EMPLOYER
ENGINEER
CONTRACTOR
Ministry of Transport & Communications Directorate General of Roads & Land Transport P.O.Box27, P.C.114 Sultanate of Oman
COWI & Partners LLC P.O.Box2115, P.C.112 Sultanate of Oman
Khalid Bin Ahmed & Sons LLC – CORSAN CORVIAM JV Al Azaiba P.O. Box723, P.C.130 Sultanate of Oman
CONTRACT NO.: 95/2012
BS2P2 - Dualization of Bibbid-Sur Road, Section 2, Part 2
INSPECTION AND TEST PLAN
PILING DOCUMENT No.: KAS-CC JV/BS2P2/ITP/QA/009
Prepared
Approved
Date: 16/11/14
Date: 16/11/14
Antonio Tomás González Losa
Miguel Angel Lorente Sánchez
QA/QC Manager
Project Director
RECORD OF MODIFICATIONS Rev. Section Modified 00
INITIAL ISSUE
Description of the modification FOR ENGINEER APPROVAL
Date
16/11/2014
EMPLOYER
ENGINEER
CONTRACTOR
Ministry of Transport & Communications Directorate General of Roads & Land Transport P.O.Box27, P.C.114 Sultanate of Oman
COWI & Partners LLC P.O.Box2115, P.C.112 Sultanate of Oman
Khalid Bin Ahmed & Sons LLC – CORSAN CORVIAM JV Al Azaiba P.O. Box723, P.C.130 Sultanate of Oman
Contract No.: 95/2012 DOC No: KAS-CC JV/SB2P2/ITP/QA/009 Rev.00
ITEM OF INSPECTION
BS2P2 - Dualization of Bibbid-Sur Road, Section 2, Part 2 INSPECTION AND TEST PLAN
REFERENCE DOCUMENTS SPEC.
STANDARDS
PILING
Date: 16/11/2014
TYPE OF INSPECTION AND FREQUENCY / INSPECTION PARTY FOLLOW-UP DOCUMENTS
Indust Park
Subcont Product
Survey
NOTES/ ACCEPTANCE CRITERIA
Quality Engineer Frequency
FIRST PART _ ICL009.1
0.
ITP SCOPE
1.
PRELIMINARY
2.
SETTING OUT AND WORK PLATFORM
2.1
Work platform availability
2.2
Temporary bench mark location
Special Specifications. Section 10 General Specifications Section 10 Special Specifications. Sub-section 10.1.3.1 General Specifications Sub-section 10.1.3.1 Special Specifications. Section 10 General Specifications Section 10 Special Specifications. Section 10 General Specifications Section 10 Special Specifications. Section 10 General Specifications Section 10
This Section covers requirements for supplying and installing cast in-situ concrete and steel piles by boring.
KAS-CC JV/BS2P2/ICL/QA/0 09.1
KAS-CC JV/BS2P2/ICL/QA/0 09.1 Daily report KAS-CC JV/BS2P2/ICL/QA/0 09.1 Daily report Survey report
H
H
H
H
H
H
H
H
H
H
100%
Shop drawings approved Method Statement approved Work program approved ITP approved Concrete trial mixes approved
W
W
100%
In accordance to approved drawings
W
W
100%
In accordance to approved drawings
(*) When the results show consistent behaviour, the tests for shear strength and pH value may be discontinued, and tests to determine density and viscosity shall be carried out as agreed with the Engineer. INSPECTION CODE:
H – Hold Point
Form No.: KAS-CC/SB2P2/OP/QA/01.06
W – Witness Point
S - Surveillance
NIR – No Inspection Requested Page 2 of 9
EMPLOYER
ENGINEER
CONTRACTOR
Ministry of Transport & Communications Directorate General of Roads & Land Transport P.O.Box27, P.C.114 Sultanate of Oman
COWI & Partners LLC P.O.Box2115, P.C.112 Sultanate of Oman
Khalid Bin Ahmed & Sons LLC – CORSAN CORVIAM JV Al Azaiba P.O. Box723, P.C.130 Sultanate of Oman
Contract No.: 95/2012 DOC No: KAS-CC JV/SB2P2/ITP/QA/009 Rev.00
ITEM OF INSPECTION
2.3
Pile location and numbering
3.
FOLLOW-UP ACTIVITIES
3.1
Piling rig setting up
3.2
Casing verticality and position for Bucket & Auger pile
BS2P2 - Dualization of Bibbid-Sur Road, Section 2, Part 2 INSPECTION AND TEST PLAN
REFERENCE DOCUMENTS SPEC.
