Hazard and Risk Assessment
DESIGN RISK ASSESSMENT FORM Date
6th Mar 2009
Activity
Set up site
Project
Hazard
Multi-storey Car Park
Persons in danger
Comments
As the machinery is moving into the site noise pollution, dust, and vibration will occur
Review Date
Concept
Score <3 = Low; <6 = M edium; edium; >6 = H igh igh Severity 1-3 2
Likelihood 1-3 3
Controls
Action
Machinery will move into the site on non working hours
1.
Risk
heavy machinery moving to the site
1. 2.
Walking through the site
Tripping or falling into the excavated area
1.Labourers
When moving through the site labourers should be aware of excavation area
2
1
L
Place protective tape to outline excavation boundaries
Labourers Forman
Exca Excava vati tion on
Risk Risk of soil soil failure Contaminated land Underground services
1. Labo Labour urer erss
3
2
M
1. A supporting material should be used in order to prevent soil failure. 2.beware of underground
Civil engineer Forman Labourers
LANT AND P LANT AND
Heavy machinery moving through university grounds
Labourers Students
The The soil soil soil should shou should ld be be properly supported with formwork Samples of the soil should be checked for contamination Appropriate layout plans Excavators and moving trucks carrying materials have limited visibility especially when conducting work or when fully loaded
2
1
L
1. 1 .separate pedestrian, vehicle access points and routes around the site will be provided 2.in order to minimize the need reversing one-way systems or turning points will be provided 3.
Vehicle drivers operators
MACHINERY
Publ Public ic Labour Labourers ers
Design Stage
M
2.
1
Planni Planning ng supervisor – H+S Plan QS – Tender Tender docs
DESIGN RISK ASSESSMENT FORM Date
20th Nov 200
Activity
Project
Hazard
Rosebud Furniture Factory
Persons in danger
Design Stage
Comments
Review Date
Concept
Score <3 = Low; <6 = M edium; >6 = H igh
Controls
Action
Severity 1-3 3
Likelihood 1-3 2
Risk
M
Special protective gear Site manager such as steel toe-cap Forman boots, gloves, helmet, Engineer vest should be worn
Attire
Danger of injury due to lack of protection
Engineer Labourer
Proper attire must be worn when working in construction sites.
Site Management
Debris
Labourers Engineer
Debris left around on site can hamper movement around site and could be dangerous because someone might trip
2
1
L
Always keep site clean of debris to reduce chance of injury
Forman Labourers
Noise
Disturb students Disturb people in surrounding area
Students Public
Noise generated from machines and tools during construction
3
3
H
Constrain working hours to after University closes
Site manager
Flood risk
Flooding of site due to poor weather conditions
Labourers
Weather conditions are poor and rain is very probable flood risk must be considered