CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS P FACILITY 1,2,3,4 AL-KHAFJI
item no
Contractor:
INSPECTION & TEST PLAN INSTALLATION OF CONC. MASONRY UNIT MAU Contract No:HQ807 PC 09
Process Description
Inspection And Test Point
1.0 Material Control 1.1. Approval for Concrete Block
Applicable Code or Standard 09-SAMSS-018
Acceptance Criteria Proj.Spec. 04300
1.2 Check staging area sizes and loadbearing schedule of concrete masonry blocks 2.0
Pre Mixing Delsgn mix ofmortar/grout mixses
2.1
Approval to desingmix of mortar / grout mixes
Approval of premarkation ( Layout Plan) prior to Pre Markation for start of any wall masonary units 3.0 Masanory Unit 4.0
5.0
Application
4.1 Check surfaces of flooring and wall to receive the work of any defects
Dis
" ASTM-C-270 ASTM-C-476 ASTM-C-90 KJO Spec.
"
KJO Spec.
"
SAES-M-100
"
4.2 Check masonry installed aligned bond pattern and finish acceptable
"
4.3 Check reinforcement bars placed in accordance with the construction drawing and specification
"
4.4 Check pre-fabricated elements and wall ties installed in accordance with the specification
"
4.5 Check placement of concrate mortar on required masonry block 4.6 Check levelnes and plumbness of block laying 4.7 Masonry block cells filled with grout and acceptable 4.8 Extra mortar to be cleaned 4.9 Clean concrete surfaces of foreign matter with clean water 4.10 Check thickness of scratch brown and finish coats for external walls 4.11 Practicable cured finish coat must be moisten SAES-Q-001 for a min period of 48 hours. 5.1 Work must be completed prlor to handover to next work Must have variation of true flatness (3mm " in 3mtr)
I = Inspect or perform work WI= 100% witness
W = Random if inspector did not show proceed
R= Review / Approve records document
S=Survellance
H= Hold point
" " " " " " " "
RFI= Issuued for H &
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS P FACILITY 1,2,3,4 AL-KHAFJI
İtem No
INSPECTION & TEST PLAN CONCRETE STRUCTURE Contractor: MAU Contract No:HQ807 PC 09 Process Description İnspection and Test Point
3.0
Placement Pouring of concrete
3.1 Check truck ticket required mix desing slump end time intervals
Dis Applicable Code or Standard A) SAES-Q001 Section 13.0 Section 8.0/ ACI 301-304 318 B)ASTMC-94 10.7 KJO Spec.
A)SAES-Q3.2 Conduct slump test conc. Temperature reading 001 Section and sampling for compressive stregth test 6 samples 18.0/ for every 50 cu.m KJO Spec. 3.3 Check method of placament and movement of concrate 3.4 Check finishes of formed surfaces
4.0
4.1 Check methot of wet curing by placing wet purlab over the precitable drled concrate and coninously wet for atleast 7 days or as approved by Concrete Curing clent KJO/SCEC repsentative
5.1 Bearn sides form columns and walls can only Form Dismantling be removed al the min of 24 hours Bearn soffits 5.0 slabs that required support can only be removed Aftercuring after attalning 70% of desing strenght 5.2 Surfece repair should be done Immedlatey 6.1 After Practicable curing and befors backfill apply two coats of cols tar or bitumen casting on 6.0 Protective Coating surfacesof concrate directly exposed to earth
7.0 Work Acceptence
7.1 All work must be completed prior to hand over to next work
A)SAES-QC01 section 8,0/ KJO Spec. KJO Spec.
Acceptance Criteria
Spec sec03300
Pfoj. Spec. Sec. 03300
Spec sec03300
A) SAE8-Q001 section 10.0 ACI 308 Section 3.2.2 ACI 305 R/ KJO Spec
"
A) SAES Q001 section 8.0 KJO Spec.
"
ACI 503.2 KJO Spec.
"
A) SAES-Q001 section 12.0/ KJO Spec.
"
N/A
"
I = Inspect or perform work WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records document
S=Survellance
H= Hold point
RFI= Issuued for H &
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS P FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN Contractor: MAU Contract No:HQ807 PC 09 Process Description
CONCRETE STRUCTURE
Inspection and Test Point
Dis Applicable Code or Standard
Acceptance Criteria
1.1 FBE coated reinforcements are shipped and 1.0 Material Control stored properly
Proj.specs SAES-Q-001 03210 Appendix-A/ Proj.specs KJO Spec. 03200
1.2 Cheek embedded iterns - Pipings, Sleeves, Anchors ect
SAES-Q-001 Proj.specs Section 8/ 03300 KJO Spec.
1.3 Check plywood and lumber misc etc
SAES- Q-401 Proj.specs Section 9/ 03100 KJO Spec.
1.4
SAES-Q-001 Section 5.0 Section 18/ KJO Spec.
Spec.Sec03300
2.1 CheckIns installed reinforcements as per drawing dimension and size and FBE costings spacers
SAES-Q-001 Appendix-A/ KJO Spec.
Spec .Sec03210 IFC drawing
2.2 Check embedded materials in proper location and anchorage
SAES-Q-001 Section 5.0 SAES-Q-005 Section 4.6/ KJO Spec.
2.3
SAES-Q-00I/ KJO Spec.
Spec sec03300
SAES-Q-O01 2.4 Cheek fromworks layout dimensions elevations Section 9.0. and check support bracings KJO Spec.
Spec Sec O3100 & 01051 IFC drawings Approved shop dwg
SAES-Q-001 2.5 Check plasticized vapour barrier installation and Section 12.0 lappings KJO Spec.
Spec Sec03300
2.0
Pre-pouing inspection
Approved desing mix of concrete
Check in the coating of the embedded items
I = Inspect or perform work WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records document
S=Survellance
H= Hold point
RFI= Issuued for H &
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS P FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN Contractor: MAU Contract No:HQ807 PC 09 Process Description
CONCRETE BLINDING
Approved design mix concrete
1.0 Material control
2.0
Applicable Code or Standard
Inspection and Test Point 1.1
Pre pouring inspection
Dis
2.1 Verify FDT results to salisfy compaction requirements
SAES-Q-OO1 Section 5.0 Tech,.specs Section 16 - 3300 KJO Spec. 1) SAES-M001/ SAES-A114/KJO Spec.
2.2 Check formworks layout dimensions and bracings 2.3 Check alevations by ınstruments
1) SAES-Q001/ ASTMC94 KJO Spec.
Specifiation 3.2 Conduct slump test concrete temperature reading and random sampling for comporasive test SAES-Q-001/ 09-SAMSS4 samples for every 50 cu M. 097 KJO Spec. 3.3 Check method of placement and movernent of SAES-QO01 section concrete 10/ KJO Spec. Concrate curing 4.1 Check method of of wet curing for at least two SAES-Q-0010 2 days 4.0 setion 10/ KJO Spec. 5.0
Work Acceptance 5.1 All work must be completed hand acceptable prior to and over to next work
I = Inspect or perform work
WI= 100% witness
R= Review / Approve records document
.Specs 02210
"
"
3.1 Check truck ticket for required mix design slump and time intervals Placement 3.0 pouring concrete
Acceptance Criteria
N/A
Proj.specs 03100 & 01051 Stuructural Drawing Specification sect.03300
"
"
" "
W2 = Random if inspector did not show proceed S=Survellance
H= Hold point
RFI= Issuued for H &
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACK FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN Contractor: MAU Contract No:HQ807 PC 09 Procest Description
BACKFILLING & COMPACTION
Inspection and Test Point
Applicable Code or Standard
Acceptance Criteria
1.1 Area Preparation 1.1
Cleaning and removing of all organic matters
SAES-A-114/ KJO Spec.