STANDARDS
Special Specifications. Section 10 General Specifications Section 10 Special Specifications. Section 10 General Specifications Section 10 Special Specifications. Subsection 10.1.3.2 General Specifications Sub-section 10.1.3.2 Special Specifications. Sub-section 5.3.3.9. Item 16a
PILING
Date: 16/11/2014
TYPE OF INSPECTION AND FREQUENCY / INSPECTION PARTY FOLLOW-UP DOCUMENTS
Indust Park
Subcont Product
KAS-CC JV/BS2P2/ICL/QA/0 09.1 Daily report Survey report Pile Record Sheet
H
H
KAS-CC JV/BS2P2/ICL/QA/0 09.1 Daily report Pile record Sheet
S
KAS-CC JV/BS2P2/ICL/QA/0 09.1 Daily report Pile record Sheet
S
Survey
NOTES/ ACCEPTANCE CRITERIA
Quality Engineer Frequency
H
W
100%
As per approved drawings and work program. Tolerances: Position: 75 mm in any direction at the pile head
S
W
W
100%
In accordance to approced shop drawing. Approved equipment is used
S
W
W
100%
Verticality: 1 in 75 deviation
H
(*) When the results show consistent behaviour, the tests for shear strength and pH value may be discontinued, and tests to determine density and viscosity shall be carried out as agreed with the Engineer. INSPECTION CODE:
H – Hold Point
Form No.: KAS-CC/SB2P2/OP/QA/01.06
W – Witness Point
S - Surveillance
NIR – No Inspection Requested Page 3 of 9
EMPLOYER
ENGINEER
CONTRACTOR
Ministry of Transport & Communications Directorate General of Roads & Land Transport P.O.Box27, P.C.114 Sultanate of Oman
COWI & Partners LLC P.O.Box2115, P.C.112 Sultanate of Oman
Khalid Bin Ahmed & Sons LLC – CORSAN CORVIAM JV Al Azaiba P.O. Box723, P.C.130 Sultanate of Oman
Contract No.: 95/2012 DOC No: KAS-CC JV/SB2P2/ITP/QA/009 Rev.00
ITEM OF INSPECTION
3.3
3.4
3.5
3.6
BS2P2 - Dualization of Bibbid-Sur Road, Section 2, Part 2 INSPECTION AND TEST PLAN
REFERENCE DOCUMENTS SPEC.
STANDARDS
PILING
Date: 16/11/2014
TYPE OF INSPECTION AND FREQUENCY / INSPECTION PARTY FOLLOW-UP DOCUMENTS
Indust Park
Subcont Product
Survey
NOTES/ ACCEPTANCE CRITERIA
Quality Engineer Frequency
Pile diameter, length, bottom cleaning and concrete requirement checking
Special Specifications. Sub-section 10.1.3.2 General Specifications Sub-section 10.1.3.3
KAS-CC JV/BS2P2/ICL/QA/0 09.1 Daily report Pile record Sheet
H
H
S
W
100%
Pile diameter an length per drawings. On completion of boring, the base of the pile shall be cleaned thoroughly with a cleaning bucket to ensure that there is no loose material in the base Drilling fluid shall be tested and results in accordance to manufacturer recommendations. If bentonite is isued properties will be: Density less 1.20 g/cm3 Fluid loss less than 40 mils (1.016 mm) Marsh viscosity less than 60 s Plastic viscosity less than20 cP Sand content less tha 3% Shear Strength 4 to 25 N/m2 pH: 9.5 to 11.7 Approved class 40 concrete mix design
Reinforcement cage
Special Specifications. Sub-section 5.2 General Specifications Sub-section 5.2
KAS-CC JV/BS2P2/ICL/QA/0 07.1 Daily report Pile record Sheet
H
H
H
H
100%
In accordance to drawings JV/BS2P2/ITP/QA/007
Concrete placement
Special Specifications. Sub-section 5.2 General Specifications Sub-section 5.2
KAS-CC JV/BS2P2/ICL/QA/0 07.1 Daily report Pile record Sheet Concrete Placement Record
S
S
W
W
100%
In accordance to ITP No. KAS-CC JV/BS2P2/ITP/QA/007
Concrete level
Special Specifications. Section 10 General Specifications Section 10
KAS-CC JV/BS2P2/ICL/QA/0 09.1 Daily report Pile record Sheet
S
S
W
W
100%
As per drawings
and
ITP
No.
