Inspection and Test plan for Piping Fabrication, erection and testing work at Oil & Gas, Power plant construction industries.Full description
ddd
Sample Inspection and Test Plan for Screed WorksFull description
inspections and test plan for painting works. How to proceed on painting step by step.
Full description
Inspection and Test Plan for Storage Tank
Inspection and test program description for piling
Description : mechanical insulation
54 ITP-For PipingFull description
Industrial insulation
Guia de estudio para el ahorro de energia y dinero en la industria, mediante una buena tecnologia mediante el aislamiento termico de tuberias y componentes.
ITPFull description
Inspection test plan for piping system in OIL & GASFull description
inspections and test plan for painting works. How to proceed on painting step by step.Descrição completa
Full description
MS for insulationFull description
Full description
inspection test plan
1+13
UPPER ZAKUM 750 ISLANDS SURFACE FACILITIES PROJECT – EPC2 PROJECT No. P7512 INSPECTION AND TEST PLA N FOR INSULATION WORK Doc. No. P7512-04-001-YS-ITP-0002
Rev. C
Page: 1 of 1 3
UPPER ZAKUM 750 ISLANDS SURFACE FACILITIES PROJECT – EPC2 PROJECT No. P7512 CONTRACT No. : CT750 UZ110110 PETROFAC JOB No.: PE-103 INSPECTION AND TEST PLAN FOR INSULATION WORK DES-1358‐ITP‐012
SUBCON. Document. No.
Document Rev.
C
SUBCON. No.
SUBCON. NAME
SUBCONTRACT TITLE
04‐001
Descon Engineering
STR, Mechanical & Piping Works for all Islands
REVIEW CODE
1
2
3
4
5
Legend: 1. Approved;
2. Approved With Comments; 3. Reviewed With Comments, Correct & Re-Submit;
UPPER ZAKUM 750 ISLANDS SURFACE FACILITIES PROJECT – EPC2 PROJECT No. P7512 INSPECTION AND TEST PLA N FOR INSULATION WORK Doc. No. P7512-04-001-YS-ITP-0002
Rev. C
Page: 2 of 1 3
TABULATION OF REVISED SECTIONS / PAGES REV
PAGE
DESCRIPTION
A
Initial Review
B
Comments Incorporated
C
Issued for approval
TABULATION OF HOLDS PAGE / SECTION
DESCRIPTION OF HOLD
UPPER ZAKUM 750 ISLANDS SURFACE FACILITIES PROJECT – EPC2 PROJECT No. P7512 INSPECTION AND TEST PLA N FOR INSULATION WORK Doc. No. P7512-04-001-YS-ITP-0002
Rev. C
Page: 3 of 1 3
TABLE OF CONTENTS
1.
LIST OF VERIFYING DOCUMENTS ……………………………………………………………………………………. 4
UPPER ZAKUM 750 ISLANDS SURFACE FACILITIES PROJECT – EPC2 PROJECT No. P7512 INSPECTION AND TEST PLA N FOR INSULATION WORK Doc. No. P7512-04-001-YS-ITP-0002
Rev. C
Page: 4 of 1 3
1. LIST OF VERIFYING DOCUMENTS (ITRS) P7512-V-0301-X-I
Hot Insulation Application Report
P7512-V-0302A-I
Final Insulation Inspection Report
ITR Copy not attached
2. DEFINITIONS
PROJECT
:
UZ 750 Upper Zakum Islands Surface Facilities (EPC - 2)
COMPANY
:
Zakum Development Company (ZADCO)
CONTRACTOR
:
Petrofac Emirates & DSME
SUB-CONTRACTOR
:
Descon Engineering
3. AB BREVA TIONS
GA
:
General Arrangement
CRA
:
Corrosion resistance alloy
MIR
:
Material Inspection Report
IFC
Issued For Construction
UPPER ZAKUM 750 ISLANDS SURFACE FACILITIES PROJECT – EPC2 PROJECT No. P7512 INSPECTION AND TEST PLA N FOR INSULATION WORK Doc. No. P7512-04-001-YS-ITP-0002
Rev. C
Page: 5 of 1 3
4. REFERENCE DOCUMENTS The following documents are used as source of reference and may be read in conjunction with the procedure.