Cont Spec Sec 02210
2.0
Soil test
SAES-M-100 SAES-A-114/ KJO Spec.
"
3.1 Density test 4.1 Visual/ grade line check by instrument
"
"
"
"
4.2 Level and elevation of backfill check by instrument 5.1 Repair of settlement and working of graded area
" "
" "
"
"
Filling material 2.1
3.0 Compaction test Grade shape and 4.0 slope 5.0 Document and 6.0 drawing for quality record
6,1 Filed documents and drawings for record
I = Inspect or perform work WI= 100% witness R= Review / Approve records document
W2 = Random if inspector did not show proceed S=Survellance
H= Hold point
RFI= Issuued for H &
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACK FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN Contractor: MAU Contract No:HQ807 PC 09 Process Description
EXCAVATION
Inspection end Test Point
Dis Applicable Code or Standard
1.0 Excevation layout 2.0
1,1
denficication of lines level and catum by the use ofinstruments
Location and 2.1 Visual functional projection ofutilties
3.0 Excevation sloping shoring or 3.1 benching 4.0 Size and depth of excevation prepare 4.1 bottom of excevation 5.0 Max dry densty 5.1 value of material
Proj.specs SAES-M-100
sec 02210
SAES-A-114
Visual functional
SAES-A-114
Measurement and level instrument SAES-M-100 SAES-A-114
Soil test
6.0
SAES-M-100 SAES-A-114 ASTM-D-698
Compection test 6.1 Densty test 7.0Finish final inspection7.1 8.0 Documents and drawings for 8.1 quality record
Acceptance Criteria
Visual grade line check by instrument Filed documents and drawing for record
I = Inspect or perform work WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records document
S=Survellance
H= Hold point
RFI= Issuued for H &
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACK FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN Contractor: MAU Contract No:HQ807 PC 09
1.0
2.0
Process Description
TERMITE CONTROL
Inspection and Test Point
Disci Applicable Code or Standard
Acceptance Criteria
1,1 Terminte control spray chemical shall be Tech. Spec. approved material see proj.specfication.Rewivew the KJO/ARAMCO Sec-02281 Material Control material data sheets and Standards manufacturer'recommendation
Application & inspection
2,0 Examine the chemical dosage and material storage prior to spray or application on site 2,1 Termite spray must be as per manufactuer'sinstruction & the areas of application as agreed with KJO / SCEC representalive
"
"
"
"
2.2 Check approval FDT and utility clearance prior to application.
"
"
3.0 Protection shall be done as per the manufactuer's procedure after the spray to keep the effect terminte control chemical undistrubed
"
"
I = Inspect or perform work WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records document
S=Survellance
H= Hold point
RFI= Issuued for H &
TION, AND 5 SCHOOLS PACKAGE AFJI
Y UNIT
Rev.00 Discipline:
ITP-C-O05 CIVIL
Quality Record or MAU/QC SCEC KJO Third Verfying Document Inspector lnsp OA/QC party
R/S
R/S
R/S
S
S
S
I
S/R
R
I
W
S
I
I
S
I
w
S
I
S
S
I
S
S
I
S
S
I
S
S
W
W/S
S
I
S
S
I
S
S
I
W
S
I
S
S
I
H
S/R
Approved shop drawings
ceed RFI= Issuued for H & W only
TION, AND 5 SCHOOLS PACKAGE HAFJI Rev.00 Discipline: Quality Record or MAU QC Verifying Inspector Document
ITP-C-004 CIVIL SCEC KJO Third Insp. QA/QC party
Laboratory record
S/R
W/R
S
I
A)Flaid test record B)Laboratory record
I
W
S
l
MAU-C-C04
I
W
S
I
S
S
I
S/R
S
I
W
S
I
W
S
I
H/R
H/R
Visual Insp.followed by shop drawings
oceed RFI= Issuued for H & W only
. I
TION, AND 5 SCHOOLS PACKAGE HAFJI
RE
ITP-C-004 CIVIL
Rev.00
Discipline:
Quality Record or MAU QC SCEC KJO Third Verifying inspector Insp QA/QC party Document A) MAU-C-004 B) Visual
I
W
S
Check Approved shop drawings & visual inspection
I
H
S
I
S/R
S
A) Trial mix record B) Cillents approval
I
W/R
R/H
A) MAU-C-004 B) Visual
I
H
S
A)MAU-C-C04 B) visual report of electrical mechanical ,telecom.inspection
I
H .
S
A) MAU-C-004
I
H
S
I
H
S
I
W
S
"
A) MAU-C-004 B) Supplier certificate
oceed RFI= Issuued for H & W only
I
I
TION, AND 5 SCHOOLS PACKAGE HAFJI Rev.00 Discipline:
ITP-C-003 CIVIL
Quality Record or MAU QC SCEC KJO Third Verifying Inspector tnsp QA/QC party Document A) Trial mix record B) Clients approval
R
R
R
I
laboratory test Sheet
I
W
S
I
I
W
S
I
W
S
A) Suplier truck ticket B) MAU-C-003
I
S/R
S/R
I
A) Field test record B)laboratory test sheet
I
S
S
I
I
W
S
I
S
S
I
S
S
Checked approved shop drawings supplier
1) MAU-C-003
1) MAU-C-003
1) MAU-C-003
proceed RFI= Issuued for H & W only
ON, AND 5 SCHOOLS PACKAGE HAFJI
MPACTION
Rev.00 Discipline:
ITP-C-002 CIVIL
Quality Record or MAU QC SCEC KJO Third Verifying Inspector insp QA/QC party Document MAU-C-003
W
W
S
Lab form
I
W//R
S
I
Lab form
I
WR
S
I
Survey data
I
S/R
S
I I
W W
S S
I
R
S
MAU-C-003 MAU-C-003
roceed RFI= Issuued for H & W only
ON, AND 5 SCHOOLS PACKAGE HAFJI Rev.00 Discipline:
ITP-C-001 CIVIL
Quality Record or MAUQC SCEC KJO Third Verifying Inspector Insp QA/QC party Document Survey data
I
S/R
R
MAU-C-COI
I
S
S
MAU-C-001
I
S
S
MAU-C-O01
I
R
S
Lap.test sheet
I
R
R
Lap.test sheet
I
Wl
S
Survey data
I
W
S
S
R
R
oceed RFI= Issuued for H & W only
I
ON, AND 5 SCHOOLS PACKAGE KHAFJI Rev.00 Discipline:
ITP-C-024 CIVIL
Quality Record or MAU QC SCEC KJO Third Document Inspector ln«p OA/QC party MAU-C-024 R
R
R
"
Wl
S
S
"
H
H
S
R/W
W
S
S
S
S
AS per approved utility shop drawings "
oceed RFI= Issuued for H & W only
S
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAGE FACILITY 1,2,3,4 AL-KHAFJI INSPECTION & TEST PLAN INSTALLATION OF CONC. MASONRY UNIT item no
Contractor:
Process Description
1.0
Material Control
MAU Contract No:HQ807 PC 09
Inspection And Test Point 1.1. Approval for Concrete Block
Discipline: Applicable Code or Standard
Acceptance Criteria
09-SAMSS-016. Pro Specs Sec 04200
Quality Record or Verfying Document QR-C-005
1.2 Checkstaging area sizes and loadbearing schdule of concrete masonry blooks 2.0
Pre Mixing Delsgn mix ofmortar/grout mixses
3.0
Application
2.1
Approval to desingmix of mortar / grout mixes
3.1 Check surfaces of flooring and wall to recelve the work of any defects 3.2 Check masonry installedalignedbond pattern andfinish acceptable 3.3 Checkreinforcement bers placed in accordance with theconstruction drawingand specification 3.4 Check pre-fabricatedelements and wall tiesinstalled in accordance with the specification
ASTM-C-270 ASTM-C-476 SAES-M-100
3.5 Check placement of concrate mortar on requiredmasonry block 3.6 Check level nes and plumbness of block laying 3.7
Masonry block cells filled with grout and acceptable
3.8
Extra mortar to be cleaned
3.9
Clean concrete surfaces of forelgn matter with clean water
3.10 Check thickness of scratch brown andfinish coatsfor external walls 4.1 Practicable cured finish coat must be molsten for a min period of 48 hours. 5.1 Worg must be completedprlor to handover to next work Must have varlation of trus flatness (3mm in 3mtr)
4.0
SAES-Q-001
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAGE FACILITY 1,2,3,4 AL-KHAFJI INSPECTION & TEST PLAN İtem No
Contractor:
CONCRETE STRUCTURE
MAU Contract No:HQ807 PC 09
Discipline:
Process Description
3.0 PlacementPouring of concrete
İnspection and Test Point
5.0 Form Dismantling Aftercuring
8.0 Protective Coating 7.0 Work Acceptence
Quality Record or Verifying Document