KAS-CC
(*) When the results show consistent behaviour, the tests for shear strength and pH value may be discontinued, and tests to determine density and viscosity shall be carried out as agreed with the Engineer. INSPECTION CODE:
H – Hold Point
Form No.: KAS-CC/SB2P2/OP/QA/01.06
W – Witness Point
S - Surveillance
NIR – No Inspection Requested Page 4 of 9
EMPLOYER
ENGINEER
CONTRACTOR
Ministry of Transport & Communications Directorate General of Roads & Land Transport P.O.Box27, P.C.114 Sultanate of Oman
COWI & Partners LLC P.O.Box2115, P.C.112 Sultanate of Oman
Khalid Bin Ahmed & Sons LLC – CORSAN CORVIAM JV Al Azaiba P.O. Box723, P.C.130 Sultanate of Oman
Contract No.: 95/2012 DOC No: KAS-CC JV/SB2P2/ITP/QA/009 Rev.00
ITEM OF INSPECTION
3.7
BS2P2 - Dualization of Bibbid-Sur Road, Section 2, Part 2 INSPECTION AND TEST PLAN
REFERENCE DOCUMENTS SPEC.
STANDARDS
Pile as built position
Special Specifications. Section 10 General Specifications Section 10
TESTING
Special Specifications. Section 10 General Specifications Section 10
PILING
Date: 16/11/2014
TYPE OF INSPECTION AND FREQUENCY / INSPECTION PARTY FOLLOW-UP DOCUMENTS
Indust Park
KAS-CC JV/BS2P2/ICL/QA/0 09.1 Daily report Pile record Sheet Survey report
Subcont Product
H
H
Survey
H
NOTES/ ACCEPTANCE CRITERIA
Quality Engineer Frequency
W
W
100%
W
Once a day as supplied to drilling process Each pile from top and bottom of the pile prior concreting
As per drawings. Tolerances 75 mm in any direction at the pile head.
FIRST PART _ ICL009.2 4.
4.1
Drilling fluid testing. Density (To be made on polymer if recommended by manufacturer) (*)
Special Specifications. Sub-section 10.1.2 General Specifications Sub-section 10.1.3.2
API RP 138 B-1 ASTM D 4380
KAS-CC JV/BS2P2/ICL/QA/0 09.2 Daily report Pile Record Sheet Test report
H
H
W
If polymer: as per technical data sheet of the manufacturer If bentonite: During drilling, ≤ 1.10 g/cm3; from excavation prior concreting, ≤ 1.20 g/cm3
(*) When the results show consistent behaviour, the tests for shear strength and pH value may be discontinued, and tests to determine density and viscosity shall be carried out as agreed with the Engineer. INSPECTION CODE:
H – Hold Point
Form No.: KAS-CC/SB2P2/OP/QA/01.06
W – Witness Point
S - Surveillance
NIR – No Inspection Requested Page 5 of 9
EMPLOYER
ENGINEER
CONTRACTOR
Ministry of Transport & Communications Directorate General of Roads & Land Transport P.O.Box27, P.C.114 Sultanate of Oman
COWI & Partners LLC P.O.Box2115, P.C.112 Sultanate of Oman
Khalid Bin Ahmed & Sons LLC – CORSAN CORVIAM JV Al Azaiba P.O. Box723, P.C.130 Sultanate of Oman
Contract No.: 95/2012 DOC No: KAS-CC JV/SB2P2/ITP/QA/009 Rev.00
ITEM OF INSPECTION
4.2
4.3
Drilling fluid testing. Viscosity (To be made on polymer if recommended by manufacturer) (*)
Drilling fluid testing. Plastic Viscosity (To be made on polymer if recommended by manufacturer) (*)
BS2P2 - Dualization of Bibbid-Sur Road, Section 2, Part 2 INSPECTION AND TEST PLAN
REFERENCE DOCUMENTS SPEC.
