EHS MINUTES OF MEETING Project Name: KAUST – Research Park Utility Plants Prepared By: Richard Wang Purpose of Meeting: Weekly Meeting of HSE Department ATTENDEES
Description of Project: EPC Date of Meeting: th 18 -Oct-2012
ITEM
CNCEC –KAUST-HSE-MOM-00 05
Date of Report: Location of Meeting: Site Office
CNCEC
Richard Wang Leon Liang Md. Anwar Hossain Mojumder Dawood naveed Rui Bao
Serial. No:
OWNER
None
OTHERS
None
DESCRIPTION
Distribution: Attendees Plus:
ACTION BY
DUE DATE
STATUS
Summary of this week from 11st to 17th Oct 1. Completed TBT 6 time. 2. Completed DTRA 6 time . 3. Completed HSE Inspection 2 times. th 3.1 Villa safety audit on 14 Oct, 2012. th 3.2 Site inspection on 16 Oct, 2012. 4. Completed staff internal ID: 1 pcs (1 management staff) Total 90 staff’s ID completed (including 48 construction staff and 42 management staff) 5. Hold HSE Training 3 times. 5.1 Completed orientation course for 3 new comers (Vehicle Drivers) on 13rd Oct 2012.
MOM-0005
Page 1
5.2 Completed orientation course for 1 vehicle drivers th on 17 Oct 2012.
5.3 Held internal training for HSE staff on 13rd Oct 2012.
MOM-0005
Page 2
th
th
Work plan for next week form 18 to 24 Oct. 9
10
11
12
13
Prepare vehicle sticker of CNCEC. The sample of vehicle sticker has been submitted SAPMT for review. Pepare carry out color code for October with red color. The store office who name is Fu Guiliang, and his contact phone No. is 0515142538 (54) th Electrical Tool/Equipment check by Electric Engineer on 18 Oct, 2012. Camp /Villa Track safety issues improvement. We will inspection to Villa next Sunday. The safety inspection for Villa has been finished by Richard st Wang on 1 Oct, detail inspection form and corrective action please see appendix 1. Human Resource & Training Information We will hold internal training for all safety staff by Anwar next week. Completed camp evacuation chart Found fire-fighting emergency response team for camp. The team members minimum requirement 6 per son, and then, we’ll give him training and exercise. Team leader: Ma Laiming (Admin) Team member: Zhou Liangzhong (Chief cook) Shi Lei (Cook) Lu Changhui (Cook) He Guangming (Labor)
MOM-0005
Anwar Richard Wang Sun Bo
Started after SAPMT approved. nd 22 Oct.
Open
Richard Wang Daud
Electrician will inspection on this afternoon(1 1st Oct)
On-going
Anwar
Anwar/Rich ard Wang Ma Laiming Richard Wang
On-going
th
10 Oct
On-going
Page 3
Sun Bo 14
(Supervisor)
As per construction information from PM, we may start the backfilling for the 3 buildings next week, we need ready everything see below for make sure backfilling start in time. Orientation for drivers. Certification confirmation both drivers and vehicles. Prepared DTRA & JHA for backfilling and transport. Training for construction supervisor or engineers for DTRA
HSE Dprt.
As per construction schedule
All information about backfilling provide by Admin & construction department. Backfilling for operation room of RO will be start from 20 (the related information sourced Mr.Faiyaz).
th
Oct
Concern: The 3 drive licenses whom operation heavy equipment for backfilling con not provide to HSE department including 1 roller, 1 loader and 1 JCB.