3.1 Check truck ticket requiredmix desing slump end time intervals A) SAES-Q-001 Spec sec-03300 laboratory record Section 13.0 Section 8.0 C)ASTMC-94 3.2 Conduct slump test conc. Temperature reading and sampling b)SAES-Q- 001 Pfoj. Spec. Sec. 03300 A)Flaid test record for compressive stregth test 4 samples for every 75 cu.M Section 18.0 B)Laboratory record 3.3 Check method of placament and movement of concrate
4.0 Concrete Curing
Applicable Code Acceptance Criteria or Standard
4.1 Check methot o fwet curing by placing wet purlab over the precitable drled concrate and coninously wet for atleast 7 days or as approved by clent AGOC repsentative 5.1 Bearn sides form columns and walls can only be removed al the min of 24 hours Bearn soffits slabs that required support can only be removed after attalning 70% of desing strenght 5.2 Surfece repair should be done Immedlatey
a)SAES-Q-C01 section 8,0 a) SAE8-Q-001 section 10.0 a) SAES Q-001 section 8.0
6.1 After Practicable curing and befors backfill apply twocoats of b) SAES-Q-001 cols tar or bitumen casting on surfacesof concrate directly exposed section 12.0 7.1 All work must be completed prior to hand over to next work N/A
QR-C-C04
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAGE FACILITY 1,2,3,4 AL-KHAFJI INSPECTION & TEST PLAN item no
Contractor:
1
Process Description Material Control
CONCRETE STRUCTURE
MAU Contract No:HQ807 PC 09 Inspection and Test Point
1.1
FBE coated reinforcements are shipped and stored property
1.2
Cheek embedded iterns - Pipings, Sleeves, Anchors ect
1.3 Check plywood andlumber misc etc 1.4 2.0
Pre-peuing inspection
Approved desing mix of concrete
2.1 CheckIns installed reinforcements as per drawing dimension and size and FBE costings spacers 2.2 Check embedded materials in proper location and anchorage
2.3
Check in the coaliting of the embedded items
Olaclplina: Applicable Coda or Standard SAES-Q-001 Appendix-A SAES-Q-001 Section 8 SAES- Q-401 Section 9 SAES-Q-001 Section 5.0 Section 18 SAES-Q-001 Appendix-A SAES-Q-001 Section 5.0 SAES-Q-005 Section 4.6
Acceptance Criteria Proj.specs - 03210 Proj.specs - 03200
Quality Record or Verifying Document A) QR-C-004 B) Visual
Proj.specs - 03300 Proj.specs - 03100 A) Trial mix record B) Cillents approval Spec .Sec-03210 IFC A) QR-C-004 drawing B) Visual A)6R-C-C04 B) visual report of electrical mechanical inspection Spec.Sec-03300
SAES-Q-00I
Spec sec03300
2.4 Cheek fromworks layout dimensions elevations and check support bracings
SAES-Q-O01 Section 9.0.
Spec Sec O3100 & 01051 IFC drawings Approved shop dwg
2.5 Check plasticized vapour barrier installation and lappings
SAES-Q-001 Section 12.0
Spec Sec-03300
A) QR-C-004
A) QR-C-004 B) Suppler cartificate
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAGE FACILITY 1,2,3,4 AL-KHAFJI INSPECTION & TEST PLAN item no
Contractor: Process Description
CONCRETE BLINDING
MAU Contract No:HQ807 PC 09 Inspection and Test Point
1.0
material control
1.1
Approved desing mix concrete
2.0
Pre pourning ispection
2.1
Verify FDT results to salisfy compaction requiremnist
Discipline: CO o T7
SAES-Q-OOI Section 5.0 Section 16 1) SAES-M-001/ SAES-A-114
Acceptance Criteria Proj.specs - 3300 Proj.specs 02210
2,2 Check formworks layout dimensions and bracings 2.3 Check alevations by ınstruments 3.0 placement pourling cocrate 3.1 Check truck licket for required mix desing slump and time intervals
4.0
concrate curing
5.0
work Acceptance
Quality Record or Verifying Document A) Trial mix record B) Cillents approval laboratory record 1} QR-C-003
Proj.specs - 03100 &01051 IFC Drawing 1) SAES-Q-001/ specification b) ASTM-C94 sect.03300
A) Supper truck ticket B) QR-C-003
3.2 Conduct slump test concrete temperature reading and random sempling for comporasive test 4 samples for every 75 cu M.
specifiation SAES-Q-001
A) Field test record B)laboratory test sheet
3.3 Check method of placement and movernent of concrete
SAES-QO01 section 10 SAES-Q-0010 setion 10
1} QR-C-003
N/A
1} QR-C-003
4.1
Check method of of wat curing for at least two 2 days
5.1 All work must be complated hand accepttable prior to hand over to next work
1} QR-C-003
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAGE FACILITY 1,2,3,4 AL-KHAFJI INSPECTION & TEST PLAN BACKFILLING & COMPACTION item no
Contractor:
MAU Contract No:HQ807 PC 09
Discipline:
Inspection and Test Point
Procest Description
Applicable Code or Standard
Acceptance Criteria Cont Spec Sec 02210
1.1 Area Propation
1.1
Cleaning and removing of all organic matters
SAES-A-114
2.0 Filling material
2.1
soll test
SAES-M-100 SAES-A-114
3.0
3.1
densty test
4.0 grade shape slope
4.1 Virsual/ grade line check by instrument
Quality Record or Verifying Document QR-C-002 lab form lab form survey data
4.2 level and elevation of backfill check by ınstrument 5.0
5.1 visual
QR-C-002
6.0 document and drawing for quality record
6,1 Filed documents and drawings for record
QC-C-002
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAGE FACILITY 1,2,3,4 AL-KHAFJI INSPECTION & TEST PLAN item no
Contractor:
EXCAVATION
MAU Contract No:HQ807 PC 09
Process Description
1.0 excevation layout
Discipline: Inspection end Test Point Applicable Code or Standard
1,1
denficication of lines level and catum by the use ofinstruments
2.0 location andprojectionofutilties 2.1 Visual functional 3.0 excevation sloping shoring 3.1 Visual functional or benching 4.0 size and depth of excevation 4.1 measurement and level instrument prepare bottom of 5.0 max dry densty value of 5.1 soil test material 6.0 compection test 6.1 densty test 7.0 finish final inspection
7.1
8.0 documents and drawings for 8.1 quality record
Visual grade line check by instrument filed documents and drawing for record
SAES-M-100
Acceptance Criteria
Proj.specs sec 02210
Quality Record or Verifying Document survet data
SAES-A-114
QR-C-COI
SAES-A-114
QR-C-001 QR-C-O01
SAES-M-100 SAES-A-114 SAES-M-100 SAES-A-114 ASTM-D-698
lap.test sheet lap.test sheet Survey data
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAGE FACILITY 1,2,3,4 AL-KHAFJI INSPECTION & TEST PUN item no
Contractor:
1.0
Process Description
material control
2.0 Application & inspection
TERMITE CONTROL MAU Contract No:HQ807 PC 09 Inspection and Test Point
Discipline: Applicable Code Acceptance Criteria or Standard
1,1 Terminte control spray chemical shall be 4 to dursban product of AGOC'S standard Proj Spech SecDOW chemicals se per proj.specfication.Rewivew the material data 02261 sheets andmanufacturer'recommendation 2,0 examine the chemical closage and material storage prior to spray or application on site 2,1 termite spray must be as per manufactuer'sinstruction & the aress of application as agreed with AGOC'S representalive 2.2 protection shall be done as per the manufactuer's proceture after the spray to keep the effect terminte control chemicalundistrubed
Quality Record or Document
QR-C-024
SCHOOLS PACKAGE
Rev.00
ITP-C-O05
pline:
CIVIL CCE/QC Inspector
SCEC lnsp
KJO OA/QC
R/S
R/S
R/S
S
S
S
I
S/R
R
I
I
S
I
w
S
I
S
S
I
S
S
I
S
S
I
S
S
W
W/S
S
I
S
S
I
S
S
I
W
S
I
S
S
I
H
S/R
Third party
SCHOOLS PACKAGE
Rev.00
ITP-C-004 CIVIL
CCEOC Inspector
SCEC Irvsp
KJO QA/QC
Third party
S/R
W/R
S
I
I
W
S
l
I
W
S
I
S
S
I
S/R
S
I
W
S
I
W
S
I
H/R
H/R
. I
SCHOOLS PACKAGE
Rev.00
ITP-C-O04
plina:
CIVIL CCE QC inspector
SCEC Insp
KJO QA/QC
Third party
I
W
S
I
I
H
S
I
S/R
S
I
W/R
R/H
I
H
s
I
H .