STANDARDS
Special Specifications. Sub-section 10.1.2 General Specifications Sub-section 10.1.3.2
Special Specifications. Sub-section 10.1.2 General Specifications Sub-section 10.1.3.2
PILING
Date: 16/11/2014
TYPE OF INSPECTION AND FREQUENCY / INSPECTION PARTY FOLLOW-UP DOCUMENTS
API RP 138 B-1 ASTM D 6910
KAS-CC JV/BS2P2/ICL/QA/0 09.2 Daily report Pile Record Sheet Test report
API RP 138 B-1
KAS-CC JV/BS2P2/ICL/QA/0 09.2 Daily report Pile Record Sheet Test report
Indust Park
Subcont Product
H
H
H
H
Survey
NOTES/ ACCEPTANCE CRITERIA
Quality Engineer Frequency
W
W
W
W
Once a day as supplied to drilling process Each pile from top and bottom of the pile prior concreting Once a day as supplied to drilling process Each pile from top and bottom of the pile prior concreting
If polymer: as per technical data sheet of the manufacturer If bentonite: During drilling, 30 to 40 s; from excavation prior concreting, ≤ 60 s
If polymer: as per technical data sheet of the manufacturer If bentonite: During drilling, ≤ 10 cP; from excavation prior concreting, ≤ 20 cP
(*) When the results show consistent behaviour, the tests for shear strength and pH value may be discontinued, and tests to determine density and viscosity shall be carried out as agreed with the Engineer. INSPECTION CODE:
H – Hold Point
Form No.: KAS-CC/SB2P2/OP/QA/01.06
W – Witness Point
S - Surveillance
NIR – No Inspection Requested Page 6 of 9
EMPLOYER
ENGINEER
CONTRACTOR
Ministry of Transport & Communications Directorate General of Roads & Land Transport P.O.Box27, P.C.114 Sultanate of Oman
COWI & Partners LLC P.O.Box2115, P.C.112 Sultanate of Oman
Khalid Bin Ahmed & Sons LLC – CORSAN CORVIAM JV Al Azaiba P.O. Box723, P.C.130 Sultanate of Oman
Contract No.: 95/2012 DOC No: KAS-CC JV/SB2P2/ITP/QA/009 Rev.00
ITEM OF INSPECTION
BS2P2 - Dualization of Bibbid-Sur Road, Section 2, Part 2 INSPECTION AND TEST PLAN
REFERENCE DOCUMENTS SPEC.
STANDARDS
4.4
Drilling fluid testing. Shear Strength (To be made on polymer if recommended by manufacturer) (*)
Special Specifications. Sub-section 10.1.2 General Specifications Sub-section 10.1.3.2
4.5
Drilling fluid testing. Sand Content (To be made on polymer if recommended by manufacturer) (*)
Special Specifications. Sub-section 10.1.2 General Specifications Sub-section 10.1.3.2
PILING
Date: 16/11/2014
TYPE OF INSPECTION AND FREQUENCY / INSPECTION PARTY FOLLOW-UP DOCUMENTS
API RP 138 B-1
KAS-CC JV/BS2P2/ICL/QA/0 09.2 Daily report Pile Record Sheet Test report
API RP 138 B-1 ASTM D 4381
KAS-CC JV/BS2P2/ICL/QA/0 09.2 Daily report Pile Record Sheet Test report
Indust Park
Subcont Product
H
H
H
H
Survey
NOTES/ ACCEPTANCE CRITERIA
Quality Engineer Frequency
W
W
W
W
Once a day as supplied to drilling process Each pile from top and bottom of the pile prior concreting Once a day as supplied to drilling process Each pile from top and bottom of the pile prior concreting
If polymer: as per technical data sheet of the manufacturer If bentonite: During drilling, 4 to 25 N/m2; from excavation prior concreting, 4 to 25 N/m2
If polymer: as per technical data sheet of the manufacturer If bentonite: During drilling, ≤ 1%; from excavation prior concreting, ≤ 3%
(*) When the results show consistent behaviour, the tests for shear strength and pH value may be discontinued, and tests to determine density and viscosity shall be carried out as agreed with the Engineer. INSPECTION CODE:
H – Hold Point
Form No.: KAS-CC/SB2P2/OP/QA/01.06
W – Witness Point
S - Surveillance
NIR – No Inspection Requested Page 7 of 9
EMPLOYER
ENGINEER
CONTRACTOR
Ministry of Transport & Communications Directorate General of Roads & Land Transport P.O.Box27, P.C.114 Sultanate of Oman
COWI & Partners LLC P.O.Box2115, P.C.112 Sultanate of Oman
Khalid Bin Ahmed & Sons LLC – CORSAN CORVIAM JV Al Azaiba P.O. Box723, P.C.130 Sultanate of Oman
Contract No.: 95/2012 DOC No: KAS-CC JV/SB2P2/ITP/QA/009 Rev.00
ITEM OF INSPECTION
4.6
Drilling fluid testing. pH (To be made on polymer if recommended by manufacturer) (*)
4.7
Caliper logging test on the entire length of bored hole prior to concreting
4.8
Low strain dynamic test, sonic eco test or High strain dynamic testing or Cross-hole sonic logging
BS2P2 - Dualization of Bibbid-Sur Road, Section 2, Part 2 INSPECTION AND TEST PLAN
REFERENCE DOCUMENTS SPEC.