Repeated 2 times?
P7512-TS-2000-Y-0003 P7512-TS-2000-W-0002
Coating and Lining Specification
P7512-TS-2000-Y-0003
PED Coating and Lining Specifications
P7512-PD-2000-Q-0038
PED Inspection and Test Plan for Hot Insulation
P7512-04-001-YS-MTS-0001
MS for Surface preparation, painting, and Holiday test
Thermal and Acoustical Insulation specifications
UPPER ZAKUM 750 ISLANDS SURFACE FACILITIES PROJECT – EPC2 PROJECT No. P7512 INSPECTION AND TEST PLAN FOR INSULA TION WORK Doc. No. P7512-04-001-YS-ITP-0002
Rev. C
Page: 6 of 13
P1358 for UZ750? DESCON Document No: P1358-ITP-012
Activity / Item Covered: INSPECTION AND TEST PLAN FOR INSULATION WORK
Requisition No:TBA Tag No(s):TBA
Vendor / Contractor name:Consortium of Petrofac Emirates LLC and Daewoo Shipbuilding and Marine Engineering (*) QC SURVEILLANCE POINTS
Co. Ltd.
Sub- Vendor / Sub-Contractor name:Descon Engineering Vendor / Contractor QA/QC Manager:Nadir Abbas QC Responsible on the implementation of this ITP: QC Team
H
: Hold Point
W
: Witness Inspection
S
: Operation Surveillance
A
: Approval Required
R
: Review of Documentation
EXECUTION STEP
Item
Quality Control
Reference
Characteristics t o be verified/
Act ivi ty
document
frequency
Project
Control of
1
Inspection test and measuring equipment
Specifications P7512‐TS‐2000‐ W‐0002,
clause 18.4 Manufacturer’s data sheet
Acc eptan ce Cri teri a
Contractor QC Procedure
Verifying
Person
document/
responsible for
Record
the inspection
SURVEILLANCE POINTS (*)
ance DES
PED
H
A
TPIA
ZADCO
Review & Verification of validity of Calibration Certificate with reference to instrument
In accordance with
serial number / identification
approved calibration of
number.
measurement and test equipment procedure
Verify Condition of test
MS For Insulation Work P7512-04-001YS-MTS-0002
Valid calibration certificate
Good working condition
Insulation Supervisor Piping/Insulation
Acc ept
Inspector
equipment
Remove TPI column if not applicable (Typ)
R
Status
Comment (s)
UPPER ZAKUM 750 ISLANDS SURFACE FACILITIES PROJECT – EPC2 PROJECT No. P7512 INSPECTION AND TEST PLAN FOR INSULA TION WORK Doc. No. P7512-04-001-YS-ITP-0002
Density as Specified. Product Batch number. Material Certificate. Shelf Life.
MS For Insulation Conformance to Requirements
Work
P7512‐04‐001‐ YS‐MTS‐0002
MAR for Insulation Material.
Piping/Insulati on Inspector
Acc ept
Status
Comment (s)
UPPER ZAKUM 750 ISLANDS SURFACE FACILITIES PROJECT – EPC2 PROJECT No. P7512 INSPECTION AND TEST PLAN FOR INSULA TION WORK Doc. No. P7512-04-001-YS-ITP-0002
Item
Quality Control
Reference
Characteristics t o be verified/
Act ivi ty
document
frequency
Rev. C
Acc eptan ce Cri teri a
Page: 8 of 13
Contractor QC
Verifying
Person
Procedure
document/Record
responsible for the inspection
3.1
Material Receiving Inspection
Comply with
MAR for Insulation
Material Test Certificates
material
Manufacturer’s Data Sheet and Project Specifications
MS for insulation work and P7512‐ TS‐2000‐W‐0002
4
Storage of Insulation Material
Product Data Sheet.
MSDS
manufacturer's Data
Implemented
sheet and Project
to avoid moisture and dust
Specifications P7512‐ TS‐2000‐W‐0002
Product Data Sheet must contain a minimum mositure content and that maximum figure should be used to define whether N/A Availability of Tools excess moisure is present.