s
I
H
s
I
H
s
I
W
s
I
SCHOOLS PACKAGE
ITP-c-003
Rev.00
pline:
CIVIL CCEQC Inspector
SCEC tnsp
KJO QA/QC
Third party
R
R
R
I
I
W
S
I
W
S
I
W
S
I
S/R
S/R
I
I
S
S
I
I
W
S
I
S
S
I
S
S
I
SCHOOLS PACKAGE
Rev.00
ITP-C-O02
Discipline:
CIVIL
CCE QC SCEC Inspector
insp
KJO QA/QC
Third party
W
W
S
I
W//R
S
I
I
WR
S
I
I
S/R
S
I
W
S
I
W
S
I
R
S
SCHOOLS PACKAGE
Rev.00
ITP-C-001
pline:
CIVIL CCEQC Inspector
SCEC Insp
KJO QA/QC
I
S/R
R
I
S
S
I
S
S
I
R
S
I
R
R
I
Wl
S
I
W
S
S
R
R
Third party
I
SCHOOLS PACKAGE
Rev.00
ITP-C-024
ine:
CIVIL CCEQC Inspector
SCEC ln«p
KJO OA/QC
R
R
R
Wl
S
S
H
H
S
S
S
S
Thir d part y
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PAC FACILITY 1,2,3,4 AL-KHAFJI
item no
Contractor:
INSPECTION & TEST PLAN INSTALLATION OF CONC. MASONRY UNIT MAU Contract No:HQ807 PC 09
Process Description
Inspection And Test Point
Applicable Code or Standard
Discip
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PAC FACILITY 1,2,3,4 AL-KHAFJI
İtem No
INSPECTION & TEST PLAN CONCRETE STRUCTURE Contractor: MAU Contract No:HQ807 PC 09 Process Description İnspection and Test Point
Dis Applicable Code or Standard
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PAC FACILITY 1,2,3,4 AL-KHAFJI INSPECTION & TEST PLAN CONCRETE STRUCTURE Contractor: MAU Contract No:HQ807 PC 09
Discip
item no
Process Description
Inspection and Test Point
Applicable Coda or Standard
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PAC FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN CONCRETE BLINDING Contractor: MAU Contract No:HQ807 PC 09 Process Description
Inspection and Test Point
Discip CO o T7
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAG FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN BACKFILLING & COMPACTION Contractor: MAU Contract No:HQ807 PC 09 Procest Description
Inspection and Test Point
D Applicable Code or Standard
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAG FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN EXCAVATION Contractor: MAU Contract No:HQ807 PC 09 Process Description
Inspection end Test Point
Discipl Applicable Code or Standard
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAG FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN TERMITE CONTROL Contractor: MAU Contract No:HQ807 PC 09 Process Description
Inspection and Test Point
Disciplin Applicable Code or Standard
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
ATION, AND 5 SCHOOLS PACKAGE HAFJI
NRY UNIT
Rev.00 Discipline:
ITP-C-O05 CIVIL
Quality Record or CCE/QC SCEC KJO Third Verfying Document Inspector lnsp OA/QC party
ector did not show proceed
RFI= Issuued for H & W only
ATION, AND 5 SCHOOLS PACKAGE KHAFJI Rev.00 Discipline: Quality Record or CCEOC Verifying Inspector Document
ITP-C-004 CIVIL SCEC KJO Third Irvsp QA/QC party
ector did not show proceed
RFI= Issuued for H & W only
ATION, AND 5 SCHOOLS PACKAGE KHAFJI Rev.00
Discipline:
ITP-C-O04
CIVIL
Quality Record or CCE QC SCEC KJO Third Verifying inspector Insp QA/QC party Document
ector did not show proceed
RFI= Issuued for H & W only
ATION, AND 5 SCHOOLS PACKAGE -KHAFJI Rev.00 ITP-c-003 Discipline: CIVIL Quality Record or CCEQC SCEC KJO Third Verifying Inspector tnsp QA/QC party Document
ector did not show proceed
RFI= Issuued for H & W only
TION, AND 5 SCHOOLS PACKAGE KHAFJI Rev.00 Discipline:
ITP-C-O02 CIVIL
Quality Record or CCE QC SCEC KJO Third Verifying Inspector insp QA/QC party Document
ector did not show proceed
RFI= Issuued for H & W only
TION, AND 5 SCHOOLS PACKAGE -KHAFJI Rev.00 Discipline:
ITP-C-001 CIVIL
Quality Record or CCEQC SCEC KJO Third Verifying Inspector Insp QA/QC party Document
ector did not show proceed
RFI= Issuued for H & W only
TION, AND 5 SCHOOLS PACKAGE -KHAFJI Rev.00 Discipline:
ITP-C-024 CIVIL
Quality Record or CCEQC SCEC KJO Third Document Inspector ln«p OA/QC party
ector did not show proceed
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN RESILIENT FLOORING Contractor: MAU Contract No:HQ807 PC 09 Process Description
1
Material
2
Installation
Applicable Code or Standard
Inspection And Test Point
1.1 Check that material to be used is approved
SAES M-100
2.1 Check that area is clean prior to commencment of works.
"
2.2 Check that floor is smooth,leveled with no cracks or holes
"
2.3 Check that adhesive is properly spread and tile relaid firmly.
"
2.4 Check that joints and seam are parallel to building line and floor is termianted at center of door opening where adjacent floor finish is disimilar
FS-L-F-475A
2.5 Ensure that metal edge strip is instatled at unprotected or exposed edges.
"
2.6 Ensure at movable partitions,flooring is installed under partitions without interrupting floor pattern.
"
2.7 Base joints shall be tight and vertical.
"
2.8 Ensure stair treads and risers are instelled in one piece of full width end dept.
"
2.9 Check final and complate installation
"
I = Inspect or perform work
WI= 100% witness
R= Review / Approve records document
W2 = Random if inspector did not show proceed
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS FACILITY 1,2,3,4 AL-KHAFJI
İtem No
INSPECTION & TEST PLAN Contractor: MAU Contract No:HQ807 PC 09 Process Description
1.0
Material
2.0
Pre-Placing
ASPHALTIC CONCRETE
İnspection and Test Point 1.1 Check that primer coat tack coat and asphalt mix design are approved.