STANDARDS
Special Specifications. Sub-section 10.1.2 General Specifications Sub-section 10.1.3.2
Special Specifications. Sub-section 10.1.3.2
Special Specifications. Sub-section 10.2 General Specifications Sub-section 10.2
PILING
TYPE OF INSPECTION AND FREQUENCY / INSPECTION PARTY FOLLOW-UP DOCUMENTS
Indust Park
Subcont Product
Survey
API RP 138 B-1 ASTM D 4381
H
H
W
W
ASTM D 6167
KAS-CC JV/BS2P2/ICL/QA/0 09.2 Daily report Pile Record Sheet Test report
H
H
W
W
KAS-CC JV/BS2P2/ICL/QA/0 09.2 Daily report Pile Record Sheet Test report
H
H
H
H
ASTM D 4945 ICE-Section 9
NOTES/ ACCEPTANCE CRITERIA
Quality Engineer Frequency
KAS-CC JV/BS2P2/ICL/QA/0 09.2 Daily report Pile Record Sheet Test report
ASTM D 5882
Date: 16/11/2014
Once a day as supplied to drilling process Each pile from top and bottom of the pile prior concreting 5 No in the first week Provisiona lly 10 No thereafter , equally spaced through the works.
1%
If polymer: as per technical data sheet of the manufacturer If bentonite: During drilling, ≤ 1%; from excavation prior concreting, ≤ 3%
Acceptance in accordance to test result interpretarion
Acceptance in accordance to test result interpretarion
(*) When the results show consistent behaviour, the tests for shear strength and pH value may be discontinued, and tests to determine density and viscosity shall be carried out as agreed with the Engineer. INSPECTION CODE:
H – Hold Point
Form No.: KAS-CC/SB2P2/OP/QA/01.06
W – Witness Point
S - Surveillance
NIR – No Inspection Requested Page 8 of 9
EMPLOYER
ENGINEER
CONTRACTOR
Ministry of Transport & Communications Directorate General of Roads & Land Transport P.O.Box27, P.C.114 Sultanate of Oman
COWI & Partners LLC P.O.Box2115, P.C.112 Sultanate of Oman
Khalid Bin Ahmed & Sons LLC – CORSAN CORVIAM JV Al Azaiba P.O. Box723, P.C.130 Sultanate of Oman
Contract No.: 95/2012 DOC No: KAS-CC JV/SB2P2/ITP/QA/009 Rev.00
ITEM OF INSPECTION
4.9
Static Load Test
BS2P2 - Dualization of Bibbid-Sur Road, Section 2, Part 2 INSPECTION AND TEST PLAN
REFERENCE DOCUMENTS SPEC.
STANDARDS
Special Specifications. Sub-section 10.2 General Specifications Sub-section 10.2
In accordance to Special Specification, Tables 10.2.3.1 and 10.2.3.2 ASTM D 1143 or ASTM D 5882 Approved Method Statement
PILING
Date: 16/11/2014
TYPE OF INSPECTION AND FREQUENCY / INSPECTION PARTY FOLLOW-UP DOCUMENTS
Indust Park
KAS-CC JV/BS2P2/ICL/QA/0 09.2 Daily report Pile Record Sheet Test report
Subcont Product
H
H
Survey
NOTES/ ACCEPTANCE CRITERIA
Quality Engineer Frequency
H
H
2 preliminary pile tests shall be undertaken at each bridge location or agreed with the Engineer At least one percent of working pile tests shall be undertaken on piles agreed with the Engineer, or as shown on the Drawings
A preliminary test pile shall be considered to have failed when any of the following conditions apply: Any of the above criteria apply at working loads The maximum load specified has not been achieved A working pile shall be considered to have failed when any of the following conditions apply: On completion of a load test, the residual settlement after rebound exceeds 6 mm. The test load as specified in the contract shall not have been achieved. The maximum settlement under 1.5 working load specified on the drawings exceeds 10mm or 1% of the least lateral dimension of the pile, whichever is the greater.
(*) When the results show consistent behaviour, the tests for shear strength and pH value may be discontinued, and tests to determine density and viscosity shall be carried out as agreed with the Engineer. INSPECTION CODE:
H – Hold Point
Form No.: KAS-CC/SB2P2/OP/QA/01.06
W – Witness Point
S - Surveillance
NIR – No Inspection Requested Page 9 of 9