MS For Insulation Work
P7512‐04‐001‐ YS‐MTS‐0002
House keeping
Company specification Z0‐TS‐Y‐03010 & Z0‐TS‐Y‐ Tools and
5
03020
Equipment
Project Specifications P7512‐TS‐ 2000‐W‐0002,
on Inspector
PED
H
W
TPIA
ZADCO
S
W
Company Comply with
Material Manufacture is
Covered with plastic sheets
certificate
Piping/Insulati
DES
clause 18.1.1
Storage Condition as Stipulated by the Insulation
Material test
SURVEILLANCE POINTS (*)
specification
Insulation
Z0‐TS‐Y‐03010
Supervisor
& Z0‐TS‐Y‐
Piping/Insulati
03020
on Inspector
W
W
S
H
S
S
Manufacturer’s Data Sheet
clause 19.1 & 19.2
Approved QCP/Hot, Cold & PP Insulation
Insulation
application
Supervisor
manual
MS For Insulation Work
P7512‐04‐001‐ YS‐MTS‐0002
Visual
Piping/Insulation Inspector
Acc ept
Comment
ance
(s)
Status
UPPER ZAKUM 750 ISLANDS SURFACE FACILITIES PROJECT – EPC2 PROJECT No. P7512 INSPECTION AND TEST PLAN FOR INSULA TION WORK Doc. No. P7512-04-001-YS-ITP-0002
Item
Quality Control
Reference
Characteristics t o be verified/
Act ivi ty
document
frequency
Rev. C
Acc eptan ce Cri teri a
Page: 9 of 13
Contractor QC
Verifying
Person
Procedure
document/Record
responsible for the inspection
SURVEILLANCE POINTS (*) DES
PED
H
W
TPIA
ZADCO
Company Approved
specification Damage to
6
Surfaces Prior to
Z0‐TS‐Y‐03010
QCP/Hot, Cold &
& Z0‐TS‐Y‐
PP Insulation
03020
Installation of Insulation
application
Visual Inspection Project
No damage Smooth surfaces
Specifications
manual
Insulation
Release Note
W
Piping/Insulation
MS For Insulation
Inspector
Work
P7512‐TS‐
Supervisor
P7512‐04‐001‐ YS‐MTS‐0002
2000‐W‐0002,
Company specification
Approved
Z0‐TS‐Y‐03010
Release of Piping /
7
Equipment to
& Z0‐TS‐Y‐ 03020
Commence Insulation
Project
QCP/Hot, Cold & PP Insulation
Release Note by Piping and Painting Disciplines
Surface Clean, Dry and Free
Specifications P7512‐TS‐ 2000‐W‐0002,
clause 18.1.2
from Moisture
Spool Release Note
manual
MS For Insulation Work
P7512‐04‐001‐ YS‐MTS‐0002
W
Insulation
application
Release Note
Supervisor Piping/Insulati on Inspector
H
R/S
R/S
Acc ept
Comment
ance
(s)
Status
UPPER ZAKUM 750 ISLANDS SURFACE FACILITIES PROJECT – EPC2 PROJECT No. P7512 INSPECTION AND TEST PLAN FOR INSULA TION WORK Doc. No. P7512-04-001-YS-ITP-0002
Item
Quality Control
Reference
Characteristics t o be verified/
Act ivi ty
document
frequency
Rev. C
Acc eptan ce Cri teri a
Page: 10 of 13
Contractor QC
Verifying
Procedure
document/Record
Person
SURVEILLANCE POINTS (*)
responsible for the inspection
ance DES
PED
H
W
TPIA
ZADCO
Insulation / PP Support Rings Expansion Joints at Specified
8
1‐ Installation of Insulation plus fixing (Hot ,Cold & Acoustic service) 2‐Joint Sealant Application (in Cold Service) 3‐Vapor Barrier and Scrim Cloth Application (In Cold Service) 4‐Support Ring and Mesh Installation (PP Insulation)
Intervals. Company
Correct type Thickness, Size,
specification Z0‐TS‐Y‐03010
Condition and shape.
& Z0‐TS‐Y‐
Correct and Correctly Spaced
03020
out.
Project
Insulation Layering
Specifications P7512‐TS‐
Staggering is Correct.
Joint Sealant applied properly
2000‐W‐ 0002sheet
Approved
Banding and Fastening is
in Cold Insulation.