D Applicable Code or Standard SAES -G -006/ KJO Spec.
2.1 Check that subbase material is compacted and accepted
"
2.2 Check that surface is to the correct elevation, clean from duet and loose material.
"
2.3 Check that primer coat has been applied properly and cured at least 24 Hrs.
"
2.4 Check that menholes frames and covers are in correct elavation
"
3.1 Check the asphalt mix is as required and 3.0 Asphalt Placing approved
SAES -G -006/ KJO Spec.
3.2 Check temperature of the paving mixture is within specified limits.
"
3.3 Check paving mixture uniformly of aggregates bituminous content and not over heated.
"
3.4 Check placement of asphalt is uniform and correct thickness
"
3.5 Check that asphalt is compacted to te reguired degree of compactor with no displacement or extrude pavement from position.
"
I = Inspect or perform work
WI= 100% witness
R= Review / Approve records document
W2 = Random if inspector did not show proceed
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN Contractor: MAU Contract No:HQ807 PC 09 Process Description
1.0
Material
2.0
Installation
MOTORIZED DRAPERIES & STAGE CURTAINS Applicable Coda or Standard
Inspection and Test Point 1.1 Check material and draperies & curtains are as approved submittals
KJO Spec.
1.2 Check exact measurement and type
"
1.3 Check the wrapping & carton to bear the manufacturer identification
"
2.1 Check the track on which pully operate is straight and firm to take theload of curtain
"
2.2 Check the adjoining work is not dameged from installation of tracks.
"
2.3 Check installation of tracks.
"
2.4 Check the draperies and curtains are clean after installation.
"
2.5 Check the operation of system
"
I = Inspect or perform work
WI= 100% witness
R= Review / Approve records document
S=Survellance
W2 = Random if inspector did not show proceed H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN Contractor: MAU Contract No:HQ807 PC 09 Process Description
1.0
Material
Inspection and Test Point 1.1 check tile is approved type ,brand,size and glazing.
TILE WORK Applicable Coda or Standard TCA-137-1
1.2 Check that adhesive primer mortar and grout are approved. 2.0
Installation
ANSI -A-118
2.1 Application of installation method is as per required SAES-M-100 tile. 2.2 Installation of tile shall be as per the approved mock " up sample and as per acceptable layout prior to start. 2.3 Check that water proofing memberance is installed ANSI -A-118-1 and accepted prior to laying of floor tile. 2.4 Check tile joints are uniform and pattern is as idicated.
SAES-M-100
2.5 Chec the setting for soundness replace hollow sounding units.
"
2.6 Tile setting curing period is maintained prior to grouting
"
2.7 check protective sealer is applied prior to grouting.
"
2.8 Check approved grouting material is applied and grouting is accepted.
"
I = Inspect or perform work
WI= 100% witness
R= Review / Approve records document
S=Survellance
W2 = Random if inspector did not show proceed H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PA FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN Contractor: MAU Contract No:HQ807 PC 09 Procest Description
ASPHALTIC CONCRETE Applicable Code or Standard
Inspection and Test Point 3.6 Check that surface receives consecutive passes achieve smooth finish with no marks. 3.7 Check that discontinuation of asphalt paving is made to an even squre cut and tack coated as specified
4.0
Testing
3.8 Check that paved surface is acceptable and all defect corrected as required 4.1 Material
SAES Q-006 " " SAES Q-006
4.2 Uncompated Asphalt
"
4.2.1 Extraction
"
4.2.2 Gradation
"
4.2.3 Marshall properties
"
4.3 Compacted Asphalt
SAES Q-006
4.3.1 Core Density and thickness
"
4.4 Equipment
"
4.4.1 Weighing Scale
"
4.4.2 Temperature Gauges
"
4.5 Tolerance
SAES Q-006
4.5.1 Surface Tolerance
"
4.5.2 Thickness Tolerance
"
I = Inspect or perform work R= Review / Approve records document
WI= 100% witness S=Survellance
W2 = Random if inspector did not show proceed H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PA FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN Contractor: MAU Contract No:HQ807 PC 09
1.0
2.0
Process Description
GYPSUM BOARD SYSTEM Applicable Code or Standard
Inspection end Test Point
Material
1.1 Check Gypsum board of correct type,standard,Fire Rated moisture resistant etc.
Installation
1.2 Check runner,metal studs,fasteners,reinforcing tape adhesive corner beads,fire retardant sealant that they are approved products. 2.1 Check installation of framing and furring in accordance approved construction drawings.
ASTM-C-36 ASTM-C-475 ASTM-C-514 ASTM-C -645 ASTM-C-754 ASTM-C-36
2.2 Check spacing and direction of hangers,spacing of main runner of suspended ceiling. 2.3 Check weather protection installation is provided
" ASTM-C-665
2.4 For fire rated wall check that taping fasteners, cementing and sealant of joints are in accordance with applicable standards.
ASTM-C-665
2.5 Check installation of control joints when required.
ASTM-C- 475
2.6 Check Insulation
ASTM-C-665
2.7 Check embedded items & stud framing system.
ASTM-C 665
2.8 Check penetration through fire rated wall,position, opening tolerance,sealant used and thickness.
ASTM-E-119
2.9 Check that water resistant gypsum packing board is used for base to a tile or wall panel at tub,shower or ASTM-C-630 water closet 2.10 Check that texture finish of gypsum board,framing ASTM-C-640 is as specified. I = Inspect or perform work
WI= 100% witness
R= Review / Approve records document
S=Survellance
W2 = Random if inspector did not show proceed H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PA FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN Contractor: MAU Contract No:HQ807 PC 09
1.0
Process Description Material
Inspection and Test Point
Execution
Di Applicable Code or Standard
1.1 Aggregate:Natural sand of the required gradation.
ASTM-C-897
1.2 Portland Cement Type 1
ASTM-C-150
1.3 Mix Design for all plaster types 2.0
PLASTERING
2.1 Check surface preperation,masonry,concrete 2.2 Check items within wall have been already installed 2.3 Electro-Mechanical services have been tested and approved. 2.4 Check required plaster mix for exterior wall,interior wall and ceiling.
Spec Req. SAES-M-100 " " "
2.5 application of dash coat,scratch coat,brown coat and finish coat coat as pershall mixbe design 2.6 Finish cured for a minumum of 48 hours. 2.7 Plaster shall extend 100mm beyond finished ceiling level for rooms with suspended ceiling. 2.8 Check plaster variation to true finish.
I = Inspect or perform work R= Review / Approve records document
WI= 100% witness S=Survellance
" " " "
W2 = Random if inspector did not show proceed H= Hold point
RFI= Issuued for H & W only
S MTD,AVIATION, AND 5 SCHOOLS PACKAGE 4 AL-KHAFJI Rev.00 Discipline: Acceptance Criteria
ITP-C-012 CIVIL
Quality Record or MAU QC SCEC KJO Third Verfying Document Inspector lnsp OA/QC party
Spec.Sec. 09665
Approved submittal
l
S/R
R
"
MAU-C-012
Wl
W2
S
"
"
Wl
W2
S
"
"
W2
S
S
"
"
S
S
S
"
"
S
S
S
"
"
S
S
S
"
Visual
S
S
S
"
MAU-C-012
S
S
S
"
"
Wl
Wl
S
f inspector did not show proceed RFI= Issuued for H & W only
S MTD,AVIATION, AND 5 SCHOOLS PACKAGE AL-KHAFJI
LTIC CONCRETE Acceptance Criteria Spec.Sect. 02513
Rev.00 ITP-C-010 Discipline: CIVIL Quality Record or MAU QC SCEC KJO Third Verifying Inspector Irvsp QA/QC party Document MAU--C-010
H/R
R
R
Laboratory Record
H
I
R
"
H
R/I
S
As per Spec. 02513
"
I
I
S
As per approved drawings
"
I
I
S
100%degree of compaction Spec.Sect. 02513 As per Drawings
I
As per Spec. 02513 approved submittal Between 139 163 deg.
