SPECIFICATION REPORT Name of the work:-Repairs to the Damaged Culvert at Idduvanipalem Est.Cost.Rs.0.50 lakhs As per the instructions of the instructions of the Dy.Exe.Engineer,PR,Ichapuram and as per the need,it is proposed to repair the damaged culvert at Edduvanipalem village of Kavity(M). The village Idduvanipalem is situated at sea-shore edge.The villagers are always being suffered due to erosion of houses and road portion ,due to sea back water tides and waves.The above village road is gradually eroding.Further,the existing culvert at the entrance of the village is badly damaged and the deck slab of the culvert is partially collapsed.Due to the rains from 3-10-2004 to 6-10-2004,the culvert is further damaged and road portion was also partially eroded.At present only two wheelers can go on the culvert. Hence,it is proposed to repair the culvert and to strengthen the eroded road portion by gravel packing.The following provisions are made in the estimate. 1.Provision for cost and supply of steel 2.Provision for Rabbit Mesh 3.Provision for C.C(1:2:4) for parapet walls 4.Provision for VRCC(1:2:4) for DECK SLAB 4.Provision for gravel packing The estimate is prepared as per the current SSR,i.e.2004-2005 rates and the work will be carried out as per APDSS.
Asst.Executive Engineer PR(spl),Ichapuram
ABSTRACT-CUM-DETAILED ESTIMATE Name of the Sub work:-Repairs to the Damaged Slab Culvert at Idduvanipalem village Est.Cost:Rs.0.50 lakhs S.No
Description of item
Nos Length
1
4
1X2
Per
0.45
0.40
1.44Cum 1.44Cum
2313.80
1.00Cum
3.50
2.00
0.24
3.36Cum
3213.65
1.00Cum
Cost,supply and fabrication charges of steel including cost of binding wire and all labour charges etc.complete 400.00Kgs 33.28
1.00Kg
Cost,supply of Rabbit mesh for repairs to deck slab 3.50
2.00
----
14.00Sqm
79.04
1.00Sqm
Filling with gravel in the eroded road portion including watering and rolling with hand road roller including all labour charges etc.complete
Eroded road portion
5
4.00
1X2
1X2 5
Rate
VRCC(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materials and all labour charges including machine mixing and vibrating charges but excluding cost and fabrication charges of steel for deck slab Deck slab
3
Quantity
Cement Concrete(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materials and all labour charges including machine mixing charges Parapet walls
2
Measurements Bredth Depth
1X1
25.00
Provision for unforeseen items,if any
(1.5+2.5)/2
1.00
#########
207.77
1.00Cum
--------LS-----------TOTAL
Asst.Executive Engineer PR(spl),Ichapuram
Amount
7.5 3332
10798
13312
1107
20777
674 50000
0.24
2.6
4.68 80 374.4
LEAD STATEMENT Name of the work:-Repairs to the damaged culvert at Idduvanipalem,Est.Cost.Rs.0.50 lakhs S.No
Description of item
Name of the quarry MR
1 2 3 4
Gravel Sand for Mortar 40mm HBG metal-SS5 20mm HBG metal-SS5
Rajapuram Bahuda river Rattakanna Rattakanna
Lead in Kms CT Total
17.40 21.90 27.40 27.40
0.00 0.00 0.00 0.00
17.40 21.90 27.40 27.40
Initial Cost
38.50 71.00 269.00 470.00
Conveyance Seinorage Blasting charges
132.40 145.90 183.90 183.90
20.00 36.00 45.00 45.00
0.00 0.00 53.00 53.00
Machine Deduct Total crushing stacking charges 0.00 0.00 0.00 0.00
(-)3.70 (-)3.70 (-)6.10 (-)6.10
187.20 249.20 544.80 745.80
Certified that the above leads are correct to the best of my knowledge
Asst.Executive Engineer PR(spl),Ichapuram
DATA SHEET Name of the work:-Repairs to the Damaged culvert at Idduvanipalem Est.Cost.Rs.0.50 lakhs S.No Quantity 1
Rate
Per
Amount
Cement Concrete(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materials and all labour charges including machine mixing charges for parapet walls 0.92Cum 0.46Cum 330.00Kg 1.00Cum 1.00Cum 1.50Nos
2
Description of item
Cost of 20mm HBG metal Cost of sand Cost of cement Labour charges Machine mixing charges Woman Mazdoor Add TOT@4%
745.80 249.20 2700.00 350.54 31.00 101.00
1.00Cum 1.00Cum 1000.00Kg 1.00Cum 1.00Cum 1.00Cum
686.14 114.63 891.00 350.54 31.00 151.50 88.99
TOTAL
2313.80
VRCC(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materials and all labour charges including machine mixing and vibrating charges but excluding cost and fabrication charges of steel for deck slab
DATA SHEET Name of the work:-Repairs to the Damaged culvert at Idduvanipalem Est.Cost.Rs.0.50 lakhs S.No Quantity 1
Per
Amount
Cost of 20mm HBG metal Cost of sand Cost of cement Labour charges Machine mixing charges Woman Mazdoor Add TOT@4%
745.80 249.20 2700.00 350.54 31.00 101.00
1.00Cum 1.00Cum 1000.00Kg 1.00Cum 1.00Cum 1.00Cum
686.14 114.63 891.00 350.54 31.00 151.50 88.99
TOTAL
2313.80
VRCC(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materials and all labour charges including machine mixing and vibrating charges but excluding cost and fabrication charges of steel for deck slab 0.92Cum 0.46Cum 330.00Kg 1.00Cum 1.00Cum 1.00Cum 1.00Cum 1.50Nos
3
Rate
Cement Concrete(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materials and all labour charges including machine mixing charges for parapet walls 0.92Cum 0.46Cum 330.00Kg 1.00Cum 1.00Cum 1.50Nos
2
Description of item
Cost of 20mm HBG metal Cost of sand Cost of cement Labour charges Machine mixing charges Centring charges Vibrating charges Woman Mazdoor Add TOT@4%
Cost,supply and fabrication charges of steel including cost of binding wire and all labour charges etc.complete 1.00Kg Cost and supply of steel 1.00Kg Fabrication charges of steel Add TOT@4%
28.00 4.00
1.00Kg 1.00Kg
TOTAL 4
28.00 4.00 1.28 33.28
Filling with gravel and rolling the formation with hand road roller irrespective of thickness including cost and conveyance of all materials and all labour charges etc.complete. 1.00Cum Cost of gravel 1.00Cum Labour charges Add TOT@2%