Vapor Barrier and Scrim Cloth Applied Properly in Cold Insulation.
PP Mesh Installed Properly
clause 17 & 18
QCP/Hot, Cold &
Conformity to Specified Requirements
PP Insulation
Insulation
application manual
MS For Insulation Work
P7512‐04‐001‐ YS‐MTS‐0002
ITR‐V‐0301X‐I
Supervisor Piping/Insulati on Inspector
Acc ept
S
Status
Comment (s)
UPPER ZAKUM 750 ISLANDS SURFACE FACILITIES PROJECT – EPC2 PROJECT No. P7512 INSPECTION AND TEST PLAN FOR INSULA TION WORK Doc. No. P7512-04-001-YS-ITP-0002
Item
Quality Control
Reference
Characteristics t o be verified/
Act ivi ty
document
frequency
Rev. C
Acc eptan ce Cri teri a
Page: 11 of 13
Contractor QC
Verifying
Person
Procedure
document/Record
responsible for the inspection
SURVEILLANCE POINTS (*) DES
PED
H
W
TPIA
ZADCO
Installed Insulation Layer is dry and free from Moisture.
Correct Cladding Material is used.
Correct Thickness and Profile. Joint Overlap and Terminations are Correct and Company specification Z0‐TS‐Y‐03010 & Z0‐TS‐Y‐
Longitudinal and circumferential seams at correct distance. (For piping and Equipment as applicable)
Approved sealant applied. Banding over Cladding is of Correct and spaced at required Intervals.
Screws and Rivets are of Correct Type and Material
Any metal cladding applied does not make contact with clad item and min. clearance and overlap to be ensure.
Sufficient bolt clearance at valve & Flanges. Min. clearance is equal to the Stud bolt +25mm or as per Spec.
Conformity to Specified Requirements
Insulation
MS For Insulation Work
P7512‐04‐001‐ YS‐MTS‐0002
Supervisor
ITR‐V‐0301X‐I
Piping/Insulati on Inspector
S
Acc ept
Comment
ance
(s)
Status
UPPER ZAKUM 750 ISLANDS SURFACE FACILITIES PROJECT – EPC2 PROJECT No. P7512 INSPECTION AND TEST PLAN FOR INSULA TION WORK Doc. No. P7512-04-001-YS-ITP-0002
Item
Quality Control Acti vit y
Reference
Characteristics to be verified/
document
frequency
Rev. C
Accep tanc e Crit eria
Page: 12 of 13
Contractor QC
Verifying
Procedure
document/Record
Person
Acc ept
SURVEILLANCE POINTS (*)
responsible for the inspection
ance DES
PED
TPIA
ZADCO
Company specification Z0‐TS‐Y‐03010
Repair of
10
Insulation and Cladding
& Z0‐TS‐Y‐ 03020
Insulation shall be Repaired Prior to Cladding
Repairs or Rework Shall be noted and Carried out in
Project
Accordance With the
Specifications
Manufacturer’s Approved
P7512‐TS‐
Specified Requirements
Insulation
MS For Insulation Work
P7512‐04‐001‐ YS‐MTS‐0002
Supervisor
ITR‐V‐0301X‐I
Piping/Insulati
H
H
W
H
H
H
on Inspector
Procedure.
2000‐W‐ 0002sheet
Conformity to
clause 18.6 Company specification Z0‐TS‐Y‐03010 & Z0‐TS‐Y‐ 03020
Activities
Project
11
Final Visual
Specifications
Inspection
P7512‐TS‐
All Activates Completed and Documented
2000‐W‐ 0002sheet
Manufacturer’ s Data Sheet
clause 18.5 & 18.7
Conformity to Specified Requirements
Insulation
MS For Insulation Work
P7512‐04‐001‐ YS‐MTS‐0002
Supervisor
ITR‐V‐0302A‐I
Piping/Insulati on Inspector
Status
Comment (s)
UPPER ZAKUM 750 ISLANDS SURFACE FACILITIES PROJECT – EPC2 PROJECT No. P7512 INSPECTION AND TEST PLAN FOR INSULA TION WORK Doc. No. P7512-04-001-YS-ITP-0002