" Laboratory Record
" "
H
W
S
I
H
W
S
l
H
W
S
l
H
W
S
l
W
S
"
f inspector did not show proceed RFI= Issuued for H & W only
S MTD,AVIATION, AND 5 SCHOOLS PACKAGE AL-KHAFJI
ERIES & STAGE CURTAINS
ITP-C-011 CIVIL
Rev.00
Discipline: Acceptance Criteria
Quality Record or MAU QC SCEC KJO Third Verifying inspector Insp QA/QC party Document
Tech.Spec 12535
MAU-C-011
I/R
I/R
R
"
"
I
R
R
"
"
W2
S
S
"
"
Wl
Wl
S
"
"
S
S
S
"
"
Wl
Wl
S
"
"
W2
S
S
"
"
Wl
Wl
S
f inspector did not show proceed RFI= Issuued for H & W only
S MTD,AVIATION, AND 5 SCHOOLS PACKAGE AL-KHAFJI
E WORK
Rev.00
ITP-C-009 CIVIL
Discipline: Acceptance Criteria Approved sample Spec.Sec.09310
Quality Record or MAU QC SCEC KJO Third Verifying Inspector tnsp QA/QC party Document MAU-C-009
H
S/l
R
As per Spec. 09330
"
H
S/l
S
"
"
l
l
S
"
"
W/H
l
S
"
"
H
l
S
"
"
l
S/l
S
sound check/ knocking with rubber hummer
"
l
l
S
manufacturer instruction
"
l
W
S
"
"
l
S/l
S
Spec.and manufacturer recommendation ..
"
R/l
W
R/S
f inspector did not show proceed RFI= Issuued for H & W only
S MTD,AVIATION, AND 5 SCHOOLS PACKAGE AL-KHAFJI
CONCRETE
Rev.00 Discipline: Acceptance Criteria
ITP-C-010 CIVIL
Quality Record or MAU SCEC KJO Third Verifying QC insp QA/QC party Document Inspector
As per Spec. 02513
Visual
l
W
S
"
"
l
W
S
"
"
Wl
W
S
W/R
W/R
R
"
Laboratory Records Lab. Records
"
"
"
"
"
"
Spec.02513
Lab.Records
R
W
S
l
R
R
R
l
l/R
l/R
R
"
"
"
"
Calib. Certificates
"
"
"
"
"
MAU-010
"
" "
"
f inspector did not show proceed RFI= Issuued for H & W only
S MTD,AVIATION, AND 5 SCHOOLS PACKAGE AL-KHAFJI
RD SYSTEM
Rev.00
ITP-C-008 CIVIL
Discipline: Acceptance Criteria
Quality Record or MAU QC SCEC KJO Third Verifying Inspector Insp QA/QC party Document
Spec,Sect, 09260
MAU-C-008
l
S/R
R
"
"
l
S/R
R
Spec.approved drawings/Instaliti on procedures/ mockup sample
"
l/H
l
S
"
"
l
l
S
Sect.9260
"
l
W
S
UL or equivalent Spec.Sec.09260
"
R/l
R/l
S/R
"
"
l
S
S
"
"
H
W
S
"
"
H
W
S
"
"
H
H
S
"
"
l
l
S
UL or equivalent Spec.Sec.09260
"
l
l
S
f inspector did not show proceed RFI= Issuued for H & W only
S MTD,AVIATION, AND 5 SCHOOLS PACKAGE AL-KHAFJI PLASTERING
Rev.00
ITP-C-006 CIVIL
Discipline: Acceptance Criteria
Quality Record or MAU QC SCEC KJO Third Document Inspector ln«p OA/QC party
Sec.09220
Lab.Records
R
R
R
"
Mill Certificate
l/R
R
S
"
Lab.Records
R
W
S
"
Visual MAU-C-006
l
W
S
"
"
l
l
S
"
"
l
W/R
S
"
"
l
R
S
"
"
l
S
S
"
"
l
S
S
"
"
l
S
S
Max.Variation 3mm in 3m.
"
l
l
S
f inspector did not show proceed RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PA FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN DOORS AND WINDOWS Contractor: MAU Contract No:HQ807 PC 09 Process Description
1.0
Material
2.0
Installation
Dis
Inspection And Test Point 1.1 Check frame size and thickness,base anchorage and primer
Applicable Code or Standard
Acceptance Criteria
ANSI/SDI-100
Spec.08120 08211
1.2 Check frame identification number correct for location 1.3 Check frame and paint not damaged,strut welded across the jambs at base
"
Spec.8305
ASTM-A-653
Spec.6360 08410
2.1 Check frame installation
ANSI/SDI-100
"
"
"
"
Spec.7920 Spec.7900
2.4 Installation of door in accordance with manufacturer and construction drawing.
"
As per drawing manufac.recommen dation
2.5 Glass and glazing installed as per finishing schedule
"
Spec.08810
"
Distortion less than 3mm measured with straight edge corner to corner
2.2 Check door identification number type and opening direction is correct for location 2.3 Check caulking sealant & back-up rod.
