To assist General Contruction Estimators in estimating durations of labor time.
Descripción: Psiclogia II
Semiología II
Hoja de Trabajo
-
Introducción a la QuímicaDescripción completa
Descripción: Previos de practica 1 a 10 de Lab de general II de Fac. de quimica
gtrgDescripción completa
-Deskripsi lengkap
Descripción: Material de estusio enfermeria General 2
lic.enfermeria
Descripción completa
Semiología IIDescripción completa
for competitive exams
univ maimonides
construction techniques equipment and practicesFull description
Full description
Descrição completa
Illustrated Illustrat ed Seque
Phases of a Single House Constr
Pre Construction Phase
Brief - Design – Plan – Finance – Approvals
The amount of time needed to develop a c
Careful planning is required to e situated in relation to
The first stage of construction invol on the property.
Substructure – Bulk E
1. General Site Grading – RL 2. Earthwork excavation for founda 3. Earthwork for Utilities, Trenches
Anti termite
In some cases, unusual site conditio may require additional measures such as sump pumps, ditching or d topsoil and excavated material su eliminate the need to import fill a
Superstructure – Grade Slab, Fr Elements
1. 2.
Earthwork Filling Anti termite treatment Grade Slab/ Slab Grade
Trades
1. Ear 2. An
Con
Framed Structures
Formworks System
Scaffolding System
Plumbing 1. Concealed works – Pipes, Condui 2. Associated civil works – water pr 3. Pulling of wires generally done a
pl ed
tl af
F 1. External Brickwork 2. External Plastering 3. External Painting 4. Stone Finishes
1. Holdfasts 2. Door/ window Frames –fixing & 3. Fixing of doors windows – wood
1. final grading, 2. driveways, 3. steps,
walkways,
2.
Formworks
It should be strong enough to withstand al
It should be rigidly constructed and efficie horizontally and vertically, so as to retain it
The joints in the formwork should be tight
Construction of formwork should permit re desired sequences without damage to the
Economy in Formwork
The plan of the building should imply mi size of rooms, floor area etc. so as t repeatedly. Design should be perfect to use slender way. Minimum sawing and cutting of wooden
Timber Formworks
Timber for formwork should satisfy the follow It should be
well seasoned
light in weight
easily workable with nails without splitting free from loose knots
Plywood Formworks
Resin bonded plywood sheets are attached to panels of required sizes. The cost of plywood with that of timber shuttering and it may eve in view of the following considerations:
It is possible to have smooth finish in whic
Steel Formworks Steel Formwork
This consist of panels fabricated out of thin edges by small steel angles.
The panel units can be held together throu bolts and nuts.
The panels can be fabricated in large numb
Steel & Timber based F Comparison
Steel forms are stronger, durable and have formwork and their reuses are more in num
Steel forms can be installed and dismantle
Construction of Formw
Propping and centring Shuttering Provision of camber Cleaning and surface treatment
Removal of Formwork
Shuttering forming the vertical faces of wa removed first as they bear no load but onl
Shuttering forming soffit of slabs removed
Shuttering forming soffit of beams, girders shuttering removed in the end.
Rapid hardening cement, warm weather a
Period of Removal of For S. No. Description of structural membe 1
Walls, columns and vertical sides o
2
Slabs (props left under)
3
Beam soffits (props left under)
4
Removal of props to slabs (a) For slabs spanning upto 4 5 m