.3 2 2.1 2.2 2.3 2.4
LEGEND :
R : Review
SW : Spot Witness
W : Witness H : Hold FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
INSPECTION & TEST PLAN FOR SITE
SUBCON
ELECTRICAL
ITP No.
:
Rev. No.
DESCRIPTION OF WORK : Earthing and Lightning Installation
NO.
DESCRIPTION OF INSPECTION / TEST
APPLICABLE SPEC. OR PROCEDURE
REPORTING FORMAT
INSP 99012 999 8700 0004
PAGE
4 5 OF 23
PARTICIPATION BY SUBCON
HDEC/ TPA
COMPANY
REMARK
3
Test RP 5561V 999 1620 001
Continuity Test
TPX26
Earthing Resistance Test
W
SW
SW
H
W
W
3.1 3.2
LEGEND :
R : Review
SW : Spot Witness
W : Witness
H : Hold FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
Cable connection/bonding Related DWG Test Box, Reference Electrode, etc Vendor spec Electrical test - Loop resistance for anode cable - Potential test for reference cell 1.1 1.2
SP-COM-511
TPX33
REMARK
1.3 2 2.1 2.2 2.3 3
LEGEND :
R : Review
SW : Spot Witness
W : Witness
H : Hold FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
INSPECTION & TEST PLAN FOR SITE
SUBCON
ELECTRICAL
ITP No.
:
Rev. No.
DESCRIPTION OF WORK :
PAGE
Telecommunication Installation NO.
DESCRIPTION OF INSPECTION / TEST
APPLICABLE SPEC. OR PROCEDURE
REPORTING FORMAT
INSP 99012 999 8700 0004
4 23 OF 23
PARTICIPATION BY SUBCON
HDEC/ TPA
COMPANY
REMARK
H
TELECOMMUNICATION INSTALLATION Above item is separated from ITP for electrical. ITP for telecommunication will be issued later.