2.6 Installation is completed and with tolerance
2.7 Door operation is saticfactory
I = Inspect or perform work
WI= 100% witness
R= Review / Approve records document
S=Survellance
" W2 = Random if inspector did not show proceed H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PA FACILITY 1,2,3,4 AL-KHAFJI
İtem No
INSPECTION & TEST PLAN CONCRETE STRUCTURE Contractor: MAU Contract No:HQ807 PC 09 Process İnspection and Test Point Description
Dis Applicable Code or Standard
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PA FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN CONCRETE STRUCTURE Contractor: MAU Contract No:HQ807 PC 09 Process Description
Inspection and Test Point
Disc Applicable Coda or Standard
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PA FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN CONCRETE BLINDING Contractor: MAU Contract No:HQ807 PC 09 Process Description
Inspection and Test Point
Disc CO o T7
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACK FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN BACKFILLING & COMPACTION Contractor: MAU Contract No:HQ807 PC 09 Procest Description
Inspection and Test Point
Applicable Code or Standard
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACK FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN EXCAVATION Contractor: MAU Contract No:HQ807 PC 09 Process Description
Inspection end Test Point
Disc Applicable Code or Standard
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACK FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN TERMITE CONTROL Contractor: MAU Contract No:HQ807 PC 09 Process Description
Inspection and Test Point
Discip Applicable Code or Standard
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
ON, AND 5 SCHOOLS PACKAGE FJI Rev.00 Discipline:
ITP-C-007 CIVIL
Quality Record MAU/QC SCEC KJO Third or Verfying Inspector lnsp OA/QC party Document MAU-C-007
l
l
S
"
l
l
S
"
l
W2
S
"
l
W2
S
"
l
W2
S
"
l
W2
S
"
l
Wl
S
"
l
W2
S
"
l
l
S
"
l
l
S
d not show proceed
ssuued for H & W only
ON, AND 5 SCHOOLS PACKAGE AFJI Rev.00 Discipline: Quality Record CCEOC or Verifying Inspector Document
d not show proceed
suued for H & W only
ITP-C-004 CIVIL SCEC KJO Third Irvsp QA/QC party
ON, AND 5 SCHOOLS PACKAGE AFJI Rev.00
Discipline:
ITP-C-O04
CIVIL
Quality Record CCE QC SCEC KJO Third or Verifying inspector Insp QA/QC party Document
d not show proceed
suued for H & W only
ON, AND 5 SCHOOLS PACKAGE AFJI Rev.00 ITP-c-003 Discipline: CIVIL Quality Record CCEQC SCEC KJO Third or Verifying Inspector tnsp QA/QC party Document
d not show proceed
suued for H & W only
N, AND 5 SCHOOLS PACKAGE FJI Rev.00 ITP-C-O02 Discipline: CIVIL Quality Record CCE QC SCEC KJO Third or Verifying Inspector insp QA/QC party Document
d not show proceed
suued for H & W only
N, AND 5 SCHOOLS PACKAGE AFJI Rev.00 Discipline:
ITP-C-001 CIVIL
Quality Record CCEQC SCEC KJO Third or Verifying Inspector Insp QA/QC party Document
d not show proceed
suued for H & W only
N, AND 5 SCHOOLS PACKAGE AFJI Rev.00 Discipline:
ITP-C-024 CIVIL
Quality Record CCEQC SCEC KJO Third or Document Inspector ln«p OA/QC party
d not show proceed
suued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PAC FACILITY 1,2,3,4 AL-KHAFJI
item no
Contractor:
INSPECTION & TEST PLAN INSTALLATION OF CONC. MASONRY UNIT MAU Contract No:HQ807 PC 09
Process Description
Inspection And Test Point
Applicable Code or Standard
Discip
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PAC FACILITY 1,2,3,4 AL-KHAFJI
İtem No
INSPECTION & TEST PLAN CONCRETE STRUCTURE Contractor: MAU Contract No:HQ807 PC 09 Process İnspection and Test Point Description
Dis Applicable Code or Standard
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PAC FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN CONCRETE STRUCTURE Contractor: MAU Contract No:HQ807 PC 09 Process Description
Inspection and Test Point
Discip Applicable Coda or Standard
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PAC FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN CONCRETE BLINDING Contractor: MAU Contract No:HQ807 PC 09 Process Description
Inspection and Test Point
Discip CO o T7
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAG FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN BACKFILLING & COMPACTION Contractor: MAU Contract No:HQ807 PC 09 Procest Description
Inspection and Test Point
D Applicable Code or Standard
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAG FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN EXCAVATION Contractor: MAU Contract No:HQ807 PC 09 Process Description
Inspection end Test Point
Discipl Applicable Code or Standard
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAG FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN TERMITE CONTROL Contractor: MAU Contract No:HQ807 PC 09 Process Description
Inspection and Test Point
Disciplin Applicable Code or Standard
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
ATION, AND 5 SCHOOLS PACKAGE HAFJI
NRY UNIT
Rev.00 Discipline:
ITP-C-O05 CIVIL
Quality Record or CCE/QC SCEC KJO Third Verfying Document Inspector lnsp OA/QC party
ector did not show proceed
RFI= Issuued for H & W only
ATION, AND 5 SCHOOLS PACKAGE KHAFJI Rev.00 Discipline: Quality Record or CCEOC Verifying Inspector Document
ITP-C-004 CIVIL SCEC KJO Third Irvsp QA/QC party
ector did not show proceed
RFI= Issuued for H & W only
ATION, AND 5 SCHOOLS PACKAGE KHAFJI Rev.00
Discipline:
ITP-C-O04
CIVIL
Quality Record or CCE QC SCEC KJO Third Verifying inspector Insp QA/QC party Document
ector did not show proceed
RFI= Issuued for H & W only
ATION, AND 5 SCHOOLS PACKAGE -KHAFJI Rev.00 ITP-c-003 Discipline: CIVIL Quality Record or CCEQC SCEC KJO Third Verifying Inspector tnsp QA/QC party Document
ector did not show proceed
RFI= Issuued for H & W only
TION, AND 5 SCHOOLS PACKAGE KHAFJI Rev.00 Discipline:
ITP-C-O02 CIVIL
Quality Record or CCE QC SCEC KJO Third Verifying Inspector insp QA/QC party Document
ector did not show proceed
RFI= Issuued for H & W only
TION, AND 5 SCHOOLS PACKAGE -KHAFJI
Rev.00 Discipline:
ITP-C-001 CIVIL
Quality Record or CCEQC SCEC KJO Third Verifying Inspector Insp QA/QC party Document
ector did not show proceed
RFI= Issuued for H & W only
TION, AND 5 SCHOOLS PACKAGE -KHAFJI Rev.00 Discipline:
ITP-C-024 CIVIL
Quality Record or CCEQC SCEC KJO Third Document Inspector ln«p OA/QC party
ector did not show proceed
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PAC FACILITY 1,2,3,4 AL-KHAFJI
item no
Contractor:
INSPECTION & TEST PLAN INSTALLATION OF CONC. MASONRY UNIT MAU Contract No:HQ807 PC 09
Process Description
Inspection And Test Point
Applicable Code or Standard
Discip
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PAC FACILITY 1,2,3,4 AL-KHAFJI
İtem No
INSPECTION & TEST PLAN CONCRETE STRUCTURE Contractor: MAU Contract No:HQ807 PC 09 Process İnspection and Test Point Description
Dis Applicable Code or Standard
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PAC FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN CONCRETE STRUCTURE Contractor: MAU Contract No:HQ807 PC 09 Process Description
Inspection and Test Point
Discip Applicable Coda or Standard
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PAC FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN CONCRETE BLINDING Contractor: MAU Contract No:HQ807 PC 09 Process Description
Inspection and Test Point
Discip CO o T7
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAG FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN BACKFILLING & COMPACTION Contractor: MAU Contract No:HQ807 PC 09 Procest Description
Inspection and Test Point
D Applicable Code or Standard
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAG FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN EXCAVATION Contractor: MAU Contract No:HQ807 PC 09 Process Description
Inspection end Test Point
Discipl Applicable Code or Standard
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAG FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN TERMITE CONTROL Contractor: MAU Contract No:HQ807 PC 09 Process Description
Inspection and Test Point
Disciplin Applicable Code or Standard
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
ATION, AND 5 SCHOOLS PACKAGE HAFJI
NRY UNIT
Rev.00 Discipline:
ITP-C-O05 CIVIL
Quality Record or CCE/QC SCEC KJO Third Verfying Document Inspector lnsp OA/QC party
ector did not show proceed
RFI= Issuued for H & W only
ATION, AND 5 SCHOOLS PACKAGE KHAFJI Rev.00 Discipline: Quality Record or CCEOC Verifying Inspector Document
ITP-C-004 CIVIL SCEC KJO Third Irvsp QA/QC party
ector did not show proceed
RFI= Issuued for H & W only
ATION, AND 5 SCHOOLS PACKAGE KHAFJI Rev.00
Discipline:
ITP-C-O04
CIVIL
Quality Record or CCE QC SCEC KJO Third Verifying inspector Insp QA/QC party Document
ector did not show proceed
RFI= Issuued for H & W only
ATION, AND 5 SCHOOLS PACKAGE -KHAFJI Rev.00 ITP-c-003 Discipline: CIVIL Quality Record or CCEQC SCEC KJO Third Verifying Inspector tnsp QA/QC party Document
ector did not show proceed
RFI= Issuued for H & W only
TION, AND 5 SCHOOLS PACKAGE KHAFJI Rev.00 Discipline:
ITP-C-O02 CIVIL
Quality Record or CCE QC SCEC KJO Third Verifying Inspector insp QA/QC party Document
ector did not show proceed
RFI= Issuued for H & W only
TION, AND 5 SCHOOLS PACKAGE -KHAFJI
Rev.00 Discipline:
ITP-C-001 CIVIL
Quality Record or CCEQC SCEC KJO Third Verifying Inspector Insp QA/QC party Document
ector did not show proceed
RFI= Issuued for H & W only
TION, AND 5 SCHOOLS PACKAGE -KHAFJI Rev.00 Discipline:
ITP-C-024 CIVIL
Quality Record or CCEQC SCEC KJO Third Document Inspector ln«p OA/QC party
ector did not show proceed
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PAC FACILITY 1,2,3,4 AL-KHAFJI
item no
Contractor:
INSPECTION & TEST PLAN INSTALLATION OF CONC. MASONRY UNIT MAU Contract No:HQ807 PC 09
Process Description
Inspection And Test Point
Applicable Code or Standard
Discip
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PAC FACILITY 1,2,3,4 AL-KHAFJI
İtem No
INSPECTION & TEST PLAN CONCRETE STRUCTURE Contractor: MAU Contract No:HQ807 PC 09 Process İnspection and Test Point Description
Dis Applicable Code or Standard
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PAC FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN CONCRETE STRUCTURE Contractor: MAU Contract No:HQ807 PC 09 Process Description
Inspection and Test Point
Discip Applicable Coda or Standard
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PAC FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN CONCRETE BLINDING Contractor: MAU Contract No:HQ807 PC 09 Process Description
Inspection and Test Point
Discip CO o T7
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAG FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN BACKFILLING & COMPACTION Contractor: MAU Contract No:HQ807 PC 09 Procest Description
Inspection and Test Point
D Applicable Code or Standard
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAG FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN EXCAVATION Contractor: MAU Contract No:HQ807 PC 09 Process Description
Inspection end Test Point
Discipl Applicable Code or Standard
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAG FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN TERMITE CONTROL Contractor: MAU Contract No:HQ807 PC 09 Process Description
Inspection and Test Point
Disciplin Applicable Code or Standard
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
ATION, AND 5 SCHOOLS PACKAGE HAFJI
NRY UNIT
Rev.00 Discipline:
ITP-C-O05 CIVIL
Quality Record or CCE/QC SCEC KJO Third Verfying Document Inspector lnsp OA/QC party
ector did not show proceed
RFI= Issuued for H & W only
ATION, AND 5 SCHOOLS PACKAGE KHAFJI Rev.00 Discipline: Quality Record or CCEOC Verifying Inspector Document
ITP-C-004 CIVIL SCEC KJO Third Irvsp QA/QC party
ector did not show proceed
RFI= Issuued for H & W only
ATION, AND 5 SCHOOLS PACKAGE KHAFJI Rev.00
Discipline:
ITP-C-O04
CIVIL
Quality Record or CCE QC SCEC KJO Third Verifying inspector Insp QA/QC party Document
ector did not show proceed
RFI= Issuued for H & W only
ATION, AND 5 SCHOOLS PACKAGE -KHAFJI Rev.00 ITP-c-003 Discipline: CIVIL Quality Record or CCEQC SCEC KJO Third Verifying Inspector tnsp QA/QC party Document
ector did not show proceed
RFI= Issuued for H & W only
TION, AND 5 SCHOOLS PACKAGE KHAFJI Rev.00 Discipline:
ITP-C-O02 CIVIL
Quality Record or CCE QC SCEC KJO Third Verifying Inspector insp QA/QC party Document
ector did not show proceed
RFI= Issuued for H & W only
TION, AND 5 SCHOOLS PACKAGE -KHAFJI
Rev.00 Discipline:
ITP-C-001 CIVIL
Quality Record or CCEQC SCEC KJO Third Verifying Inspector Insp QA/QC party Document
ector did not show proceed
RFI= Issuued for H & W only
TION, AND 5 SCHOOLS PACKAGE -KHAFJI Rev.00 Discipline:
ITP-C-024 CIVIL
Quality Record or CCEQC SCEC KJO Third Document Inspector ln«p OA/QC party
ector did not show proceed
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PAC FACILITY 1,2,3,4 AL-KHAFJI
item no
Contractor:
INSPECTION & TEST PLAN INSTALLATION OF CONC. MASONRY UNIT MAU Contract No:HQ807 PC 09
Process Description
Inspection And Test Point
Applicable Code or Standard
Discip
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PAC FACILITY 1,2,3,4 AL-KHAFJI
İtem No
INSPECTION & TEST PLAN CONCRETE STRUCTURE Contractor: MAU Contract No:HQ807 PC 09 Process İnspection and Test Point Description
Dis Applicable Code or Standard
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PAC FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN CONCRETE STRUCTURE Contractor: MAU Contract No:HQ807 PC 09 Process Description
Inspection and Test Point
Discip Applicable Coda or Standard
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PAC FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN CONCRETE BLINDING Contractor: MAU Contract No:HQ807 PC 09 Process Description
Inspection and Test Point
Discip CO o T7
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAG FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN BACKFILLING & COMPACTION Contractor: MAU Contract No:HQ807 PC 09 Procest Description
Inspection and Test Point
D Applicable Code or Standard
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAG FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN EXCAVATION Contractor: MAU Contract No:HQ807 PC 09 Process Description
Inspection end Test Point
Discipl Applicable Code or Standard
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAG FACILITY 1,2,3,4 AL-KHAFJI
item no
INSPECTION & TEST PLAN TERMITE CONTROL Contractor: MAU Contract No:HQ807 PC 09 Process Description
Inspection and Test Point
Disciplin Applicable Code or Standard
Acceptance Criteria
I = Inspect or perform work
WI= 100% witness
W2 = Random if inspector did not show proceed
R= Review / Approve records documen
S=Survellance
H= Hold point
RFI= Issuued for H & W only
ATION, AND 5 SCHOOLS PACKAGE HAFJI
NRY UNIT
Rev.00 Discipline:
ITP-C-O05 CIVIL
Quality Record or CCE/QC SCEC KJO Third Verfying Document Inspector lnsp OA/QC party
ector did not show proceed
RFI= Issuued for H & W only
ATION, AND 5 SCHOOLS PACKAGE KHAFJI Rev.00 Discipline: Quality Record or CCEOC Verifying Inspector Document
ITP-C-004 CIVIL SCEC KJO Third Irvsp QA/QC party
ector did not show proceed
RFI= Issuued for H & W only
ATION, AND 5 SCHOOLS PACKAGE KHAFJI Rev.00
Discipline:
ITP-C-O04
CIVIL
Quality Record or CCE QC SCEC KJO Third Verifying inspector Insp QA/QC party Document
ector did not show proceed
RFI= Issuued for H & W only
ATION, AND 5 SCHOOLS PACKAGE -KHAFJI Rev.00 ITP-c-003 Discipline: CIVIL Quality Record or CCEQC SCEC KJO Third Verifying Inspector tnsp QA/QC party Document
ector did not show proceed
RFI= Issuued for H & W only
TION, AND 5 SCHOOLS PACKAGE KHAFJI Rev.00 Discipline:
ITP-C-O02 CIVIL
Quality Record or CCE QC SCEC KJO Third Verifying Inspector insp QA/QC party Document
ector did not show proceed
RFI= Issuued for H & W only
TION, AND 5 SCHOOLS PACKAGE -KHAFJI
Rev.00 Discipline:
ITP-C-001 CIVIL
Quality Record or CCEQC SCEC KJO Third Verifying Inspector Insp QA/QC party Document
ector did not show proceed
RFI= Issuued for H & W only
TION, AND 5 SCHOOLS PACKAGE -KHAFJI Rev.00 Discipline:
ITP-C-024 CIVIL
Quality Record or CCEQC SCEC KJO Third Document Inspector ln«p OA/QC party
ector did not show proceed
RFI= Issuued for H & W only